| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - HILL BROS. CONST & ENGINEERING INC. |
- 3 - KIEWIT SOUTHERN CO. |
- 4 - MASSMAN CONSTRUCTION CO. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 302-02-D |
class ii base course (12" thick)
|
99.3 |
SQYD |
72.00 |
7,149.60 |
150.00 |
14,895.00 |
200.00 |
19,860.00 |
40.00 |
3,972.00 |
| 502-01 |
superpave asphaltic concrete
|
45.7 |
TON |
350.00 |
15,995.00 |
400.00 |
18,280.00 |
200.00 |
9,140.00 |
150.00 |
6,855.00 |
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
37.5 |
LNFT |
63.00 |
2,362.50 |
56.00 |
2,100.00 |
50.00 |
1,875.00 |
50.00 |
1,875.00 |
| 704-03 |
blocked out guard rail
|
29.0 |
LNFT |
23.00 |
667.00 |
20.00 |
580.00 |
18.00 |
522.00 |
18.00 |
522.00 |
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
6.3 |
LNFT |
85.00 |
535.50 |
80.00 |
504.00 |
70.00 |
441.00 |
70.00 |
441.00 |
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
2,700.00 |
2,700.00 |
2,600.00 |
2,600.00 |
2,300.00 |
2,300.00 |
2,300.00 |
2,300.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
16,000.00 |
16,000.00 |
| 713-02 |
temporary pavement markings
|
lump |
LUMP |
3,200.00 |
3,200.00 |
2,800.00 |
2,800.00 |
2,500.00 |
2,500.00 |
6,000.00 |
6,000.00 |
| 713-08 |
temporary precast concrete barrier (contractor
furnished) |
13   |
EACH |
825.00 |
10,725.00 |
1,600.00 |
20,800.00 |
1,500.00 |
19,500.00 |
2,000.00 |
26,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
1,000,000.00 |
1,000,000.00 |
800,000.00 |
800,000.00 |
1,700,000.00 |
1,700,000.00 |
1,700,000.00 |
1,700,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
11   |
EACH |
8.00 |
88.00 |
8.00 |
88.00 |
7.00 |
77.00 |
7.00 |
77.00 |
| 732-01-A |
plastic pavement striping (4" width)
|
414   |
LNFT |
0.63 |
260.82 |
0.70 |
289.80 |
0.50 |
207.00 |
0.50 |
207.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
33   |
LNFT |
1.25 |
41.25 |
2.50 |
82.50 |
1.00 |
33.00 |
1.00 |
33.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
101,000.00 |
101,000.00 |
200,000.00 |
200,000.00 |
300,000.00 |
300,000.00 |
50,000.00 |
50,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
20,000.00 |
20,000.00 |
100,000.00 |
100,000.00 |
40,000.00 |
40,000.00 |
100,000.00 |
100,000.00 |
| 802-01 |
structural excavation
|
2,785.1 |
CUYD |
50.00 |
139,255.00 |
500.00 |
1,392,550.00 |
400.00 |
1,114,040.00 |
700.00 |
1,949,570.00 |
| 804-03-H |
steel piles (hp 14x102)
|
28,756   |
LNFT |
56.00 |
1,610,336.00 |
85.00 |
2,444,260.00 |
65.00 |
1,869,140.00 |
90.00 |
2,588,040.00 |
| 804-07 |
steel test piles
|
4   |
EACH |
11,500.00 |
46,000.00 |
10,500.00 |
42,000.00 |
100,000.00 |
400,000.00 |
33,000.00 |
132,000.00 |
| 804-09 |
loading test piles
|
4   |
EACH |
32,000.00 |
128,000.00 |
6,000.00 |
24,000.00 |
40,000.00 |
160,000.00 |
75,000.00 |
300,000.00 |
| 804-10 |
reloading test piles
|
1   |
EACH |
500.00 |
500.00 |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
| 804-11 |
redriving test piles
|
1   |
EACH |
750.00 |
750.00 |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
8,000.00 |
8,000.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
25,000.00 |
25,000.00 |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
| 804-17 |
dynamic monitoring
|
4   |
EACH |
2,600.00 |
10,400.00 |
4,000.00 |
16,000.00 |
2,000.00 |
8,000.00 |
2,000.00 |
8,000.00 |
| 805-02-D |
class a(m) concrete (footings)
|
1,254.44 |
CUYD |
310.00 |
388,876.40 |
450.00 |
564,498.00 |
1,200.00 |
1,505,328.00 |
500.00 |
627,220.00 |
| 805-02-F |
class a(m) concrete (bents)
|
2,156.00 |
CUYD |
515.00 |
1,110,340.00 |
750.00 |
1,617,000.00 |
1,700.00 |
3,665,200.00 |
1,100.00 |
2,371,600.00 |
| 806-01 |
deformed reinforcing steel
|
756,993   |
LB |
1.15 |
870,541.95 |
1.25 |
946,241.25 |
1.50 |
1,135,489.50 |
1.10 |
832,692.30 |
| 807-06 |
structural metalwork
|
lump |
LUMP |
5,700,000.00 |
5,700,000.00 |
6,200,000.00 |
6,200,000.00 |
3,930,945.00 |
3,930,945.00 |
5,152,000.00 |
5,152,000.00 |
| S-001 |
removal of eastbank railroad structure
|
lump |
LUMP |
206,000.00 |
206,000.00 |
230,000.00 |
230,000.00 |
500,000.00 |
500,000.00 |
600,000.00 |
600,000.00 |
| S-002 |
removal of westbank railroad structure
|
lump |
LUMP |
55,000.00 |
55,000.00 |
600,000.00 |
600,000.00 |
200,000.00 |
200,000.00 |
300,000.00 |
300,000.00 |
| S-003 |
removal of gas station
|
lump |
LUMP |
53,000.00 |
53,000.00 |
70,000.00 |
70,000.00 |
300,000.00 |
300,000.00 |
50,000.00 |
50,000.00 |
| S-004 |
removal of eastbank power poles and power lines
|
lump |
LUMP |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
| S-101 |
railroad deck
|
lump |
LUMP |
420,000.00 |
420,000.00 |
600,000.00 |
600,000.00 |
300,000.00 |
300,000.00 |
324,000.00 |
324,000.00 |
| S-102 |
construction site survey
|
lump |
LUMP |
51,000.00 |
51,000.00 |
125,000.00 |
125,000.00 |
20,000.00 |
20,000.00 |
150,000.00 |
150,000.00 |
| S-103 |
vibration monitoring
|
lump |
LUMP |
46,000.00 |
46,000.00 |
250,000.00 |
250,000.00 |
150,000.00 |
150,000.00 |
75,000.00 |
75,000.00 |
| S-104 |
dynamic analysis
|
4   |
each |
14,400.00 |
57,600.00 |
2,000.00 |
8,000.00 |
2,000.00 |
8,000.00 |
1,000.00 |
4,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
12,123,324.02 |
|
16,337,568.55 |
|
17,417,597.50 |
|
17,456,404.30 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - ROSIEK CONSTRUCTION CO INC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 302-02-D |
class ii base course (12" thick)
|
99.3 |
SQYD |
35.00 |
3,475.50 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
45.7 |
TON |
800.00 |
36,560.00 |
|
|
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
37.5 |
LNFT |
50.00 |
1,875.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
29.0 |
LNFT |
20.00 |
580.00 |
|
|
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
6.3 |
LNFT |
100.00 |
630.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 713-02 |
temporary pavement markings
|
lump |
LUMP |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 713-08 |
temporary precast concrete barrier (contractor
furnished) |
13   |
EACH |
1,100.00 |
14,300.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
2,050,000.00 |
2,050,000.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
11   |
EACH |
7.00 |
77.00 |
|
|
|
|
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
414   |
LNFT |
1.00 |
414.00 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
33   |
LNFT |
1.10 |
36.30 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
300,000.00 |
300,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
200,000.00 |
200,000.00 |
|
|
|
|
|
|
| 802-01 |
structural excavation
|
2,785.1 |
CUYD |
100.00 |
278,510.00 |
|
|
|
|
|
|
| 804-03-H |
steel piles (hp 14x102)
|
28,756   |
LNFT |
100.00 |
2,875,600.00 |
|
|
|
|
|
|
| 804-07 |
steel test piles
|
4   |
EACH |
15,000.00 |
60,000.00 |
|
|
|
|
|
|
| 804-09 |
loading test piles
|
4   |
EACH |
50,000.00 |
200,000.00 |
|
|
|
|
|
|
| 804-10 |
reloading test piles
|
1   |
EACH |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| 804-11 |
redriving test piles
|
1   |
EACH |
6,000.00 |
6,000.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
60,000.00 |
60,000.00 |
|
|
|
|
|
|
| 804-17 |
dynamic monitoring
|
4   |
EACH |
8,000.00 |
32,000.00 |
|
|
|
|
|
|
| 805-02-D |
class a(m) concrete (footings)
|
1,254.44 |
CUYD |
1,100.00 |
1,379,884.00 |
|
|
|
|
|
|
| 805-02-F |
class a(m) concrete (bents)
|
2,156.00 |
CUYD |
1,100.00 |
2,371,600.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
756,993   |
LB |
1.25 |
946,241.25 |
|
|
|
|
|
|
| 807-06 |
structural metalwork
|
lump |
LUMP |
6,921,000.00 |
6,921,000.00 |
|
|
|
|
|
|
| S-001 |
removal of eastbank railroad structure
|
lump |
LUMP |
1,400,000.00 |
1,400,000.00 |
|
|
|
|
|
|
| S-002 |
removal of westbank railroad structure
|
lump |
LUMP |
250,000.00 |
250,000.00 |
|
|
|
|
|
|
| S-003 |
removal of gas station
|
lump |
LUMP |
150,000.00 |
150,000.00 |
|
|
|
|
|
|
| S-004 |
removal of eastbank power poles and power lines
|
lump |
LUMP |
8,000.00 |
8,000.00 |
|
|
|
|
|
|
| S-101 |
railroad deck
|
lump |
LUMP |
700,000.00 |
700,000.00 |
|
|
|
|
|
|
| S-102 |
construction site survey
|
lump |
LUMP |
150,000.00 |
150,000.00 |
|
|
|
|
|
|
| S-103 |
vibration monitoring
|
lump |
LUMP |
60,000.00 |
60,000.00 |
|
|
|
|
|
|
| S-104 |
dynamic analysis
|
4   |
each |
2,500.00 |
10,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
20,516,783.05 |
|
|
|
|
|
|
|