Letting of 4/26/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-30-0120
Parish: LASALLE
Routes:
Description: VESTA LANE BRIDGE OVER SALEM CREEK & CARPENENTER ST. BRIDGE
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
pavement, concrete slab span bridge, and related work.
Estimated Construction Cost: $515,236.00
 
RankLicenseBidderConstruction Bid
1 23112 BEN ALLEN, INC. $693,597.50
2 18546 C W & W CONTRACTORS, INC. $706,312.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
BEN ALLEN, INC.
- 2 -
C W & W CONTRACTORS, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 60,000.00 60,000.00 20,000.00 20,000.00        
202-02-A-01 removal of bridge(sta. 100+00; 23.8' wide x 73.4' long
timber bridge)
1      EACH 5,000.00 5,000.00 10,000.00 10,000.00        
202-02-A-02 removal of bridge(sta. 100+00,23.4' wide x 39.9' long
timber bridge)
1      EACH 5,000.00 5,000.00 10,000.00 10,000.00        
203-06 excavation & embankment lump      LUMP 80,000.00 80,000.00 35,000.00 35,000.00        
204-02 temporary hay or straw bales 40      EACH FREE FREE 10.00 400.00        
204-03 temporary slope drains 200      LNFT FREE FREE 8.00 1,600.00        
204-05-A temporary sediment check dams (hay) 8      EACH FREE FREE 125.00 1,000.00        
204-06 temporary silt fencing 520      LNFT FREE FREE 3.00 1,560.00        
302-01 class ii base course 74.7    CUYD 95.00 7,096.50 75.00 5,602.50        
401-02 aggregate surface course (adjusted vehicular
measurement)
11      CUYD 95.00 1,045.00 200.00 2,200.00        
403-01 aggregate roadway surfacing (vehicular measurement) 153.4    CUYD 95.00 14,573.00 80.00 12,272.00        
502-01 superpave asphaltic concrete 71.3    TON 165.00 11,764.50 200.00 14,260.00        
701-05-I-01 side drain pipe (24")(erosion) 100      LNFT 65.00 6,500.00 50.00 5,000.00        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 55.00 5,500.00 70.00 7,000.00        
704-09 guard rail anchor sections (turndown) 100.0    LNFT 35.00 3,500.00 35.00 3,500.00        
712-04 flexible revetment 632      SQYD 65.00 41,080.00 65.00 41,080.00        
713-01 temporary signs & barricades lump      LUMP 16,000.00 16,000.00 20,000.00 20,000.00        
726-01 bedding material 139.7    CUYD 95.00 13,271.50 100.00 13,970.00        
727-01 mobilization lump      LUMP 59,000.00 59,000.00 80,000.00 80,000.00        
729-16-B object marker assembly (type 2) 4      EACH 55.00 220.00 70.00 280.00        
729-16-C object marker assembly (type 3) 8      EACH 70.00 560.00 85.00 680.00        
740-01 construction layout lump      LUMP 7,000.00 7,000.00 20,000.00 20,000.00        
744-01 traffic control management lump      LUMP 2,500.00 2,500.00 10,000.00 10,000.00        
804-01-B precast concrete piles (14") 882      LNFT 48.00 42,336.00 85.00 74,970.00        
804-12 loading permanent piles 1      EACH FREE FREE 250.00 250.00        
805-01-B class a concrete (box culvert headwalls) 44.36   CUYD 1,200.00 53,232.00 1,000.00 44,360.00        
805-10-A bridge superstructure & substructure(24' clear roadway;
90 degree crossing)
5      SPAN 20,000.00 100,000.00 23,000.00 115,000.00        
805-12-S-01 reinforced concrete box culverts (8'x 8')(precast
only,astm c1433)
126.0    LNFT 1,050.00 132,300.00 1,000.00 126,000.00        
806-01 deformed reinforcing steel 3,164      LB 2.25 7,119.00 2.00 6,328.00        
S-101 retroreflective sheeting panels lump      lump 2,000.00 2,000.00 5,000.00 5,000.00        
S-102 concrete approach slabs(24' clear roadway; 90 degree
crossing, without asphalt)
2      EACH 8,500.00 17,000.00 9,500.00 19,000.00        
                       
 CONTRACTOR TOTAL       693,597.50   706,312.50        