Lead Project: 014-02-0022
Parish: ALLEN, JEFF DAVIS
Routes: US 165
Description: FENTON - KINDER
Type Const: grading, drainage structures, lime trmt, subgrade layer, class ii bc, superpave
acp (alt. a-1), pccp (alt. a-2), concrete slab span bridges, and related work
Estimated Construction Cost: $19,279,440.18
Maximum Number of Days Allowed for Construction: 740
Calculated Daily User Cost: $1,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 12312 GILCHRIST CONSTRUCTION CO. LLC $21,524,199.20 720 $22,244,199.20
2 34567 JAMES CONSTRUCTION GROUP LLC $23,755,277.55 730 $24,485,277.55
3 39462 DENTON-JAMES LLC $23,987,963.06 740 $24,727,963.06
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
DENTON-JAMES LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 670,000.00 670,000.00 600,000.00 600,000.00 800,000.00 800,000.00    
202-01 removal of structures & obstructions lump      lump 75,000.00 75,000.00 20,000.00 20,000.00 52,000.00 52,000.00    
202-02-C removal of portland cement concrete pavement 322      sq m 12.00 3,864.00 18.00 5,796.00 16.00 5,152.00    
202-02-D removal of concrete walks & drives 1,663      sq m 3.50 5,820.50 12.00 19,956.00 9.00 14,967.00    
202-02-G removal of surfacing & stabilized base 10,521.2    sq m 5.00 52,606.00 13.00 136,775.60 7.00 73,648.40    
202-02-01 removal of 5.8 m x 3.7 m metal shed (lt. of sta.
14+990)
1      ea 300.00 300.00 200.00 200.00 1.00 1.00    
202-02-02 removal of 4.0 m x 3.6 m metal shed (lt. of sta.
15+020)
1      ea 200.00 200.00 140.00 140.00 1.00 1.00    
202-02-03 removal of 7.5 m x 13.1 m wood frame residence on
concrete piers (lt. of sta. 15+045)
1      ea 1,200.00 1,200.00 900.00 900.00 1.00 1.00    
202-02-04 removal of 16.6 m x 3.1 m mobile home (lt. of sta.
15+085)
1      ea 600.00 600.00 1.00 1.00 1.00 1.00    
202-02-05 removal of 6.2 m x 3.9 m metal shed on concrete slab
(lt. of sta. 15+085)
1      ea 300.00 300.00 220.00 220.00 1.00 1.00    
202-02-06 removal of 9.8 m x 9.5 m wood frame/metal garage, dirt
floor (lt. of sta. 15+125)
1      ea 1,000.00 1,000.00 900.00 900.00 1.00 1.00    
202-02-07 removal of 20.2 m x 4.2 m mobile home (lt. of sta.
15+150)
1      ea 1,000.00 1,000.00 1.00 1.00 1.00 1.00    
202-02-08 removal of 10.5 m x 13.6 m wood frame residence on
concrete piers (lt. of sta. 15+300)(contains
friable asbestos)
1      ea 4,000.00 4,000.00 3,500.00 3,500.00 1.00 1.00    
202-02-09 removal of 6.2 m x 7.2 m wood frame garage on concrete
slab (lt. of sta. 15+300)
1      ea 500.00 500.00 450.00 450.00 1.00 1.00    
202-02-10 removal of 15.4 m x 7.1 m mobile home (lt. of sta.
15+335)
1      ea 1,200.00 1,200.00 1.00 1.00 1.00 1.00    
202-02-11 removal of 16.4 m x 20.1 m metal barn (lt. of sta.
15+450)
1      ea 3,800.00 3,800.00 3,200.00 3,200.00 1.00 1.00    
202-02-12 removal of 18.3 m x 9.8 m wood frame residence on
concrete piers (lt. of sta. 15+500)
1      ea 5,000.00 5,000.00 4,500.00 4,500.00 1.00 1.00    
202-02-13 removal of 3.7 m x 2.5 m wood frame shed on concrete
slab (lt. of sta. 16+530)
1      ea 100.00 100.00 90.00 90.00 1.00 1.00    
202-02-14 removal of 25.3 m x 10.0 m brick residence on concrete
slab (lt. of sta. 16+540)
1      ea 7,800.00 7,800.00 6,500.00 6,500.00 1.00 1.00    
202-02-15 removal of 7.5 m x 11.1 m wood frame residence on
concrete piers (lt. of sta. 16+850)
1      ea 2,400.00 2,400.00 2,000.00 2,000.00 1.00 1.00    
202-02-16 removal of 3.7 m x 3.9 m metal shed on concrete slab
(lt. of sta. 16+850)
1      ea 170.00 170.00 140.00 140.00 1.00 1.00    
202-02-17 removal of 6.2 m x 6.9 m metal garage on concrete slab
(lt. of sta. 16+860)
1      ea 500.00 500.00 425.00 425.00 1.00 1.00    
202-02-18 removal of 7.4 m x 11.0 m metal shed on concrete slab
(lt. of sta. 16+905)
1      ea 1,000.00 1,000.00 800.00 800.00 1.00 1.00    
202-02-19 removal of 3.1 m x 3.0 m metal shed on concrete slab
(lt. of sta. 16+920)
1      ea 100.00 100.00 90.00 90.00 1.00 1.00    
202-02-20 removal of 15.8 m x 9.9 m brick residence on concrete
piers (lt. of sta. 16+930)
1      ea 5,200.00 5,200.00 4,400.00 4,400.00 1.00 1.00    
202-02-21 removal of 20.1 m x 4.2 m mobile home (lt. of sta.
18+860)
1      ea 1,000.00 1,000.00 1.00 1.00 1.00 1.00    
202-02-22 removal of 20.1 m x 4.3 m mobile home (lt. of sta.
18+860)
1      ea 1,000.00 1,000.00 1.00 1.00 1.00 1.00    
202-02-23 removal of 3.2 m x 3.1 m metal shed (lt. of sta.
19+425)
1      ea 100.00 100.00 100.00 100.00 1.00 1.00    
202-02-24 removal of 20.1 m x 4.2 m mobile home (lt. of sta.
19+575)
1      ea 2,400.00 2,400.00 1.00 1.00 1.00 1.00    
202-02-25 removal of 2.8 m x 5.3 m metal shed (lt. of sta.
19+575)
1      ea 200.00 200.00 150.00 150.00 1.00 1.00    
202-02-26 removal of 9.2 m x 12.2 m metal shed (lt. of sta.
19+860)
1      ea 1,300.00 1,300.00 1,125.00 1,125.00 1.00 1.00    
202-02-27 removal of 20.2 m x 12.3 m brick residence on concrete
slab (lt. of sta. 19+880)
1      ea 3,500.00 3,500.00 3,000.00 3,000.00 1.00 1.00    
202-02-28 removal of 3.0 m x 2.4 m wood frame shed (lt of sta.
19+950)
1      ea 100.00 100.00 70.00 70.00 1.00 1.00    
202-02-29 removal of 24.1 m x 9.9 m brick residence on concrete
piers (lt. of sta. 19+965)
1      ea 7,200.00 7,200.00 6,000.00 6,000.00 1.00 1.00    
202-02-30 removal of 21.2 m x 8.1 m wood frame residence on
concrete piers (lt. of sta. 20+710)
1      ea 5,000.00 5,000.00 4,200.00 4,200.00 1.00 1.00    
202-02-31 removal of 4.6 m x 6.7 m metal shed (lt. of sta.
21+090)
1      ea 350.00 350.00 300.00 300.00 1.00 1.00    
202-02-32 removal of 18.4 m x 26.7 m 2-story metal building on
concrete slab (lt. of sta. 22+200)
1      ea 14,000.00 14,000.00 10,000.00 10,000.00 1.00 1.00    
202-02-33 removal of 14.8 m x 8.6 m wood frame residence on
concrete slab (lt. of sta. 22+420)
1      ea 3,600.00 3,600.00 3,000.00 3,000.00 1.00 1.00    
202-02-34 removal of 4.4 m x 1.8 m metal shed (lt. of sta.
22+510)
1      ea 100.00 100.00 80.00 80.00 1.00 1.00    
202-02-35 removal of 7.4 m x 2.8 m metal shed on concrete piers
(lt. of sta. 22+525)
1      ea 300.00 300.00 200.00 200.00 1.00 1.00    
202-02-36 removal of 13.5 m x 7.4 m wood frame residence on
concrete piers (lt. of sta. 22+525)
1      ea 2,900.00 2,900.00 2,400.00 2,400.00 1.00 1.00    
202-02-37 removal of 12.8 m x 9.2 m wood frame residence on
brick piers (lt. of sta. 22+585)
1      ea 1,400.00 1,400.00 1,200.00 1,200.00 1.00 1.00    
202-02-38 removal of 23.2 m x 4.7 m mobile home (lt. of sta.
22+740)
1      ea 1,300.00 1,300.00 1.00 1.00 1.00 1.00    
202-02-39 removal of 18.4 m x 30.6 m metal building on concrete
slab (lt. of sta. 23+175)
1      ea 6,500.00 6,500.00 5,500.00 5,500.00 1.00 1.00    
202-02-40 removal of billboard (lt. of sta. 18+900) 1      ea 1.00 1.00 100.00 100.00 1.00 1.00    
202-02-41 removal of billboard (lt. of sta. 22+380) 1      ea 1.00 1.00 100.00 100.00 1.00 1.00    
202-02-42 removal of billboard (lt. of sta. 23+060) 1      ea 1.00 1.00 100.00 100.00 1.00 1.00    
202-02-43 removal of billboard (lt. of sta. 23+170) 1      ea 1.00 1.00 100.00 100.00 1.00 1.00    
202-02-44 removal of billboard (lt. of sta. 23+215) 1      ea 1.00 1.00 100.00 100.00 1.00 1.00    
202-02-45 removal of billboard (lt. of sta. 23+375) 1      ea 1.00 1.00 100.00 100.00 1.00 1.00    
202-02-46 removal of septic system 25      ea 2,000.00 50,000.00 500.00 12,500.00 1,000.00 25,000.00    
202-02-47 removal of aboveground storage tank (lt. of sta.
16+550)
1      ea 1.00 1.00 2,000.00 2,000.00 3,000.00 3,000.00    
203-01 general excavation 77,303      cu m 5.50 425,166.50 6.00 463,818.00 5.00 386,515.00    
203-02 drainage excavation 20,713      cu m 8.00 165,704.00 12.00 248,556.00 9.00 186,417.00    
203-03 muck excavation 1,420      cu m 13.00 18,460.00 12.00 17,040.00 20.00 28,400.00    
203-04 embankment 184,126      cu m 10.00 1,841,260.00 14.00 2,577,764.00 12.50 2,301,575.00    
203-05-A nonplastic embankment (stone) 4,087      cu m 110.00 449,570.00 140.00 572,180.00 130.00 531,310.00    
204-02 temporary hay or straw bales 119      ea 15.00 1,785.00 6.00 714.00 6.00 714.00    
204-04 temporary sediment basins 6      ea 320.00 1,920.00 350.00 2,100.00 600.00 3,600.00    
204-05-A temporary sediment check dams (hay) 38      ea 140.00 5,320.00 150.00 5,700.00 150.00 5,700.00    
204-05-B temporary sediment check dams (stone) 32      ea 530.00 16,960.00 400.00 12,800.00 600.00 19,200.00    
204-06 temporary silt fencing 13,126      ln m 6.60 86,631.60 5.00 65,630.00 4.00 52,504.00    
204-07 temporary stone construction entrance 2      ea 2,500.00 5,000.00 2,000.00 4,000.00 1,600.00 3,200.00    
302-02-E-01 class ii base course (125 mm thick)(stone or recycled
pccp)
13,722.4    sq m 15.00 205,836.00 18.00 247,003.20 20.00 274,448.00    
302-02-H-01 class ii base course (350 mm thick)(stone or recycled
pccp)
38,949.6    sq m 38.00 1,480,084.80 36.00 1,402,185.60 38.00 1,480,084.80    
304-05 lime treatment (type e)(300 mm thick) 1,972.00   Mg 115.00 226,780.00 175.00 345,100.00 280.00 552,160.00    
305-01-A subgrade layer (300 mm thick) 161,130      sq m 7.50 1,208,475.00 8.00 1,289,040.00 9.00 1,450,170.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
465      cu m 100.00 46,500.00 100.00 46,500.00 100.00 46,500.00    
402-01 traffic maintenance aggregate (vehicular measurement) 1,000.0    cu m 90.00 90,000.00 100.00 100,000.00 95.00 95,000.00    
701-01-G cross drain pipe (450 mm rcp/pcp) 513.2    ln m 230.00 118,036.00 170.00 87,244.00 200.00 102,640.00    
701-01-K cross drain pipe (750 mm rcp/pcp) 59.8    ln m 300.00 17,940.00 300.00 17,940.00 250.00 14,950.00    
701-01-M cross drain pipe (900 mm rcp/pcp) 29.4    ln m 470.00 13,818.00 380.00 11,172.00 450.00 13,230.00    
701-02-H cross drain pipe arch (1200 mm equiv. rcpa) 79.9    ln m 700.00 55,930.00 650.00 51,935.00 600.00 47,940.00    
701-02-I cross drain pipe arch (1350 mm equiv. rcpa) 111.0    ln m 750.00 83,250.00 730.00 81,030.00 700.00 77,700.00    
701-05-G side drain pipe (450 mm) 928.0    ln m 195.00 180,960.00 180.00 167,040.00 150.00 139,200.00    
701-05-G-01 side drain pipe (450 mm)(erosion) 205.8    ln m 150.00 30,870.00 190.00 39,102.00 160.00 32,928.00    
701-05-I side drain pipe (600 mm) 424.7    ln m 230.00 97,681.00 200.00 84,940.00 200.00 84,940.00    
701-05-I-01 side drain pipe (600 mm)(erosion) 47.6    ln m 200.00 9,520.00 210.00 9,996.00 220.00 10,472.00    
701-05-K side drain pipe (750 mm) 232.5    ln m 345.00 80,212.50 280.00 65,100.00 250.00 58,125.00    
701-05-K-01 side drain pipe (750 mm)(erosion) 16.0    ln m 240.00 3,840.00 290.00 4,640.00 270.00 4,320.00    
701-05-M side drain pipe (900 mm) 122.7    ln m 350.00 42,945.00 330.00 40,491.00 270.00 33,129.00    
701-05-N-01 side drain pipe (1050 mm )(erosion) 31.6    ln m 430.00 13,588.00 340.00 10,744.00 300.00 9,480.00    
701-06-D side drain pipe arch (600 mm equiv.) 29.2    ln m 400.00 11,680.00 240.00 7,008.00 230.00 6,716.00    
701-10-I reinforced concrete pipe (extension)(600 mm) 41.0    ln m 350.00 14,350.00 300.00 12,300.00 250.00 10,250.00    
702-02-F manholes (mh-01) 1      ea 2,200.00 2,200.00 4,000.00 4,000.00 4,000.00 4,000.00    
702-03-A catch basins (cb-01) 17      ea 2,200.00 37,400.00 2,500.00 42,500.00 2,500.00 42,500.00    
702-08-A side drain safety end (type 1) 5      ea 1,400.00 7,000.00 2,500.00 12,500.00 1,600.00 8,000.00    
702-08-B side drain safety end (type 2) 1      ea 2,000.00 2,000.00 4,000.00 4,000.00 2,600.00 2,600.00    
704-01-A guard rail (single thrie beam)(950 mm post spacing) 243.84   ln m 135.00 32,918.40 125.00 30,480.00 130.00 31,699.20    
704-03 blocked out guard rail 788.72   ln m 55.00 43,379.60 50.00 39,436.00 50.00 39,436.00    
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
26.67   ln m 280.00 7,467.60 250.00 6,667.50 260.00 6,934.20    
704-08-B guard rail transitions (double thrie beam) 83.82   ln m 145.00 12,153.90 135.00 11,315.70 140.00 11,734.80    
704-11-A guard rail end treatment (flared) 25      ea 2,000.00 50,000.00 1,800.00 45,000.00 1,800.00 45,000.00    
705-01 barbed wire fence 2,769      ln m 17.50 48,457.50 16.00 44,304.00 16.00 44,304.00    
705-02 combination mesh & barbed wire fence 66      ln m 26.50 1,749.00 20.00 1,320.00 20.00 1,320.00    
705-05 double swinging driveway gates 8      dbgt 745.00 5,960.00 600.00 4,800.00 600.00 4,800.00    
705-06-A chain link fence (1200 mm height) 514      ln m 55.00 28,270.00 50.00 25,700.00 35.00 17,990.00    
705-09 rebuilt fence 555      ln m 60.00 33,300.00 35.00 19,425.00 45.00 24,975.00    
706-02-C concrete drive (150 mm thick) 958.0    sq m 60.00 57,480.00 50.00 47,900.00 58.00 55,564.00    
708-01 right-of-way monument 60      ea 330.00 19,800.00 150.00 9,000.00 120.00 7,200.00    
708-02 right-of-way monument witness post 60      ea 330.00 19,800.00 150.00 9,000.00 120.00 7,200.00    
711-04 geotextile fabric 2,037      sq m 2.80 5,703.60 3.00 6,111.00 2.00 4,074.00    
712-04 flexible revetment 2,037      sq m 52.00 105,924.00 45.00 91,665.00 60.00 122,220.00    
713-01 temporary signs & barricades lump      lump 125,000.00 125,000.00 135,000.00 135,000.00 150,000.00 150,000.00    
713-05-A-01 temporary pavement markings (solid line)(100 mm width)
(type 1 removable)
0.495  km 10,100.00 4,999.50 9,500.00 4,702.50 9,600.00 4,752.00    
716-01-A mulch (vegetative) 9.3    hctr 1,850.00 17,205.00 1,600.00 14,880.00 4,000.00 37,200.00    
717-01 seeding 2,482      kg 16.00 39,712.00 12.00 29,784.00 12.00 29,784.00    
718-01 fertilizer 62,098      kg 0.80 49,678.40 0.50 31,049.00 0.45 27,944.10    
722-02 project site laboratory (equipped) 1      ea 40,000.00 40,000.00 20,000.00 20,000.00 40,000.00 40,000.00    
726-01 bedding material 428.2    cu m 115.00 49,243.00 80.00 34,256.00 100.00 42,820.00    
727-01 mobilization lump      lump 2,000,000.00 2,000,000.00 2,200,000.00 2,200,000.00 2,400,000.00 2,400,000.00    
729-16-B object marker assembly (type 2) 50      ea 50.00 2,500.00 45.00 2,250.00 45.00 2,250.00    
729-16-C object marker assembly (type 3) 25      ea 76.00 1,900.00 70.00 1,750.00 66.00 1,650.00    
731-02 reflectorized raised pavement markers 2,143      ea 5.50 11,786.50 5.00 10,715.00 5.00 10,715.00    
732-02-A plastic pavement striping (solid line)(100 mm width) 50.892  km 1,500.00 76,338.00 1,400.00 71,248.80 1,330.00 67,686.36    
732-02-C plastic pavement striping (solid line)(200 mm width) 0.225  km 3,600.00 810.00 3,200.00 720.00 3,300.00 742.50    
732-04-A plastic pavement legends & symbols (arrow) 9      ea 170.00 1,530.00 150.00 1,350.00 150.00 1,350.00    
732-04-C plastic pavement legends & symbols (only) 9      ea 170.00 1,530.00 180.00 1,620.00 150.00 1,350.00    
732-05 removal of existing markings 12.265  km 2,800.00 34,342.00 2,500.00 30,662.50 2,500.00 30,662.50    
735-01 mailboxes 32      ea 5.50 176.00 10.00 320.00 1.00 32.00    
735-02 mailbox supports (single) 32      ea 172.00 5,504.00 130.00 4,160.00 160.00 5,120.00    
740-01 construction layout lump      lump 275,000.00 275,000.00 180,000.00 180,000.00 300,000.00 300,000.00    
744-01 traffic control management lump      lump 75,000.00 75,000.00 10,000.00 10,000.00 60,000.00 60,000.00    
804-01-B precast concrete piles (350 mm) 979.0    ln m 159.00 155,661.00 180.00 176,220.00 150.00 146,850.00    
804-01-C precast concrete piles (400 mm) 1,505.5    ln m 188.00 283,034.00 200.00 301,100.00 170.00 255,935.00    
804-01-F precast concrete piles (600 mm) 688.8    ln m 292.00 201,129.60 300.00 206,640.00 320.00 220,416.00    
804-12 loading permanent piles 5      ea 100.00 500.00 2,500.00 12,500.00 1,000.00 5,000.00    
805-01-F class a concrete (bents) 245.76   cu m 800.00 196,608.00 1,000.00 245,760.00 1,000.00 245,760.00    
805-03 class aa concrete 805.28   cu m 600.00 483,168.00 700.00 563,696.00 640.00 515,379.20    
805-08-H precast-prestressed concrete girders (450 mm quad beam) 568.80   ln m 200.00 113,760.00 275.00 156,420.00 210.00 119,448.00    
806-01 deformed reinforcing steel 114,799      kg 1.60 183,678.40 1.75 200,898.25 1.70 195,158.30    
807-06 structural metalwork lump      lump 19,000.00 19,000.00 10,000.00 10,000.00 16,000.00 16,000.00    
810-01 concrete railing (barrier) 426.00   ln m 235.00 100,110.00 135.00 57,510.00 170.00 72,420.00    
813-01 concrete approach slabs 1,468.80   sq m 180.00 264,384.00 170.00 249,696.00 170.00 249,696.00    
S-001 dynamic message sign unit 2      each 20,000.00 40,000.00 40,000.00 80,000.00 20,000.00 40,000.00    
S-002 pier protection system 1      each 60,000.00 60,000.00 35,000.00 35,000.00 30,000.00 30,000.00    
S-003 rumble strips (ground-in) 22.1    km 550.00 12,155.00 550.00 12,155.00 400.00 8,840.00    
S-004 plugging existing water wells 7      each 2,200.00 15,400.00 1,500.00 10,500.00 2,500.00 17,500.00    
S-101 settlement plate installation and monitoring 10      each 2,500.00 25,000.00 1,800.00 18,000.00 2,500.00 25,000.00    
S-102 retroreflective sheeting panels 12      each 380.00 4,560.00 500.00 6,000.00 400.00 4,800.00    
S-103 surcharge for bridge headers lump      lump 165,000.00 165,000.00 190,000.00 190,000.00 200,000.00 200,000.00    
 SUBTOTAL GENERAL       13,652,356.90   14,725,914.65   15,101,142.36    
                       
ALTERNATE A                      
                       
ALTERNATE A1 superpave asphaltic concrete pavement                    
302-02-G-01 class ii base course (225 mm thick)(stone or recycled
pccp)
122,007.0    sq m 26.50 3,233,185.50 0.00 0.00 0.00 0.00    
502-01 superpave asphaltic concrete 43,988.0    Mg 77.00 3,387,076.00 0.00 0.00 0.00 0.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
11,069.7    Mg 112.00 1,239,806.40 0.00 0.00 0.00 0.00    
732-03-A plastic pavement striping (broken line)(100 mm width) 24.530  km 480.00 11,774.40 0.00 0.00 0.00 0.00    
 SUBTOTAL ALT A1       7,871,842.30            
                       
ALTERNATE A2 portland cement concrete pavement                    
302-02-F-01 class ii base course (200 mm thick)(stone or recycled
pccp)
122,007.0    sq m 0.00 0.00 22.00 2,684,154.00 22.00 2,684,154.00    
502-01 superpave asphaltic concrete 3,412.0    Mg 0.00 0.00 96.00 327,552.00 96.00 327,552.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,106.9    Mg 0.00 0.00 106.00 117,331.40 110.00 121,759.00    
601-01-G portland cement concrete pavement (200 mm thick) 97,780.1    sq m 0.00 0.00 45.00 4,400,104.50 44.00 4,302,324.40    
601-02-G portland cement concrete pavement (200 mm thick)
(crossovers & turnouts)
24,226.9    sq m 0.00 0.00 60.00 1,453,614.00 58.00 1,405,160.20    
732-03-A plastic pavement striping (broken line)(100 mm width) 12.265  km 0.00 0.00 500.00 6,132.50 440.00 5,396.60    
732-03-A-01 plastic pvmt striping(broken line)(100mmwidth)
preformed marking tape (type v)
12.265  km 0.00 0.00 3,300.00 40,474.50 3,300.00 40,474.50    
 SUBTOTAL ALT A2           9,029,362.90   8,886,820.70    
                       
 ITEM TOTAL (CONSTRUCTION BID)       21,524,199.20   23,755,277.55   23,987,963.06    
 Number of Days Bid at $1,000 per day.     720 720,000.00 730 730,000.00 740 740,000.00 0  
 TOTAL BID       22,244,199.20   24,485,277.55   24,727,963.06    