Error processing SSI file
Error processing SSI file
Bid Tabs Error processing SSI file
Bid Tabulations Error processing SSI file
February 06, 2014 Error processing SSI file

Letting of 4/26/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 451-06-0124
Parish: OUACHITA
Routes: I-20
Description: VANCIL RD. OVERPASS - LA 34 (STELLA)
Type Const: cold planing asphaltic pavement, superpave asphaltic conc overlay, concrete joint
repair, and related work.
Estimated Construction Cost: $1,829,078.41
 
RankLicenseBidderConstruction Bid
1 05789 D & J CONSTRUCTION CO., INC. $2,190,119.67
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,705,644.71
3 12312 GILCHRIST CONSTRUCTION CO. LLC $3,466,011.96
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
502-01 superpave asphaltic concrete 14,241.8    TON 80.00 1,139,344.00 80.00 1,139,344.00 99.00 1,409,938.20    
509-01 cold planing asphaltic pavement 129,466      SQYD 2.50 323,665.00 4.00 517,864.00 6.00 776,796.00    
509-02 contractor retained reclaimed asphaltic pavement - 3,604      CUYD 0.01 - 36.04 0.10 - 360.40 0.01 - 36.04    
602-05-K-01 full depth patching of jointed conc pvmt (10" thick)
(16.0 sq yds & under)
100.0    SQYD 300.00 30,000.00 400.00 40,000.00 500.00 50,000.00    
713-01 temporary signs & barricades lump      LUMP 150,000.00 150,000.00 270,000.00 270,000.00 250,000.00 250,000.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
9.852  MILE 230.00 2,265.96 170.00 1,674.84 500.00 4,926.00    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
9.852  MILE 1.00 9.85 541.00 5,329.93 600.00 5,911.20    
713-05-A temporary pavement markings (solid line)(4" width) 19.704  MILE 1.00 19.70 1,200.00 23,644.80 1,200.00 23,644.80    
727-01 mobilization lump      LUMP 148,000.00 148,000.00 270,000.00 270,000.00 300,000.00 300,000.00    
731-02 reflectorized raised pavement markers 1,302      EACH 7.55 9,830.10 7.00 9,114.00 6.00 7,812.00    
732-01-A plastic pavement striping (4" width) 2,133      LNFT 0.90 1,919.70 0.58 1,237.14 0.60 1,279.80    
732-01-C plastic pavement striping (8" width) 3,866      LNFT 2.55 9,858.30 1.18 4,561.88 1.00 3,866.00    
732-01-E plastic pavement striping (24" width) 1,418      LNFT 5.25 7,444.50 3.54 5,019.72 3.00 4,254.00    
732-02-A plastic pavement striping (solid line) (4" width) 19.704  MILE 2,675.00 52,708.20 3,300.00 65,023.20 2,600.00 51,230.40    
732-03-A plastic pavement striping (broken line)(4" width) 9.852  MILE 950.00 9,359.40 1,600.00 15,763.20 1,300.00 12,807.60    
740-01 construction layout lump      LUMP 30,000.00 30,000.00 85,000.00 85,000.00 30,000.00 30,000.00    
744-01 traffic control management lump      LUMP 75,000.00 75,000.00 33,000.00 33,000.00 300,000.00 300,000.00    
S-001 cleaning shoulder underdrain outlets 98      EACH 255.00 24,990.00 370.00 36,260.00 100.00 9,800.00    
S-002 replacing shoulder underdrain outlets 5      EACH 525.00 2,625.00 500.00 2,500.00 300.00 1,500.00    
S-003 dynamic message sign unit 4      EACH 6,000.00 24,000.00 8,200.00 32,800.00 5,000.00 20,000.00    
S-004 raising and/or under-sealing approach slabs 2,200      LBS 5.50 12,100.00 5.25 11,550.00 6.00 13,200.00    
S-922 sawing and sealing longitudinal joints in asphaltic
concrete overlay
40,856      LNFT 1.75 71,498.00 1.50 61,284.00 1.75 71,498.00    
S-923 sawing and sealing transverse joints in asphaltic
concrete overlay
8,968      LNFT 1.75 15,694.00 1.70 15,245.60 2.00 17,936.00    
S-927 sawcuts in asphaltic concrete lifts 49,824      LNFT 1.00 49,824.00 1.20 59,788.80 2.00 99,648.00    
                       
 CONTRACTOR TOTAL       2,190,119.67   2,705,644.71   3,466,011.96    

Error processing SSI file