Letting of 3/29/2006 LA DOTD Headquarters


READV
go back
Go Back
 
Lead Project: 852-04-0011
Parish: ST TAMMANY
Routes: LA 1077
Description: 2.500 MILES NORTH OF JCT. RT US 190 - TANGIPAHOA PARISH LINE
Type Const: grading, cement treated base course, superpave asphaltic concrete overlay, and related
work.
Estimated Construction Cost: $856,971.47
 
RankLicenseBidderConstruction Bid
1 22040 COVINGTON PAVING CO. $907,432.03
2 06276 BARRIERE CONSTRUCTION CO., LLC. $974,950.50
3 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,106,995.82
4 02179 BOH BROS. CONSTRUCTION CO., LLC. $1,200,564.80
 
Item Number Item Description Quantity Unit of Measure - 1 -
COVINGTON PAVING CO.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 4 -
BOH BROS. CONSTRUCTION CO., LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 884      CUYD 9.00 7,956.00 10.00 8,840.00 16.00 14,144.00 17.00 15,028.00
203-08-A borrow (vehicular meas.)(selected soils) 2,652      CUYD 9.00 23,868.00 10.00 26,520.00 17.00 45,084.00 10.00 26,520.00
303-02 removal of existing patches 750      SQYD FREE FREE 1.00 750.00 6.00 4,500.00 7.00 5,250.00
502-01 superpave asphaltic concrete 9,188.2    TON 52.40 481,461.68 58.00 532,915.60 58.00 532,915.60 65.00 597,233.00
502-01-A superpave asphaltic concrete, drives, turnouts, and
miscellaneous
732.4    TON 1.00 732.40 1.00 732.40 85.00 62,254.00 95.00 69,578.00
713-01 temporary signs & barricades lump      LUMP 22,750.00 22,750.00 7,000.00 7,000.00 5,000.00 5,000.00 15,000.00 15,000.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
6.780  MILE 250.00 1,695.00 150.00 1,017.00 150.00 1,017.00 300.00 2,034.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
4.420  MILE 10.00 44.20 10.00 44.20 270.70 1,196.49 400.00 1,768.00
713-05-A temporary pavement markings (solid line)(4" width) 20.580  MILE 10.00 205.80 20.00 411.60 1.00 20.58 600.00 12,348.00
722-01 project site laboratory 1      EACH 1,500.00 1,500.00 300.00 300.00 5,000.00 5,000.00 2,000.00 2,000.00
727-01 mobilization lump      LUMP 44,000.00 44,000.00 70,000.00 70,000.00 110,000.00 110,000.00 100,000.00 100,000.00
731-02 reflectorized raised pavement markers 447      EACH 5.00 2,235.00 6.00 2,682.00 5.00 2,235.00 6.00 2,682.00
732-02-A plastic pavement striping (solid line) (4" width) 10.290  MILE 2,585.00 26,599.65 2,100.00 21,609.00 2,500.00 25,725.00 2,200.00 22,638.00
732-03-A plastic pavement striping (broken line)(4" width) 2.210  MILE 770.00 1,701.70 800.00 1,768.00 750.00 1,657.50 800.00 1,768.00
735-01 mailboxes 35      EACH 10.00 350.00 10.00 350.00 15.00 525.00 6.00 210.00
735-02 mailbox supports (single) 35      EACH 130.00 4,550.00 140.00 4,900.00 175.00 6,125.00 150.00 5,250.00
739-01 hydro-seeding 3.00   ACRE 1,100.00 3,300.00 1,200.00 3,600.00 1,200.00 3,600.00 1,000.00 3,000.00
740-01 construction layout lump      LUMP 8,000.00 8,000.00 10,000.00 10,000.00 10,000.00 10,000.00 5,000.00 5,000.00
744-01 traffic control management lump      LUMP 8,000.00 8,000.00 18,000.00 18,000.00 10,000.00 10,000.00 5,000.00 5,000.00
S-001 cement treated base course (12 inch depth) 49,719      SQYD 5.40 268,482.60 5.30 263,510.70 5.35 265,996.65 6.20 308,257.80
                       
 CONTRACTOR TOTAL       907,432.03   974,950.50   1,106,995.82   1,200,564.80