| 203-05 |
nonplastic embankment
|
100   |
CUYD |
70.00 |
7,000.00 |
15.00 |
1,500.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
300   |
CUYD |
30.00 |
9,000.00 |
5.00 |
1,500.00 |
|
|
|
|
| 302-02-D |
class ii base course (12" thick)
|
645.0 |
SQYD |
18.00 |
11,610.00 |
17.00 |
10,965.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
1,145.1 |
TON |
89.00 |
101,913.90 |
80.00 |
91,608.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
49.4 |
TON |
89.00 |
4,396.60 |
80.00 |
3,952.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
5,728   |
SQYD |
9.00 |
51,552.00 |
3.00 |
17,184.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 239   |
CUYD |
10.00 |
- 2,390.00 |
10.00 |
- 2,390.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
4,000   |
LNFT |
1.50 |
6,000.00 |
1.60 |
6,400.00 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
3,000   |
LNFT |
1.50 |
4,500.00 |
2.00 |
6,000.00 |
|
|
|
|
| 602-05-C-02 |
full depth patching of jointed concrete pavement (6"
thick) (16.1 square yards to 48.0 square yards) |
60.0 |
SQYD |
85.00 |
5,100.00 |
180.00 |
10,800.00 |
|
|
|
|
| 602-05-I-02 |
full depth patching of jointed concrete pavement (9"
thick) (16.1 square yards to 48.0 square yards) |
65.0 |
SQYD |
140.00 |
9,100.00 |
180.00 |
11,700.00 |
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
365   |
LNFT |
85.00 |
31,025.00 |
100.00 |
36,500.00 |
|
|
|
|
| 701-14 |
cleaning existing pipes
|
4,830   |
LNFT |
14.00 |
67,620.00 |
8.00 |
38,640.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
4   |
EACH |
2,500.00 |
10,000.00 |
5,000.00 |
20,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
1   |
EACH |
1,500.00 |
1,500.00 |
500.00 |
500.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
68.8 |
LNFT |
20.00 |
1,376.00 |
20.00 |
1,376.00 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
12.5 |
LNFT |
40.00 |
500.00 |
37.00 |
462.50 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
25.0 |
LNFT |
55.00 |
1,375.00 |
52.00 |
1,300.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
3,000.00 |
3,000.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 706-01-C |
concrete walk (6" thick)
|
100.0 |
SQYD |
45.00 |
4,500.00 |
55.00 |
5,500.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
280.0 |
LNFT |
40.00 |
11,200.00 |
40.00 |
11,200.00 |
|
|
|
|
| 711-03-C |
riprap (30 lb)
|
125.0 |
TON |
70.00 |
8,750.00 |
88.00 |
11,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
45,000.00 |
45,000.00 |
85,000.00 |
85,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
230   |
LNFT |
0.30 |
69.00 |
0.50 |
115.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
102   |
LNFT |
1.00 |
102.00 |
2.00 |
204.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.776 |
MILE |
100.00 |
77.60 |
200.00 |
155.20 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.552 |
MILE |
300.00 |
465.60 |
10.00 |
15.52 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
2.020 |
MILE |
500.00 |
1,010.00 |
10.00 |
20.20 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
6   |
EACH |
55.00 |
330.00 |
10.00 |
60.00 |
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
4   |
EACH |
65.00 |
260.00 |
10.00 |
40.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
519   |
SQYD |
25.00 |
12,975.00 |
150.00 |
77,850.00 |
|
|
|
|
| 726-01 |
bedding material
|
90.0 |
CUYD |
60.00 |
5,400.00 |
80.00 |
7,200.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
68,000.00 |
68,000.00 |
|
|
|
|
| 729-19-C |
dead end road installations (type c)
|
1   |
EACH |
800.00 |
800.00 |
800.00 |
800.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
85   |
EACH |
6.00 |
510.00 |
6.00 |
510.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
230   |
LNFT |
1.00 |
230.00 |
1.00 |
230.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
100   |
LNFT |
3.00 |
300.00 |
3.00 |
300.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.673 |
MILE |
2,500.00 |
1,682.50 |
3,000.00 |
2,019.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.517 |
MILE |
1,000.00 |
517.00 |
1,000.00 |
517.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
6   |
EACH |
200.00 |
1,200.00 |
150.00 |
900.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
EACH |
200.00 |
800.00 |
150.00 |
600.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
23,000.00 |
23,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
5,000.00 |
5,000.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| S-001 |
dynamic message sign unit
|
2   |
EACH |
7,000.00 |
14,000.00 |
10,000.00 |
20,000.00 |
|
|
|
|
| S-002 |
cleaning existing ditches
|
868   |
LNFT |
4.50 |
3,906.00 |
18.00 |
15,624.00 |
|
|
|
|
| S-003 |
rip rap (dotd furnished)
|
125.0 |
TON |
15.00 |
1,875.00 |
27.00 |
3,375.00 |
|
|
|
|
| S-922 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
4,000   |
LNFT |
1.50 |
6,000.00 |
2.00 |
8,000.00 |
|
|
|
|
| S-923 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
3,000   |
LNFT |
1.50 |
4,500.00 |
2.00 |
6,000.00 |
|
|
|
|
| S-927 |
sawcuts in asphaltic concrete lifts
|
7,000   |
LNFT |
2.50 |
17,500.00 |
2.00 |
14,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
533,138.20 |
|
697,732.42 |
|
|
|
|
|