DBE GOAL FED
Lead Project: 713-02-0109
Parish: ALLEN
Routes:
Description: BRIDGES IN ALLEN PARISH
Type Const: grading, class ii base course, superpave asphaltic concrete pavement, drainage
structures, concrete slab span bridges, and related work.
Estimated Construction Cost: $1,114,337.90
 
RankLicenseBidderConstruction Bid
1 18546 C W & W CONTRACTORS, INC. $1,340,576.70
2 08815 W. E. MCDONALD & SON, LLC. $1,371,246.35
3 09090 GUINN BROTHERS, LLC. $1,422,078.28
4 00060 F. MILLER & SONS, LLC $1,751,891.04
 
Item Number Item Description Quantity Unit of Measure - 1 -
C W & W CONTRACTORS, INC.
- 2 -
W. E. MCDONALD & SON, LLC.
- 3 -
GUINN BROTHERS, LLC.
- 4 -
F. MILLER & SONS, LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 20,000.00 20,000.00 31,000.00 31,000.00 54,000.00 54,000.00 53,000.00 53,000.00
202-01 removal of structures & obstructions lump      lump 25,000.00 25,000.00 10,000.00 10,000.00 15,000.00 15,000.00 11,400.00 11,400.00
202-02-A-01 removal of bridge(sta. 1+150 - 6.2m x 10.4m timber
bridge)
1      ea 7,500.00 7,500.00 12,000.00 12,000.00 5,000.00 5,000.00 15,300.00 15,300.00
202-02-A-02 removal of bridge(sta. 1+015 - 6.2m x 11.5m timber
bridge)
1      ea 1,500.00 1,500.00 5,000.00 5,000.00 5,000.00 5,000.00 18,000.00 18,000.00
202-02-A-03 removal of bridge(sta. 1+150 - 6.3m x 32.5m timber
bridge)
1      ea 7,500.00 7,500.00 5,000.00 5,000.00 14,000.00 14,000.00 38,900.00 38,900.00
202-02-A-04 removal of bridge(sta. 1+180 - 5.5m x 9.5m timber
bridge)
1      ea 1,500.00 1,500.00 4,000.00 4,000.00 4,500.00 4,500.00 15,400.00 15,400.00
202-02-A-05 removal of bridge(sta. 1+150 - 6.6m x 7.8m timber
bridge)
1      ea 1,500.00 1,500.00 3,000.00 3,000.00 22,500.00 22,500.00 10,600.00 10,600.00
203-06 excavation & embankment lump      lump 45,000.00 45,000.00 50,000.00 50,000.00 75,000.00 75,000.00 162,300.00 162,300.00
204-02 temporary hay or straw bales 70      ea 10.00 700.00 15.00 1,050.00 10.00 700.00 10.00 700.00
204-03 temporary slope drains 92      ln m 20.00 1,840.00 25.00 2,300.00 10.00 920.00 16.00 1,472.00
204-05-A temporary sediment check dams (hay) 13      ea 125.00 1,625.00 400.00 5,200.00 100.00 1,300.00 142.00 1,846.00
204-06 temporary silt fencing 440      ln m 10.00 4,400.00 10.00 4,400.00 3.00 1,320.00 7.00 3,080.00
302-01 class ii base course 665.9    cu m 85.00 56,601.50 98.00 65,258.20 100.00 66,590.00 132.00 87,898.80
401-02 aggregate surface course (adjusted vehicular
measurement)
68      cu m 100.00 6,800.00 80.00 5,440.00 100.00 6,800.00 132.00 8,976.00
502-01 superpave asphaltic concrete 628.8    Mg 200.00 125,760.00 235.00 147,768.00 200.00 125,760.00 340.00 213,792.00
701-01-Q/S cross drain pipe (1500 mm rcp/pcp or 1800 mm cmp) 56.0    ln m 1,100.00 61,600.00 645.00 36,120.00 850.00 47,600.00 1,800.00 100,800.00
701-05-I side drain pipe (600 mm) 29.4    ln m 150.00 4,410.00 175.00 5,145.00 200.00 5,880.00 205.00 6,027.00
704-08-B guard rail transitions (double thrie beam) 60.96   ln m 220.00 13,411.20 165.00 10,058.40 195.00 11,887.20 208.00 12,679.68
704-09 guard rail anchor sections (turndown) 60.96   ln m 100.00 6,096.00 135.00 8,229.60 98.00 5,974.08 93.00 5,669.28
705-01 barbed wire fence 214      ln m 24.00 5,136.00 23.00 4,922.00 20.00 4,280.00 26.00 5,564.00
705-02 combination mesh & barbed wire fence 35      ln m 32.00 1,120.00 26.00 910.00 40.00 1,400.00 30.00 1,050.00
711-01-D riprap (25 kg,460 mm thick ) 599      sq m 85.00 50,915.00 60.00 35,940.00 75.00 44,925.00 67.00 40,133.00
711-04 geotextile fabric 599      sq m 2.00 1,198.00 3.00 1,797.00 5.00 2,995.00 4.00 2,396.00
713-01 temporary signs & barricades lump      lump 35,000.00 35,000.00 50,000.00 50,000.00 58,000.00 58,000.00 55,000.00 55,000.00
720-01-A erosion control system, slope protection (type a) 101      sq m 7.00 707.00 15.00 1,515.00 5.00 505.00 6.00 606.00
726-01 bedding material 169.5    cu m 105.00 17,797.50 80.00 13,560.00 95.00 16,102.50 152.00 25,764.00
727-01 mobilization lump      lump 75,000.00 75,000.00 100,000.00 100,000.00 130,000.00 130,000.00 130,000.00 130,000.00
729-01 sign (type a) 1.11   sq m 1,000.00 1,110.00 135.00 149.85 1,000.00 1,110.00 198.00 219.78
729-16-B object marker assembly (type 2) 12      ea 70.00 840.00 45.00 540.00 100.00 1,200.00 65.00 780.00
729-16-C object marker assembly (type 3) 16      ea 85.00 1,360.00 70.00 1,120.00 110.00 1,760.00 78.00 1,248.00
729-21 u-channel post 2      ea 50.00 100.00 75.00 150.00 100.00 200.00 161.00 322.00
735-01 mailboxes 2      ea 50.00 100.00 1.00 2.00 100.00 200.00 33.00 66.00
735-02 mailbox supports (single) 2      ea 50.00 100.00 500.00 1,000.00 100.00 200.00 194.00 388.00
740-01 construction layout lump      lump 30,000.00 30,000.00 30,000.00 30,000.00 16,000.00 16,000.00 12,400.00 12,400.00
744-01 traffic control management lump      lump 25,000.00 25,000.00 15,000.00 15,000.00 65,000.00 65,000.00 12,000.00 12,000.00
804-01-B precast concrete piles (350 mm) 652.5    ln m 215.00 140,287.50 164.00 107,010.00 145.00 94,612.50 169.00 110,272.50
804-12 loading permanent piles 2      ea 250.00 500.00 1.00 2.00 1.00 2.00 100.00 200.00
805-01-A class a concrete (pipe headwalls) 41.29   cu m 1,000.00 41,290.00 800.00 33,032.00 1,300.00 53,677.00 1,400.00 57,806.00
805-01-B class a concrete (box culvert headwalls) 40.26   cu m 1,200.00 48,312.00 980.00 39,454.80 1,300.00 52,338.00 1,100.00 44,286.00
805-10-A bridge superstructure & substructure(7.3m - 90 degree
crossing)
3      span 23,000.00 69,000.00 33,000.00 99,000.00 21,000.00 63,000.00 19,700.00 59,100.00
805-10-B bridge superstructure & substructure(7.3m - 90 degree
crossing)(c.i.p.)
6      span 25,000.00 150,000.00 35,000.00 210,000.00 22,000.00 132,000.00 29,700.00 178,200.00
805-12-I reinforced concrete box culverts (1500 mm x 1500 mm) 120.75   ln m 1,700.00 205,275.00 1,460.00 176,295.00 1,400.00 169,050.00 1,660.00 200,445.00
806-01 deformed reinforcing steel 3,930      kg 4.50 17,685.00 1.75 6,877.50 3.00 11,790.00 2.80 11,004.00
S-101 concrete approach slabs(7.3m clear roadway, 90 degree
crossing)
2      ea 7,500.00 15,000.00 8,000.00 16,000.00 8,000.00 16,000.00 8,700.00 17,400.00
S-102 concrete approach slabs(7.3m clear roadway, 90 degree
crossing)(curved) (c.i.p.)
2      ea 7,500.00 15,000.00 8,000.00 16,000.00 8,000.00 16,000.00 8,700.00 17,400.00
                       
 CONTRACTOR TOTAL       1,340,576.70   1,371,246.35   1,422,078.28   1,751,891.04