February 06, 2014 Error processing SSI file

Letting of 2/22/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 858-03-0012
Parish: VERNON
Routes: LA 10
Description: JCT. US 171 - JCT. LA 467
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete pavement,
pavement patching, and related work
Estimated Construction Cost: $981,768.99
 
RankLicenseBidderConstruction Bid
1 34356 PRAIRIE CONTRACTORS INC. $1,033,769.38
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,065,408.34
3 12312 GILCHRIST CONSTRUCTION CO. LLC $1,077,466.32
 
Item Number Item Description Quantity Unit of Measure - 1 -
PRAIRIE CONTRACTORS INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 1,204      CUYD 18.00 21,672.00 12.00 14,448.00 8.00 9,632.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
83      CUYD 75.00 6,225.00 32.00 2,656.00 40.00 3,320.00    
502-01 superpave asphaltic concrete 11,789.5    TON 61.00 719,159.50 61.00 719,159.50 64.00 754,528.00    
502-01-A superpave asphaltic concrete, paved drives and
turnouts
338.4    TON 80.00 27,072.00 100.00 33,840.00 95.00 32,148.00    
509-01 cold planing asphaltic pavement 47,146      SQYD 1.50 70,719.00 1.00 47,146.00 1.65 77,790.90    
702-04-B adjusting catch basins 5      EACH 800.00 4,000.00 2,800.00 14,000.00 950.00 4,750.00    
713-01 temporary signs & barricades lump      LUMP 35,000.00 35,000.00 6,000.00 6,000.00 3,200.00 3,200.00    
713-03-C temporary pavement markings (8" width) 196      LNFT 0.01 1.96 0.23 45.08 0.20 39.20    
713-03-E temporary pavement markings (24" width) 54      LNFT 0.01 0.54 0.69 37.26 0.61 32.94    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
9.154  MILE 350.00 3,203.90 150.00 1,373.10 300.00 2,746.20    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
7.710  MILE 0.01 0.08 200.00 1,542.00 255.00 1,966.05    
713-05-A temporary pavement markings (solid line)(4" width) 25.987  MILE 0.01 0.26 1.00 25.99 475.00 12,343.83    
713-06-D temporary pavement legends and symbols (rr crossing) 4      EACH 0.01 0.04 200.00 800.00 200.00 800.00    
717-01 seeding 120      LB 7.00 840.00 8.00 960.00 8.00 960.00    
718-01 fertilizer 4,000      LB 0.30 1,200.00 0.34 1,360.00 0.33 1,320.00    
721-01 asphalt mulch 8,668      GAL 1.90 16,469.20 2.00 17,336.00 2.00 17,336.00    
724-01-A pavement patching (6" minimum thickness) 200      SQYD 72.00 14,400.00 50.00 10,000.00 70.00 14,000.00    
724-01-C pavement patching (13" minimum thickness) 700      SQYD 82.00 57,400.00 65.00 45,500.00 100.00 70,000.00    
727-01 mobilization lump      LUMP 27,500.00 27,500.00 100,000.00 100,000.00 30,000.00 30,000.00    
731-02 reflectorized raised pavement markers 404      EACH 4.50 1,818.00 5.00 2,020.00 5.00 2,020.00    
732-01-C plastic pavement striping (8" width) 98      LNFT 0.80 78.40 0.92 90.16 0.90 88.20    
732-01-E plastic pavement striping (24" width) 27      LNFT 2.40 64.80 2.75 74.25 2.50 67.50    
732-02-A plastic pavement striping (solid line) (4" width) 8.662  MILE 1,850.00 16,024.70 2,000.00 17,324.00 2,000.00 17,324.00    
732-03-A plastic pavement striping (broken line)(4" width) 2.570  MILE 700.00 1,799.00 800.00 2,056.00 750.00 1,927.50    
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 375.00 750.00 400.00 800.00 400.00 800.00    
735-01 mailboxes 21      EACH 1.00 21.00 15.00 315.00 25.00 525.00    
735-02 mailbox supports (single) 12      EACH 125.00 1,500.00 200.00 2,400.00 150.00 1,800.00    
735-03 mailbox supports (double) 8      EACH 175.00 1,400.00 350.00 2,800.00 200.00 1,600.00    
736-09 loop detector 350      LNFT 15.00 5,250.00 18.00 6,300.00 24.00 8,400.00    
740-01 construction layout lump      LUMP 100.00 100.00 5,000.00 5,000.00 6,000.00 6,000.00    
744-01 traffic control management lump      LUMP 100.00 100.00 10,000.00 10,000.00 1.00 1.00    
                       
 CONTRACTOR TOTAL       1,033,769.38   1,065,408.34   1,077,466.32    