Letting of 4/26/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-21-0107
Parish: FRANKLIN
Routes:
Description: HARVARD STREET, DEER CREEK, AND MARK FRANKS ROAD BRIDGES
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
overlay, pavement patching & widening, concrete slab span bridges, and related work.
Estimated Construction Cost: $825,137.30
 
RankLicenseBidderConstruction Bid
1 14788 LOUISIANA BRIDGE, INC. $908,570.08
2 18546 C W & W CONTRACTORS, INC. $980,747.60
 
Item Number Item Description Quantity Unit of Measure - 1 -
LOUISIANA BRIDGE, INC.
- 2 -
C W & W CONTRACTORS, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 14,500.00 14,500.00 10,000.00 10,000.00        
202-02-A-01 removal of bridge (sta.1+150.000, 9.475 m wide x
17.350 m long timber bridge)
1      ea 12,500.00 12,500.00 10,000.00 10,000.00        
202-02-A-02 removal of bridge (sta.1+150.000, 6.160 m wide x
23.420 m long timber bridge)
1      ea 8,000.00 8,000.00 7,500.00 7,500.00        
202-02-A-03 removal of bridge (sta.1+150.000, 5.095 m wide x
17.306 m long timber bridge)
1      ea 4,000.00 4,000.00 7,500.00 7,500.00        
203-06 excavation & embankment lump      lump 58,000.00 58,000.00 25,000.00 25,000.00        
204-02 temporary hay or straw bales 70      ea 1.00 70.00 10.00 700.00        
204-03 temporary slope drains 90      ln m 1.00 90.00 30.00 2,700.00        
204-05-A temporary sediment check dams (hay) 12      ea 1.00 12.00 125.00 1,500.00        
204-06 temporary silt fencing 689      ln m 1.00 689.00 10.00 6,890.00        
302-01 class ii base course 176.7    cu m 150.00 26,505.00 100.00 17,670.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
37      cu m 66.00 2,442.00 100.00 3,700.00        
403-01 aggregate roadway surfacing (vehicular measurement) 87.0    cu m 71.00 6,177.00 100.00 8,700.00        
502-01 superpave asphaltic concrete 296.4    Mg 187.50 55,575.00 250.00 74,100.00        
701-05-I side drain pipe (600 mm) 32.0    ln m 176.00 5,632.00 125.00 4,000.00        
701-05-I-01 side drain pipe (600 mm) (erosion) 20.0    ln m 176.00 3,520.00 125.00 2,500.00        
701-05-M side drain pipe (900 mm) 8.0    ln m 330.00 2,640.00 200.00 1,600.00        
701-05-M-01 side drain pipe (900 mm) (erosion) 30.0    ln m 330.00 9,900.00 200.00 6,000.00        
704-08-B guard rail transitions (double thrie beam) 45.72   ln m 176.00 8,046.72 225.00 10,287.00        
704-09 guard rail anchor sections (turndown) 45.72   ln m 148.00 6,766.56 105.00 4,800.60        
704-11-A guard rail end treatment (flared) 2      ea 2,838.00 5,676.00 2,400.00 4,800.00        
706-01-A concrete walk (100 mm thick) 10.8    sq m 85.00 918.00 100.00 1,080.00        
711-01-C riprap (15 kg, 360 mm thick) 311      sq m 64.00 19,904.00 80.00 24,880.00        
711-01-D riprap (25 kg, 460 mm thick) 640      sq m 64.00 40,960.00 85.00 54,400.00        
711-04 geotextile fabric 951      sq m 4.00 3,804.00 3.00 2,853.00        
713-01 temporary signs & barricades lump      lump 11,000.00 11,000.00 17,000.00 17,000.00        
724-01-B pavement patching (300 mm minimum thickness) 54      sq m 142.00 7,668.00 200.00 10,800.00        
724-02 pavement widening 138.9    sq m 142.00 19,723.80 150.00 20,835.00        
727-01 mobilization lump      lump 70,000.00 70,000.00 75,000.00 75,000.00        
729-16-C object marker assembly (type 3) 18      ea 80.00 1,440.00 85.00 1,530.00        
740-01 construction layout lump      lump 15,000.00 15,000.00 20,000.00 20,000.00        
804-01-C precast concrete piles (400 mm) 796.4    ln m 220.00 175,208.00 230.00 183,172.00        
804-12 loading permanent piles 3      ea 1.00 3.00 250.00 750.00        
805-10-A bridge superstructure & substructure (8.5 m roadway;
90 degree crossing) (with sidewalk)
(cast-in-place)
4      span 27,500.00 110,000.00 25,000.00 100,000.00        
805-10-B bridge superstructure & substructure (7.3 m roadway;
90 degree crossing) (cast-in-place bents)
9      span 18,500.00 166,500.00 24,000.00 216,000.00        
S-001 vibration monitoring lump      lump 5,000.00 5,000.00 7,500.00 7,500.00        
S-101 concrete approach slabs (7.3 m roadway; 90 degree
crossing)
2      ea 7,400.00 14,800.00 7,500.00 15,000.00        
S-102 concrete approach slabs (8.5 m roadway; 90 degree
crossing) (with tapered barrier rail)
2      ea 7,950.00 15,900.00 10,000.00 20,000.00        
                       
 CONTRACTOR TOTAL       908,570.08   980,747.60        