Letting of 4/26/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 053-06-0018
Parish: RED RIVER
Routes: LA 1
Description: NATCHITOCHES PARISH LINE - JUNCTION US 84 (NORTH SECTION)
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete pavement,
pavement patching, and related work
Estimated Construction Cost: $715,628.96
 
RankLicenseBidderConstruction Bid
1 08584 MADDEN CONTRACTING CO., INC. $870,989.98
2 12312 GILCHRIST CONSTRUCTION CO. LLC $1,171,248.42
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 700      CUYD 16.00 11,200.00 25.00 17,500.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
200      CUYD 10.00 2,000.00 50.00 10,000.00        
502-01 superpave asphaltic concrete 7,537.9    TON 65.00 489,963.50 80.00 603,032.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
250.0    TON 110.00 27,500.00 160.00 40,000.00        
507-01-A asphaltic surface treatment (1 application) 47,755      SQYD 1.78 85,003.90 2.50 119,387.50        
509-01 cold planing asphaltic pavement 65,663      SQYD 1.00 65,663.00 2.00 131,326.00        
509-02 contractor retained reclaimed asphaltic pavement - 1,368      CUYD 0.10 - 136.80 0.01 - 13.68        
701-10-G reinforced concrete pipe (extension)(18") 16      LNFT 250.00 4,000.00 200.00 3,200.00        
701-15 concrete collar 1      EACH 900.00 900.00 1,600.00 1,600.00        
712-04 flexible revetment 250      SQYD 65.00 16,250.00 60.00 15,000.00        
713-01 temporary signs & barricades lump      LUMP 41,000.00 41,000.00 5,000.00 5,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
10.180  MILE 325.00 3,308.50 400.00 4,072.00        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.962  MILE 1.00 6.96 300.00 2,088.60        
713-05-A temporary pavement markings (solid line)(4" width) 28.182  MILE 1.00 28.18 550.00 15,500.10        
713-06-D temporary pavement legends and symbols (rr crossing) 4      EACH 1.00 4.00 200.00 800.00        
716-01-B mulch (fiber) 3.00   ACRE 1,000.00 3,000.00 1,200.00 3,600.00        
724-01-B pavement patching (12" minimum thickness) 100      SQYD 135.00 13,500.00 150.00 15,000.00        
724-03 pavement joint repair 10.0    TON 350.00 3,500.00 500.00 5,000.00        
727-01 mobilization lump      LUMP 41,000.00 41,000.00 100,000.00 100,000.00        
729-16-B object marker assembly (type 2) 2      EACH 100.00 200.00 60.00 120.00        
731-02 reflectorized raised pavement markers 680      EACH 4.45 3,026.00 5.00 3,400.00        
732-01-E plastic pavement striping (24" width) 33      LNFT 2.40 79.20 3.00 99.00        
732-02-A plastic pavement striping (solid line) (4" width) 14.091  MILE 2,150.00 30,295.65 2,200.00 31,000.20        
732-03-A plastic pavement striping (broken line)(4" width) 3.481  MILE 690.00 2,401.89 700.00 2,436.70        
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 390.00 780.00 400.00 800.00        
735-01 mailboxes 16      EACH 1.00 16.00 50.00 800.00        
735-02 mailbox supports (single) 16      EACH 125.00 2,000.00 150.00 2,400.00        
739-01 hydro-seeding 3.00   ACRE 1,500.00 4,500.00 1,200.00 3,600.00        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 4,500.00 4,500.00        
744-01 traffic control management lump      LUMP 10,000.00 10,000.00 30,000.00 30,000.00        
                       
 CONTRACTOR TOTAL       870,989.98   1,171,248.42        