Letting of 4/26/2006 LA DOTD Headquarters


READV
go back
Go Back
 
Lead Project: 428-01-0013
Parish: ST JAMES, ST JOHN
Routes: LA 3213, LA 3127
Description: GRAMERCY BRIDGE APPROACH (WEST BANK) / LA 3127 TO LA 18
Type Const: gr., dr. str., acp, (alt. a1-class ii bc 12" cr stone or recycled pccp; alt. a2-class
ii bc 4" cr stone or recycled pccp & 8" soil cmt), and related work.
Estimated Construction Cost: $12,445,269.87
 
RankLicenseBidderConstruction Bid
1 12198 BYRON E. TALBOT CONTRACTOR, INC. $14,320,571.87
2 00481 COASTAL BRIDGE CO., L.L.C. $15,437,576.05
3 34567 JAMES CONSTRUCTION GROUP LLC $16,536,573.39
4 14807 RICHARD PRICE CONTRACTING CO, LLC $16,906,397.81
5 06276 BARRIERE CONSTRUCTION CO., LLC. $17,140,611.30
6 45211 CERES CARIBE INC. $23,312,293.74
 
Item Number Item Description Quantity Unit of Measure - 1 -
BYRON E. TALBOT CONTRACTOR, INC.
- 2 -
COASTAL BRIDGE CO., L.L.C.
- 3 -
JAMES CONSTRUCTION GROUP LLC
- 4 -
RICHARD PRICE CONTRACTING CO, LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 480,000.00 480,000.00 815,000.00 815,000.00 285,000.00 285,000.00 250,000.00 250,000.00
202-02-G removal of surfacing & stabilized base 3,269.5    SQYD 6.00 19,617.00 15.00 49,042.50 6.00 19,617.00 5.00 16,347.50
203-01 general excavation 84,464      CUYD 5.00 422,320.00 5.00 422,320.00 3.50 295,624.00 6.00 506,784.00
203-02 drainage excavation 3,193      CUYD 6.00 19,158.00 6.00 19,158.00 16.00 51,088.00 8.00 25,544.00
203-03 muck excavation 32,614      CUYD 5.40 176,115.60 5.00 163,070.00 14.00 456,596.00 6.40 208,729.60
203-04 embankment 226,111      CUYD 12.17 2,751,770.87 16.30 3,685,609.30 18.50 4,183,053.50 14.35 3,244,692.85
203-08 borrow (vehicular measurement) 2,899      CUYD 12.00 34,788.00 15.00 43,485.00 12.00 34,788.00 13.00 37,687.00
204-05-A temporary sediment check dams (hay) 53      EACH 200.00 10,600.00 60.00 3,180.00 90.00 4,770.00 100.00 5,300.00
204-06 temporary silt fencing 44,975      LNFT 2.30 103,442.50 1.50 67,462.50 2.60 116,935.00 1.50 67,462.50
302-02-E class ii base course (4" thick)(shlds.)(crushed stone
or recycled pccp)
58,695.0    SQYD 9.00 528,255.00 12.00 704,340.00 4.20 246,519.00 9.70 569,341.50
304-01 lime 2,335.00   TON 1.00 2,335.00 40.00 93,400.00 124.00 289,540.00 152.00 354,920.00
304-05 lime treatment (type e) 2,335.00   TON 200.00 467,000.00 30.00 70,050.00 107.00 249,845.00 110.00 256,850.00
401-02 aggregate surface course (adjusted vehicular
measurement)
65      CUYD 82.00 5,330.00 100.00 6,500.00 80.00 5,200.00 50.00 3,250.00
402-01 traffic maintenance aggregate (vehicular measurement) 125.0    CUYD 55.00 6,875.00 100.00 12,500.00 70.00 8,750.00 60.00 7,500.00
502-01 superpave asphaltic concrete (level 1) 45,955.3    TON 74.50 3,423,669.85 45.00 2,067,988.50 69.75 3,205,382.18 75.35 3,462,731.86
509-01 cold planing asphaltic pavement 300      SQYD 22.00 6,600.00 15.00 4,500.00 22.00 6,600.00 42.00 12,600.00
701-01-I cross drain pipe (24" rcp/pcp) 5,136      LNFT 48.20 247,555.20 70.00 359,520.00 80.00 410,880.00 77.00 395,472.00
701-01-K cross drain pipe (30" rcp/pcp) 926      LNFT 68.00 62,968.00 80.00 74,080.00 95.00 87,970.00 113.00 104,638.00
701-01-M cross drain pipe (36" rcp/pcp) 6,144      LNFT 91.60 562,790.40 105.00 645,120.00 116.00 712,704.00 121.80 748,339.20
701-01-N cross drain pipe (42" rcp/pcp) 754      LNFT 123.40 93,043.60 125.00 94,250.00 158.00 119,132.00 169.00 127,426.00
701-01-O cross drain pipe (48" rcp/pcp) 1,611      LNFT 158.00 254,538.00 145.00 233,595.00 190.00 306,090.00 195.00 314,145.00
701-03-F storm drain pipe (15" rcp/pcp) 1,375      LNFT 31.40 43,175.00 40.00 55,000.00 64.00 88,000.00 66.00 90,750.00
701-05-G side drain pipe (18") 144      LNFT 42.00 6,048.00 40.00 5,760.00 90.00 12,960.00 46.00 6,624.00
702-03-A catch basins (cb-01) 16      EACH 2,500.00 40,000.00 3,000.00 48,000.00 7,500.00 120,000.00 3,200.00 51,200.00
705-06-C chain link fence (6-foot height) 38,074      LNFT 13.50 513,999.00 14.00 533,036.00 21.00 799,554.00 16.00 609,184.00
708-01 right-of-way monument 66      EACH 30.00 1,980.00 400.00 26,400.00 135.00 8,910.00 175.00 11,550.00
708-02 right-of-way monument witness post 66      EACH 50.00 3,300.00 400.00 26,400.00 55.00 3,630.00 150.00 9,900.00
713-01 temporary signs & barricades lump      LUMP 21,800.00 21,800.00 75,000.00 75,000.00 12,000.00 12,000.00 31,000.00 31,000.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
0.878  MILE 4,000.00 3,512.00 1,000.00 878.00 2,000.00 1,756.00 4,000.00 3,512.00
713-05-A temporary pavement markings (solid line)(4" width) 0.878  MILE 2,100.00 1,843.80 2,000.00 1,756.00 1,900.00 1,668.20 2,100.00 1,843.80
713-07 temporary reflectorized raised pavement markers 116      EACH 5.00 580.00 5.00 580.00 4.25 493.00 4.75 551.00
716-01-A mulch (vegetative) 176.00   ACRE 720.00 126,720.00 750.00 132,000.00 650.00 114,400.00 545.00 95,920.00
717-01 seeding 5,280      LB 7.10 37,488.00 7.00 36,960.00 6.50 34,320.00 7.00 36,960.00
718-01 fertilizer 176,000      LB 0.30 52,800.00 0.30 52,800.00 0.26 45,760.00 0.40 70,400.00
720-01-A erosion control system, slope protection (type a) 29,983      SQYD 1.20 35,979.60 1.25 37,478.75 1.10 32,981.30 1.65 49,471.95
722-01 project site laboratory 1      EACH 12,000.00 12,000.00 20,000.00 20,000.00 16,000.00 16,000.00 25,000.00 25,000.00
726-01 bedding material 1,578.1    CUYD 95.00 149,919.50 10.00 15,781.00 65.00 102,576.50 80.00 126,248.00
727-01 mobilization lump      LUMP 550,000.00 550,000.00 1,500,000.00 1,500,000.00 1,520,000.00 1,520,000.00 1,252,000.00 1,252,000.00
731-02 reflectorized raised pavement markers 2,103      EACH 5.50 11,566.50 6.00 12,618.00 5.10 10,725.30 5.65 11,881.95
732-02-A plastic pavement striping (solid line) (4" width) 15.925  MILE 2,350.00 37,423.75 2,200.00 35,035.00 2,150.00 34,238.75 2,365.00 37,662.63
732-02-C plastic pavement striping (solid line) (8" width) 1.128  MILE 4,700.00 5,301.60 4,300.00 4,850.40 4,300.00 4,850.40 4,730.00 5,335.44
732-02-E plastic pavement striping (solid line) (24" width) 0.491  MILE 14,000.00 6,874.00 13,000.00 6,383.00 12,900.00 6,333.90 14,190.00 6,967.29
732-03-A plastic pavement striping (broken line)(4" width) 4.334  MILE 820.00 3,553.88 750.00 3,250.50 740.00 3,207.16 814.00 3,527.88
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 160.00 320.00 150.00 300.00 145.00 290.00 160.00 320.00
732-04-C plastic pavement legends & symbols (only) 2      EACH 180.00 360.00 170.00 340.00 165.00 330.00 182.00 364.00
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 440.00 880.00 400.00 800.00 400.00 800.00 440.00 880.00
732-05 removal of existing markings 0.350  MILE 8,200.00 2,870.00 7,500.00 2,625.00 7,500.00 2,625.00 8,250.00 2,887.50
740-01 construction layout lump      LUMP 141,000.00 141,000.00 125,000.00 125,000.00 200,000.00 200,000.00 300,000.00 300,000.00
744-01 traffic control management lump      LUMP 14,000.00 14,000.00 45,000.00 45,000.00 9,000.00 9,000.00 90,000.00 90,000.00
S-001 impact attenuators (kinetic) 1      EACH 24,650.00 24,650.00 25,000.00 25,000.00 22,300.00 22,300.00 27,500.00 27,500.00
 SUBTOTAL GENERAL       11,528,716.65   12,463,202.45   14,305,793.19   13,679,202.45
                       
ALTERNATE A class ii base course                    
                       
ALTERNATE A1 class ii base course (12" thick)                    
302-02-D class ii base course (12" thick)(crushed stone or
recycled pccp)
135,198.8    SQYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
                       
ALTERNATE A2 class ii base course (4" & 8" thick)                    
302-02-F class ii base course (4" thick)(crushed stone or
recycled pccp)
135,198.8    SQYD 8.85 1,196,509.38 13.00 1,757,584.40 8.75 1,182,989.50 9.62 1,300,612.46
302-02-G class ii base course (8" thick)(soil cement) 135,198.8    SQYD 11.80 1,595,345.84 9.00 1,216,789.20 7.75 1,047,790.70 14.25 1,926,582.90
 SUBTOTAL ALT A2       2,791,855.22   2,974,373.60   2,230,780.20   3,227,195.36
                       
 CONTRACTOR TOTAL       14,320,571.87   15,437,576.05   16,536,573.39   16,906,397.81
 
Item Number Item Description Quantity Unit of Measure - 5 -
BARRIERE CONSTRUCTION CO., LLC.
- 6 -
CERES CARIBE INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 700,000.00 700,000.00 339,000.00 339,000.00        
202-02-G removal of surfacing & stabilized base 3,269.5    SQYD 10.00 32,695.00 5.00 16,347.50        
203-01 general excavation 84,464      CUYD 7.00 591,248.00 15.00 1,266,960.00        
203-02 drainage excavation 3,193      CUYD 7.00 22,351.00 26.00 83,018.00        
203-03 muck excavation 32,614      CUYD 7.00 228,298.00 31.00 1,011,034.00        
203-04 embankment 226,111      CUYD 16.00 3,617,776.00 20.00 4,522,220.00        
203-08 borrow (vehicular measurement) 2,899      CUYD 10.00 28,990.00 22.00 63,778.00        
204-05-A temporary sediment check dams (hay) 53      EACH 55.00 2,915.00 153.00 8,109.00        
204-06 temporary silt fencing 44,975      LNFT 1.50 67,462.50 2.25 101,193.75        
302-02-E class ii base course (4" thick)(shlds.)(crushed stone
or recycled pccp)
58,695.0    SQYD 9.00 528,255.00 12.00 704,340.00        
304-01 lime 2,335.00   TON 10.00 23,350.00 185.00 431,975.00        
304-05 lime treatment (type e) 2,335.00   TON 1.00 2,335.00 60.00 140,100.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
65      CUYD 75.00 4,875.00 53.00 3,445.00        
402-01 traffic maintenance aggregate (vehicular measurement) 125.0    CUYD 60.00 7,500.00 48.00 6,000.00        
502-01 superpave asphaltic concrete (level 1) 45,955.3    TON 79.00 3,630,468.70 86.00 3,952,155.80        
509-01 cold planing asphaltic pavement 300      SQYD 25.00 7,500.00 46.00 13,800.00        
701-01-I cross drain pipe (24" rcp/pcp) 5,136      LNFT 110.00 564,960.00 200.00 1,027,200.00        
701-01-K cross drain pipe (30" rcp/pcp) 926      LNFT 150.00 138,900.00 340.00 314,840.00        
701-01-M cross drain pipe (36" rcp/pcp) 6,144      LNFT 160.00 983,040.00 245.00 1,505,280.00        
701-01-N cross drain pipe (42" rcp/pcp) 754      LNFT 190.00 143,260.00 265.00 199,810.00        
701-01-O cross drain pipe (48" rcp/pcp) 1,611      LNFT 230.00 370,530.00 310.00 499,410.00        
701-03-F storm drain pipe (15" rcp/pcp) 1,375      LNFT 90.00 123,750.00 69.00 94,875.00        
701-05-G side drain pipe (18") 144      LNFT 75.00 10,800.00 79.00 11,376.00        
702-03-A catch basins (cb-01) 16      EACH 3,300.00 52,800.00 3,100.00 49,600.00        
705-06-C chain link fence (6-foot height) 38,074      LNFT 23.00 875,702.00 29.00 1,104,146.00        
708-01 right-of-way monument 66      EACH 50.00 3,300.00 250.00 16,500.00        
708-02 right-of-way monument witness post 66      EACH 80.00 5,280.00 250.00 16,500.00        
713-01 temporary signs & barricades lump      LUMP 13,000.00 13,000.00 16,000.00 16,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
0.878  MILE 200.00 175.60 360.00 316.08        
713-05-A temporary pavement markings (solid line)(4" width) 0.878  MILE 2,200.00 1,931.60 720.00 632.16        
713-07 temporary reflectorized raised pavement markers 116      EACH 5.00 580.00 6.00 696.00        
716-01-A mulch (vegetative) 176.00   ACRE 700.00 123,200.00 645.00 113,520.00        
717-01 seeding 5,280      LB 7.00 36,960.00 7.00 36,960.00        
718-01 fertilizer 176,000      LB 0.30 52,800.00 0.50 88,000.00        
720-01-A erosion control system, slope protection (type a) 29,983      SQYD 1.20 35,979.60 1.25 37,478.75        
722-01 project site laboratory 1      EACH 50,000.00 50,000.00 40,000.00 40,000.00        
726-01 bedding material 1,578.1    CUYD 65.00 102,576.50 60.00 94,686.00        
727-01 mobilization lump      LUMP 1,000,000.00 1,000,000.00 1,100,000.00 1,100,000.00        
731-02 reflectorized raised pavement markers 2,103      EACH 5.50 11,566.50 6.00 12,618.00        
732-02-A plastic pavement striping (solid line) (4" width) 15.925  MILE 2,300.00 36,627.50 2,500.00 39,812.50        
732-02-C plastic pavement striping (solid line) (8" width) 1.128  MILE 4,800.00 5,414.40 4,000.00 4,512.00        
732-02-E plastic pavement striping (solid line) (24" width) 0.491  MILE 14,000.00 6,874.00 20,000.00 9,820.00        
732-03-A plastic pavement striping (broken line)(4" width) 4.334  MILE 800.00 3,467.20 1,000.00 4,334.00        
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 155.00 310.00 160.00 320.00        
732-04-C plastic pavement legends & symbols (only) 2      EACH 175.00 350.00 180.00 360.00        
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 440.00 880.00 1,000.00 2,000.00        
732-05 removal of existing markings 0.350  MILE 8,000.00 2,800.00 7,000.00 2,450.00        
740-01 construction layout lump      LUMP 280,000.00 280,000.00 230,000.00 230,000.00        
744-01 traffic control management lump      LUMP 10,000.00 10,000.00 30,000.00 30,000.00        
S-001 impact attenuators (kinetic) 1      EACH 28,000.00 28,000.00 24,000.00 24,000.00        
 SUBTOTAL GENERAL       14,571,834.10   19,391,528.54        
                       
ALTERNATE A class ii base course                    
                       
ALTERNATE A1 class ii base course (12" thick)                    
302-02-D class ii base course (12" thick)(crushed stone or
recycled pccp)
135,198.8    SQYD 0.00 0.00 29.00 3,920,765.20        
 SUBTOTAL ALT A1           3,920,765.20        
                       
ALTERNATE A2 class ii base course (4" & 8" thick)                    
302-02-F class ii base course (4" thick)(crushed stone or
recycled pccp)
135,198.8    SQYD 9.00 1,216,789.20 0.00 0.00        
302-02-G class ii base course (8" thick)(soil cement) 135,198.8    SQYD 10.00 1,351,988.00 0.00 0.00        
 SUBTOTAL ALT A2       2,568,777.20            
                       
 CONTRACTOR TOTAL       17,140,611.30   23,312,293.74        