Letting of 5/31/2006 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 023-11-0027
Parish: UNION, CLAIBORNE
Routes: US 167
Description: LILLIE - ARKANSAS STATE LINE
Type Const: grading, drain struct, lime trmt, class ii bc, pccp (alt. a-1), superpave acp (alt.
a-2), concrete slab span bridges, and related work.
Estimated Construction Cost: $24,332,584.23
Maximum Number of Days Allowed for Construction: 725
Calculated Daily User Cost: $1,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 39462 DENTON-JAMES LLC $28,084,836.81 725 $28,809,836.81
2 34567 JAMES CONSTRUCTION GROUP LLC $28,526,196.27 725 $29,251,196.27
3 05789 D & J CONSTRUCTION CO., INC. $35,532,022.10 725 $36,257,022.10
 
Item Number Item Description Quantity Unit of Measure - 1 -
DENTON-JAMES LLC
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
D & J CONSTRUCTION CO., INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 890,000.00 890,000.00 835,000.00 835,000.00 750,000.00 750,000.00    
202-01 removal of structures & obstructions lump      lump 200,000.00 200,000.00 95,000.00 95,000.00 250,000.00 250,000.00    
202-02-A removal of 9.0 m x 29.0 m concrete slab span bridge
(rt. of sta. 94+400)
1      ea 18,700.00 18,700.00 50,000.00 50,000.00 30,000.00 30,000.00    
202-02-B-01 removal of concrete box culverts (sta. 88+908; 3-1.8 m
x 1.8 m x 14 m)
1      ea 1,000.00 1,000.00 10,000.00 10,000.00 5,000.00 5,000.00    
202-02-B-02 removal of concrete box culverts (sta. 94+263; 0.9 m x
0.6 m x 15 m)
1      ea 1,000.00 1,000.00 3,500.00 3,500.00 5,000.00 5,000.00    
202-02-B-03 removal of concrete box culverts (sta. 95+074; 0.9 m x
0.6 m x 23 m)
1      ea 1,000.00 1,000.00 5,300.00 5,300.00 5,000.00 5,000.00    
202-02-B-04 removal of concrete box culverts (sta. 95+375; 2-1.2 m
x 0.9 m x 19 m)
1      ea 1,000.00 1,000.00 8,700.00 8,700.00 5,000.00 5,000.00    
202-02-B-05 removal of concrete box culverts (sta. 95+706; 0.9 m x
0.9 m x 20 m)
1      ea 1,000.00 1,000.00 4,500.00 4,500.00 5,000.00 5,000.00    
202-02-B-06 removal of concrete box culverts (sta. 96+013; 0.9 m x
0.6 m x 20 m)
1      ea 1,000.00 1,000.00 4,500.00 4,500.00 5,000.00 5,000.00    
202-02-B-07 removal of concrete box culverts (sta. 96+280; 1.3 m x
0.9 m x 21 m)
1      ea 1,000.00 1,000.00 4,500.00 4,500.00 5,000.00 5,000.00    
202-02-C removal of portland cement concrete pavement 17,357      sq m 8.00 138,856.00 2.50 43,392.50 10.00 173,570.00    
202-02-D removal of concrete walks & drives 1,206      sq m 9.00 10,854.00 10.00 12,060.00 12.50 15,075.00    
202-02-G removal of surfacing & stabilized base 27,940.3    sq m 4.80 134,113.44 5.00 139,701.50 7.00 195,582.10    
202-02-H removal of guard rail 553      ln m 10.00 5,530.00 13.00 7,189.00 25.00 13,825.00    
202-02-I-01 removal of butane tank (on centerline at sta. 85+247) 1      ea 1.00 1.00 1,500.00 1,500.00 1,500.00 1,500.00    
202-02-I-02 removal of butane tank (lt. of sta. 92+469) 1      ea 1.00 1.00 1,500.00 1,500.00 1,500.00 1,500.00    
202-02-01 removal of 6.2 m x 5.0 m wood frame shed (lt. of sta.
85+037)
1      ea 1.00 1.00 305.00 305.00 500.00 500.00    
202-02-02 removal of 9.8 m x 9.1 m wood frame residence (lt. of
sta. 85+044) (contains non-friable asbestos)
1      ea 1.00 1.00 1,180.00 1,180.00 4,000.00 4,000.00    
202-02-03 removal of 14.9 m x 13.5 m wood frame residence (lt.
of sta. 85+064) (contains non-friable asbestos)
1      ea 1.00 1.00 5,250.00 5,250.00 4,000.00 4,000.00    
202-02-04 removal of 15.3 m x 9.6 m wood frame residence (lt. of
sta. 85+255) (contains non-friable asbestos)
1      ea 1.00 1.00 3,915.00 3,915.00 4,000.00 4,000.00    
202-02-05 removal of 12.3 m x 6.0 m wood frame camp (lt. of sta.
86+414) (contains non-friable asbestos)
1      ea 1.00 1.00 2,115.00 2,115.00 4,000.00 4,000.00    
202-02-06 removal of 5.2 m x 2.3 m wood shed (lt. of sta. 91+718) 1      ea 1.00 1.00 295.00 295.00 100.00 100.00    
202-02-07 removal of 3.2 m x 3.0 m metal "lean-to" shed (lt. of
sta. 91+729)
1      ea 1.00 1.00 95.00 95.00 10.00 10.00    
202-02-08 removal of 3.6 m x 2.5 m wood shed with carport (lt.
of sta. 91+745)
1      ea 1.00 1.00 90.00 90.00 10.00 10.00    
202-02-09 removal of 23.7 m x 4.6 m mobile home (lt. of sta.
91+748)
1      ea 1.00 1.00 1.00 1.00 250.00 250.00    
202-02-10 removal of 17.1 m x 3.7 m mobile home (lt. of sta.
91+824)
1      ea 1.00 1.00 1.00 1.00 250.00 250.00    
202-02-11 removal of 23.2 m x 4.7 m mobile home (lt. of sta.
91+869)
1      ea 1.00 1.00 1.00 1.00 250.00 250.00    
202-02-12 removal of 2.5 m x 2.0 m wood shed (lt. of sta. 91+866) 1      ea 1.00 1.00 50.00 50.00 10.00 10.00    
202-02-13 removal of 11.1 m x 9.8 m wood barn (lt. of sta.
92+451)
1      ea 1.00 1.00 110.00 110.00 100.00 100.00    
202-02-14 removal of 17.5 m x 15.5 m brick residence (lt. of
sta. 92+489)
1      ea 1.00 1.00 3,300.00 3,300.00 500.00 500.00    
202-02-15 removal of 24.1 m x 10.9 m brick residence (lt. of
sta. 93+061) (contains non-friable asbestos)
1      ea 1.00 1.00 3,300.00 3,300.00 4,000.00 4,000.00    
202-02-16 removal of 14.9 m x 9.8 m wood frame residence w/pool
(lt. of sta. 93+254)
1      ea 1.00 1.00 3,900.00 3,900.00 1,500.00 1,500.00    
202-02-17 removal of 17.6 m x 3.8 m mobile home (lt. of sta.
94+020)
1      ea 1.00 1.00 1.00 1.00 200.00 200.00    
202-02-18 removal of 6.7 m x 2.6 m metal "lean-to" shed
w/carport (lt. of sta. 94+037)
1      ea 1.00 1.00 175.00 175.00 100.00 100.00    
202-02-19 removal of 9.6 m x 9.3 m metal and wood shed (lt. of
sta. 94+059)
1      ea 1.00 1.00 880.00 880.00 100.00 100.00    
202-02-20 removal of 7.3 m x 1.8 m metal storage building (lt.
of sta. 94+074)
1      ea 1.00 1.00 130.00 130.00 100.00 100.00    
202-02-21 removal of 15.9 m x 13.5 m wood frame residence w/pool
(lt. of sta. 94+090)(contains non-friable
asbestos)
1      ea 1.00 1.00 5,600.00 5,600.00 5,000.00 5,000.00    
202-02-22 removal of 7.3 m x 3.6 m metal building (lt. of sta.
94+466)
1      ea 1.00 1.00 560.00 560.00 100.00 100.00    
202-02-23 removal of 10.5 m x 7.3 m metal building (lt. of sta.
95+511)
1      ea 1.00 1.00 1,055.00 1,055.00 100.00 100.00    
202-02-24 removal of 13.4 m x 7.5 m metal building (lt. of sta.
95+526)
1      ea 1.00 1.00 1,290.00 1,290.00 100.00 100.00    
202-02-25 removal of 18.4 m x 9.3 m wood frame business (lt. of
sta. 95+531)
1      ea 1.00 1.00 1,985.00 1,985.00 100.00 100.00    
202-02-26 removal of 19.6 m x 7.8 m brick residence (lt. of sta.
95+552)
1      ea 1.00 1.00 2,300.00 2,300.00 500.00 500.00    
202-02-27 removal of 19.4 m x 11.7 m brick residence (lt. of
sta. 95+595)
1      ea 1.00 1.00 3,000.00 3,000.00 500.00 500.00    
202-02-28 removal of 4.9 m x 2.5 m metal building (lt. of sta.
95+610)
1      ea 1.00 1.00 420.00 420.00 100.00 100.00    
202-02-29 removal of 9.8 m x 7.4 m wood shop (lt. of sta. 95+637) 1      ea 1.00 1.00 1,015.00 1,015.00 100.00 100.00    
202-02-30 removal of 21.7 m x 9.2 m brick residence (lt. of sta.
95+660) (contains non-friable asbestos)
1      ea 1.00 1.00 5,800.00 5,800.00 4,000.00 4,000.00    
202-02-31 removal of 14.6 m x 7.6 m brick residence (lt. of sta.
95+690)
1      ea 1.00 1.00 1,800.00 1,800.00 500.00 500.00    
202-02-32 removal of 11.2 m x 8.1 m brick residence (lt. of sta.
95+725)
1      ea 1.00 1.00 1,600.00 1,600.00 500.00 500.00    
202-02-33 removal of 12.4 m x 8.8 m brick residence (lt. of sta.
95+752)
1      ea 1.00 1.00 1,800.00 1,800.00 500.00 500.00    
202-02-34 removal of 5.6 m x 2.7 m metal shed (lt. of sta.
96+314)
1      ea 1.00 1.00 450.00 450.00 100.00 100.00    
202-02-35 removal of 42.2 m x 3.2 m metal storage building (lt.
of sta. 5+041)
1      ea 1.00 1.00 1,630.00 1,630.00 100.00 100.00    
202-02-36 removal of 30.6 m x 6.2 m metal storage building (lt.
of sta. 5+058)
1      ea 1.00 1.00 2,170.00 2,170.00 100.00 100.00    
203-01 general excavation 371,511      cu m 4.20 1,560,346.20 3.60 1,337,439.60 7.00 2,600,577.00    
203-02 drainage excavation 26,081      cu m 8.00 208,648.00 14.50 378,174.50 10.00 260,810.00    
203-03 muck excavation 5,685      cu m 12.00 68,220.00 15.00 85,275.00 20.00 113,700.00    
203-04 embankment 325,795      cu m 5.40 1,759,293.00 5.00 1,628,975.00 9.00 2,932,155.00    
203-05-A nonplastic embankment (stone) 259      cu m 260.00 67,340.00 165.00 42,735.00 200.00 51,800.00    
204-02 temporary hay or straw bales 637      ea 5.00 3,185.00 8.50 5,414.50 100.00 63,700.00    
204-05-A temporary sediment check dams (hay) 272      ea 90.00 24,480.00 120.00 32,640.00 200.00 54,400.00    
204-05-B temporary sediment check dams (stone) 145      ea 600.00 87,000.00 260.00 37,700.00 500.00 72,500.00    
204-06 temporary silt fencing 11,221      ln m 3.50 39,273.50 10.50 117,820.50 5.00 56,105.00    
204-07 temporary stone construction entrance 2      ea 1,600.00 3,200.00 2,000.00 4,000.00 2,500.00 5,000.00    
302-02-A-01 class ii base course (150 mm thick)(soil cement) 138,321.0    sq m 8.80 1,217,224.80 9.50 1,314,049.50 14.00 1,936,494.00    
302-02-F-01 class ii base course (200 mm thick)(stone or recycled
pccp)
51,330.6    sq m 23.50 1,206,269.10 22.50 1,154,938.50 33.00 1,693,909.80    
304-01 lime 582.12   Mg 140.00 81,496.80 142.00 82,661.04 165.00 96,049.80    
304-04-D lime treatment (type d) (300 mm thick) 38,500      sq m 2.40 92,400.00 2.00 77,000.00 2.25 86,625.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
442      cu m 100.00 44,200.00 55.00 24,310.00 100.00 44,200.00    
402-01 traffic maintenance aggregate (vehicular measurement) 3,000.0    cu m 90.00 270,000.00 60.00 180,000.00 125.00 375,000.00    
701-01-F cross drain pipe (375 mm rcp/pcp) 509.5    ln m 200.00 101,900.00 150.00 76,425.00 425.00 216,537.50    
701-01-G cross drain pipe (450 mm rcp/pcp) 125.5    ln m 240.00 30,120.00 160.00 20,080.00 525.00 65,887.50    
701-01-M cross drain pipe (900 mm rcp/pcp) 114.0    ln m 380.00 43,320.00 400.00 45,600.00 550.00 62,700.00    
701-02-A cross drain pipe arch (375 mm equiv. rcpa) 29.0    ln m 260.00 7,540.00 190.00 5,510.00 415.00 12,035.00    
701-02-D cross drain pipe arch (600 mm equiv. rcpa) 51.0    ln m 280.00 14,280.00 235.00 11,985.00 375.00 19,125.00    
701-02-E cross drain pipe arch (750 mm equiv. rcpa) 184.5    ln m 350.00 64,575.00 290.00 53,505.00 525.00 96,862.50    
701-02-F cross drain pipe arch (900 mm equiv. rcpa) 708.0    ln m 380.00 269,040.00 470.00 332,760.00 600.00 424,800.00    
701-02-G cross drain pipe arch (1050 mm equiv. rcpa) 183.0    ln m 490.00 89,670.00 485.00 88,755.00 700.00 128,100.00    
701-02-L cross drain pipe arch (1800 mm equiv. rcpa) 292.0    ln m 1,000.00 292,000.00 885.00 258,420.00 1,500.00 438,000.00    
701-03-F storm drain pipe (375 mm rcp/pcp) 892.0    ln m 330.00 294,360.00 150.00 133,800.00 275.00 245,300.00    
701-03-F-01 storm drain pipe (375 mm rcp/pcp)(outfall) 39.0    ln m 120.00 4,680.00 145.00 5,655.00 315.00 12,285.00    
701-03-G storm drain pipe (450 mm rcp/pcp) 76.0    ln m 450.00 34,200.00 160.00 12,160.00 350.00 26,600.00    
701-03-I storm drain pipe (600 mm rcp/pcp) 361.0    ln m 500.00 180,500.00 220.00 79,420.00 325.00 117,325.00    
701-03-M storm drain pipe (900 mm rcp/pcp) 24.0    ln m 680.00 16,320.00 395.00 9,480.00 450.00 10,800.00    
701-03-M-01 storm drain pipe (900 mm rcp/pcp)(outfall) 9.0    ln m 360.00 3,240.00 395.00 3,555.00 750.00 6,750.00    
701-03-N storm drain pipe (1050 mm rcp/pcp) 19.0    ln m 900.00 17,100.00 500.00 9,500.00 625.00 11,875.00    
701-03-O-01 storm drain pipe (1200 mm rcp/pcp)(outfall) 7.5    ln m 550.00 4,125.00 605.00 4,537.50 1,100.00 8,250.00    
701-05-G side drain pipe (450 mm) 204.5    ln m 150.00 30,675.00 200.00 40,900.00 400.00 81,800.00    
701-05-G-01 side drain pipe (450 mm)(erosion) 52.0    ln m 150.00 7,800.00 210.00 10,920.00 425.00 22,100.00    
701-05-I side drain pipe (600 mm) 157.5    ln m 160.00 25,200.00 220.00 34,650.00 425.00 66,937.50    
701-05-I-01 side drain pipe (600 mm)(erosion) 19.0    ln m 190.00 3,610.00 205.00 3,895.00 1,100.00 20,900.00    
701-05-K side drain pipe (750 mm) 26.5    ln m 210.00 5,565.00 340.00 9,010.00 550.00 14,575.00    
701-06-B side drain pipe arch (450 mm equiv.) 15.0    ln m 180.00 2,700.00 190.00 2,850.00 500.00 7,500.00    
701-06-H side drain pipe arch (1200 mm equiv.) 28.0    ln m 340.00 9,520.00 545.00 15,260.00 800.00 22,400.00    
701-09-A fabricating pipe fittings (375 mm x 375 mm x 375 mm) 3      ea 1,200.00 3,600.00 2,750.00 8,250.00 3,000.00 9,000.00    
701-09-B fabricating pipe fittings (450 mm x 450 mm x 375 mm) 1      ea 1,300.00 1,300.00 2,750.00 2,750.00 3,500.00 3,500.00    
701-09-C fabricating pipe fittings (600 mm x 600 mm x 375 mm) 2      ea 1,700.00 3,400.00 4,400.00 8,800.00 4,000.00 8,000.00    
701-10-I reinforced concrete pipe (extension)(600 mm) 7.0    ln m 500.00 3,500.00 245.00 1,715.00 525.00 3,675.00    
702-02-F manholes (mh-01) 6      ea 3,400.00 20,400.00 5,100.00 30,600.00 5,000.00 30,000.00    
702-02-G manholes (r-cb-36) 12      ea 4,000.00 48,000.00 4,500.00 54,000.00 5,500.00 66,000.00    
702-03-A catch basins (cb-01) 46      ea 2,400.00 110,400.00 3,800.00 174,800.00 5,000.00 230,000.00    
702-03-B catch basins (cb-02) 1      ea 4,000.00 4,000.00 5,350.00 5,350.00 5,500.00 5,500.00    
702-03-C catch basins (cb-06) 18      ea 3,200.00 57,600.00 3,600.00 64,800.00 5,000.00 90,000.00    
702-03-D catch basins (cb-07) 21      ea 3,400.00 71,400.00 3,650.00 76,650.00 8,500.00 178,500.00    
702-03-F catch basins (cb-08) 5      ea 6,000.00 30,000.00 5,800.00 29,000.00 9,500.00 47,500.00    
702-07-A cross drain safety end (type 1) 1      ea 1,500.00 1,500.00 1,725.00 1,725.00 2,500.00 2,500.00    
702-07-C cross drain safety end (type 3) 4      ea 5,000.00 20,000.00 3,200.00 12,800.00 6,500.00 26,000.00    
702-07-D cross drain safety end (type 4) 1      ea 5,000.00 5,000.00 2,800.00 2,800.00 7,500.00 7,500.00    
702-08-A side drain safety end (type 1) 9      ea 1,500.00 13,500.00 1,500.00 13,500.00 1,500.00 13,500.00    
703-03 perforated pipe underdrains 1,585      ln m 26.00 41,210.00 55.00 87,175.00 50.00 79,250.00    
703-04 nonperforated pipe underdrains 35      ln m 100.00 3,500.00 160.00 5,600.00 95.00 3,325.00    
704-03 blocked out guard rail 461.01   ln m 52.00 23,972.52 52.00 23,972.52 65.00 29,965.65    
704-08-B guard rail transitions (double thrie beam) 60.96   ln m 170.00 10,363.20 168.00 10,241.28 200.00 12,192.00    
704-11-A guard rail end treatment (flared) 8      ea 1,900.00 15,200.00 1,900.00 15,200.00 2,200.00 17,600.00    
705-01 barbed wire fence 1,086      ln m 18.00 19,548.00 17.20 18,679.20 12.00 13,032.00    
705-02 combination mesh & barbed wire fence 83      ln m 24.00 1,992.00 24.00 1,992.00 30.00 2,490.00    
705-04 single swinging driveway gates 2      ea 500.00 1,000.00 500.00 1,000.00 400.00 800.00    
705-06-A chain link fence (1200 mm height) 226      ln m 60.00 13,560.00 60.00 13,560.00 40.00 9,040.00    
705-06-B chain link fence (1500 mm height) 24      ln m 75.00 1,800.00 75.00 1,800.00 45.00 1,080.00    
705-06-C chain link fence (1800 mm height) 20      ln m 90.00 1,800.00 90.00 1,800.00 50.00 1,000.00    
705-07-A 4-meter single gates for chain link fence (1200mm
height)
1      ea 800.00 800.00 800.00 800.00 750.00 750.00    
705-07-B 4-meter single gates for chain link fence (1500mm
height)
1      ea 900.00 900.00 910.00 910.00 850.00 850.00    
706-02-C concrete drive (150 mm thick) 1,488.6    sq m 65.00 96,759.00 55.00 81,873.00 60.00 89,316.00    
706-03-A incidental concrete paving (100 mm thick) 161.7    sq m 80.00 12,936.00 53.00 8,570.10 60.00 9,702.00    
708-01 right-of-way monument 196      ea 120.00 23,520.00 140.00 27,440.00 130.00 25,480.00    
708-02 right-of-way monument witness post 196      ea 120.00 23,520.00 55.00 10,780.00 130.00 25,480.00    
711-01-C riprap (15 kg, 365 mm min. thickness) 6,500      sq m 57.00 370,500.00 1.00 6,500.00 65.00 422,500.00    
711-01-D riprap (25 kg, 460 mm min. thickness) 5,168      sq m 67.00 346,256.00 70.00 361,760.00 75.00 387,600.00    
711-04 geotextile fabric 11,668      sq m 2.00 23,336.00 2.65 30,920.20 2.50 29,170.00    
712-04 flexible revetment 5,200      sq m 60.00 312,000.00 63.00 327,600.00 75.00 390,000.00    
713-01 temporary signs & barricades lump      lump 200,000.00 200,000.00 170,000.00 170,000.00 1,900,000.00 1,900,000.00    
713-04-A-01 temporary pavement markings (broken line)(100 mm width)
(1.2 m length) (type 1 removable)
3.200  km 850.00 2,720.00 850.00 2,720.00 3,000.00 9,600.00    
713-05-A temporary pavement markings (solid line)(100 mm width) 3.000  km 750.00 2,250.00 750.00 2,250.00 1,000.00 3,000.00    
713-05-A-01 temporary pavement markings (solid line)(100 mm width)
(type 1 removable)
50.000  km 5,250.00 262,500.00 5,250.00 262,500.00 3,000.00 150,000.00    
713-06-A temporary pavement legends and symbols (arrow) 22      ea 100.00 2,200.00 100.00 2,200.00 200.00 4,400.00    
713-06-C temporary pavement legends and symbols (only) 2      ea 100.00 200.00 100.00 200.00 200.00 400.00    
713-07 temporary reflectorized raised pavement markers 1,300      ea 4.50 5,850.00 4.50 5,850.00 3.00 3,900.00    
714-01 slab sodding 12,600      sq m 4.50 56,700.00 4.80 60,480.00 5.00 63,000.00    
716-01-A mulch (vegetative) 75.0    hctr 1,300.00 97,500.00 1,860.00 139,500.00 1,600.00 120,000.00    
717-01 seeding 5,000      kg 12.50 62,500.00 15.40 77,000.00 16.00 80,000.00    
718-01 fertilizer 84,000      kg 0.45 37,800.00 0.62 52,080.00 1.00 84,000.00    
720-01-A erosion control system, slope protection (type a) 80,134      sq m 1.25 100,167.50 1.49 119,800.33 1.30 104,174.20    
720-01-C erosion control system, flexible channel liner (type c) 5,702      sq m 1.25 7,127.50 3.00 17,106.00 1.30 7,412.60    
720-01-D erosion control system, flexible channel liner (type d) 6,391      sq m 1.25 7,988.75 3.00 19,173.00 1.35 8,627.85    
722-02 project site laboratory (equipped) 1      ea 40,000.00 40,000.00 15,000.00 15,000.00 35,000.00 35,000.00    
724-01-C pavement patching (450 mm minimum thickness) 1,274      sq m 110.00 140,140.00 195.00 248,430.00 200.00 254,800.00    
725-01-A temporary detour roads (9.6 m width) 184.5    ln m 580.00 107,010.00 700.00 129,150.00 600.00 110,700.00    
725-01-B temporary detour roads (6.0 m width) 64.3    ln m 460.00 29,578.00 500.00 32,150.00 900.00 57,870.00    
726-01 bedding material 2,998.9    cu m 85.00 254,906.50 80.00 239,912.00 135.00 404,851.50    
727-01 mobilization lump      lump 2,800,000.00 2,800,000.00 2,700,000.00 2,700,000.00 3,500,000.00 3,500,000.00    
729-16-C object marker assembly (type 3) 8      ea 66.00 528.00 70.00 560.00 80.00 640.00    
731-02 reflectorized raised pavement markers 2,407      ea 5.50 13,238.50 5.50 13,238.50 6.50 15,645.50    
732-01-C plastic pavement striping (200 mm width) 338      ln m 15.00 5,070.00 15.00 5,070.00 5.00 1,690.00    
732-01-E plastic pavement striping (600 mm width) 909      ln m 17.00 15,453.00 17.00 15,453.00 15.00 13,635.00    
732-02-A plastic pavement striping (solid line)(100 mm width) 49.851  km 1,500.00 74,776.50 1,500.00 74,776.50 2,000.00 99,702.00    
732-04-A plastic pavement legends & symbols (arrow) 29      ea 250.00 7,250.00 250.00 7,250.00 350.00 10,150.00    
732-04-C plastic pavement legends & symbols (only) 9      ea 250.00 2,250.00 250.00 2,250.00 350.00 3,150.00    
732-05 removal of existing markings 8.600  km 2,000.00 17,200.00 2,000.00 17,200.00 2,500.00 21,500.00    
735-01 mailboxes 25      ea 1.00 25.00 1.00 25.00 25.00 625.00    
735-02 mailbox supports (single) 25      ea 160.00 4,000.00 160.00 4,000.00 150.00 3,750.00    
740-01 construction layout lump      lump 300,000.00 300,000.00 230,000.00 230,000.00 400,000.00 400,000.00    
741-09 adjusting water house connections 20      ea 800.00 16,000.00 800.00 16,000.00 550.00 11,000.00    
741-10 adjusting water service lines 400      ln m 35.00 14,000.00 35.00 14,000.00 90.00 36,000.00    
742-01-A sanitary sewer pipe (200 mm) 743      ln m 130.00 96,590.00 130.00 96,590.00 90.00 66,870.00    
742-02 adjusting sanitary sewer house connections 12      ea 750.00 9,000.00 750.00 9,000.00 600.00 7,200.00    
742-03 adjusting sanitary sewer service lines 150      ln m 130.00 19,500.00 130.00 19,500.00 200.00 30,000.00    
742-04-A casing (200 mm steel) 10      ln m 275.00 2,750.00 275.00 2,750.00 500.00 5,000.00    
742-04-A-01 casing (200 mm steel)(jack and bore) 20      ln m 275.00 5,500.00 275.00 5,500.00 850.00 17,000.00    
742-04-B casing (300 mm steel) 38      ln m 300.00 11,400.00 300.00 11,400.00 750.00 28,500.00    
742-04-B-01 casing (300 mm steel)(jack and bore) 40      ln m 300.00 12,000.00 300.00 12,000.00 1,000.00 40,000.00    
744-01 traffic control management lump      lump 60,000.00 60,000.00 10,000.00 10,000.00 125,000.00 125,000.00    
804-01-B precast concrete piles (350 mm) 500.0    ln m 160.00 80,000.00 160.00 80,000.00 200.00 100,000.00    
804-01-D precast concrete piles (450 mm) 1,305.0    ln m 210.00 274,050.00 200.00 261,000.00 225.00 293,625.00    
804-05 precast concrete test piles 1      ea 20,000.00 20,000.00 40,000.00 40,000.00 20,000.00 20,000.00    
804-09 loading test piles 1      ea 1,000.00 1,000.00 15,000.00 15,000.00 2,000.00 2,000.00    
804-10 reloading test piles 1      ea 100.00 100.00 1,000.00 1,000.00 2,000.00 2,000.00    
804-11 redriving test piles 1      ea 100.00 100.00 1,000.00 1,000.00 2,000.00 2,000.00    
804-12 loading permanent piles 3      ea 1,000.00 3,000.00 3,000.00 9,000.00 10,000.00 30,000.00    
804-17 dynamic monitoring 1      ea 1,000.00 1,000.00 1,500.00 1,500.00 10,000.00 10,000.00    
805-01-B class a concrete (box culvert headwalls) 90.09   cu m 1,100.00 99,099.00 1,625.00 146,396.25 1,050.00 94,594.50    
805-01-F class a concrete (bents) 149.64   cu m 1,000.00 149,640.00 1,200.00 179,568.00 1,050.00 157,122.00    
805-03 class aa concrete 549.76   cu m 570.00 313,363.20 650.00 357,344.00 750.00 412,320.00    
805-12-A-01 reinforced concrete box culverts (1200 mm x 900 mm)
(extension) (cast-in-place only)
74.40   ln m 1,000.00 74,400.00 1,300.00 96,720.00 1,100.00 81,840.00    
805-12-E-01 reinforced concrete box culverts (1200 mm x 1200 mm)
(extension) (cast-in-place only)
258.50   ln m 1,100.00 284,350.00 1,600.00 413,600.00 1,200.00 310,200.00    
805-12-I reinforced concrete box culverts (1500 mm x 1500 mm) 164.00   ln m 1,150.00 188,600.00 2,000.00 328,000.00 1,250.00 205,000.00    
805-12-I-01 reinforced concrete box culverts (1500 mm x 1500 mm)
(extension) (cast-in-place only)
461.50   ln m 1,150.00 530,725.00 2,200.00 1,015,300.00 1,250.00 576,875.00    
805-12-M-01 reinforced concrete box culverts (1800 mm x 1800 mm)
(extension) (cast-in-place only)
100.00   ln m 1,200.00 120,000.00 2,400.00 240,000.00 1,300.00 130,000.00    
805-12-Y-01 reinforced concrete box culverts (900 mm x 900 mm)
(extension) (cast-in-place only)
112.50   ln m 1,000.00 112,500.00 1,350.00 151,875.00 1,100.00 123,750.00    
806-01 deformed reinforcing steel 20,068      kg 1.70 34,115.60 2.25 45,153.00 2.00 40,136.00    
806-02 deformed reinforcing steel (epoxy coated) 56,964      kg 2.10 119,624.40 2.50 142,410.00 2.50 142,410.00    
810-01 concrete railing (barrier) 240.00   ln m 160.00 38,400.00 280.00 67,200.00 200.00 48,000.00    
813-01 concrete approach slabs 885.60   sq m 170.00 150,552.00 290.00 256,824.00 200.00 177,120.00    
S-001 rumble strips (ground-in) 38.0    km 300.00 11,400.00 300.00 11,400.00 750.00 28,500.00    
S-002 sanitary sewer force main (100 mm pvc) 73      ln m 130.00 9,490.00 130.00 9,490.00 85.00 6,205.00    
S-003 plugging existing water well (lt. of sta.92+456) 1      each 2,500.00 2,500.00 1,500.00 1,500.00 2,500.00 2,500.00    
S-101 retroreflective sheeting panels lump      lump 4,000.00 4,000.00 1,500.00 1,500.00 7,500.00 7,500.00    
S-102 dynamic analysis 1      each 1,000.00 1,000.00 1,000.00 1,000.00 6,000.00 6,000.00    
 SUBTOTAL GENERAL       18,954,459.01   19,317,235.52   27,205,191.50    
                       
ALTERNATE A pavement alternates                    
                       
ALTERNATE A1 portland cement concrete pavement                    
302-02-E-01 class ii base course (100 mm thick)(stone or recycled
pccp)
130,456.1    sq m 13.00 1,695,929.30 14.00 1,826,385.40 0.00 0.00    
502-01 superpave asphaltic concrete) 9,493.0    Mg 100.00 949,300.00 103.00 977,779.00 0.00 0.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
4,712.2    Mg 130.00 612,586.00 150.00 706,830.00 0.00 0.00    
601-01-G portland cement concrete pavement (200 mm thick) 104,433.8    sq m 45.00 4,699,521.00 43.00 4,490,653.40 0.00 0.00    
601-02-G portland cement concrete pavement (200 mm thick)
(crossovers & turnouts)
18,717.8    sq m 58.00 1,085,632.40 60.00 1,123,068.00 0.00 0.00    
601-04 portland cement concrete pavement coring 250      ea 100.00 25,000.00 90.00 22,500.00 0.00 0.00    
707-01 concrete curb 1,688.2    ln m 12.00 20,258.40 12.00 20,258.40 0.00 0.00    
732-03-A plastic pavement striping (broken line)(100 mm width) 7.396  km 850.00 6,286.60 850.00 6,286.60 0.00 0.00    
732-03-A-01 plastic pvmt striping(broken line)(100mmwidth)
preformed marking tape (type v)
13.283  km 2,700.00 35,864.10 2,650.00 35,199.95 0.00 0.00    
 SUBTOTAL ALT A1       9,130,377.80   9,208,960.75        
                       
ALTERNATE A2 superpave asphaltic concrete pavement                    
302-02-E-01 class ii base course (100 mm thick)(stone or recycled
pccp)
128,955.2    sq m 0.00 0.00 0.00 0.00 15.00 1,934,328.00    
502-01 superpave asphaltic concrete 46,054.3    Mg 0.00 0.00 0.00 0.00 105.00 4,835,701.50    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
11,304.6    Mg 0.00 0.00 0.00 0.00 125.00 1,413,075.00    
707-03 combination concrete curb & gutter 1,668.2    ln m 0.00 0.00 0.00 0.00 75.00 125,115.00    
732-03-A plastic pavement striping (broken line)(100 mm width) 20.679  km 0.00 0.00 0.00 0.00 900.00 18,611.10    
 SUBTOTAL ALT A2               8,326,830.60    
                       
 ITEM TOTAL (CONSTRUCTION BID)       28,084,836.81   28,526,196.27   35,532,022.10    
 Number of Days Bid at $1,000 per day.     725 725,000.00 725 725,000.00 725 725,000.00 0  
 TOTAL BID       28,809,836.81   29,251,196.27   36,257,022.10    