Letting of 2/22/2006 LA DOTD Headquarters


REBID
go back
Go Back
DBE GOAL FED
Lead Project: 829-32-0008
Parish: LAFOURCHE
Routes: LA 1
Description: LA 1 OVER BAYOU LAFOURCHE AT LEEVILLE, PHASE 1C - MAIN SPANS
Type Const: welded steel plate girder spans and related work.
Estimated Construction Cost: $15,226,179.38
 
RankLicenseBidderConstruction Bid
1 01029 TRAYLOR BRO/MASSMAN CONST A JT VENT $20,203,759.00
2 07779 ROSIEK CONSTRUCTION CO INC $20,892,710.96
 
Item Number Item Description Quantity Unit of Measure - 1 -
TRAYLOR BRO/MASSMAN CONST A JT VENT
- 2 -
ROSIEK CONSTRUCTION CO INC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
713-01 temporary signs and barricades lump      LUMP 1,000.00 1,000.00 10,000.00 10,000.00        
727-01 mobilization lump      LUMP 2,000,000.00 2,000,000.00 2,080,000.00 2,080,000.00        
730-09 electrical system lump      LUMP 80,000.00 80,000.00 80,000.00 80,000.00        
744-01 traffic control management lump      LUMP 1,000.00 1,000.00 150,000.00 150,000.00        
805-02-E class a(m) concrete (piers) 1,271.18   CUYD 1,800.00 2,288,124.00 1,772.00 2,252,530.96        
805-03 class aa concrete 1,177.65   CUYD 1,100.00 1,295,415.00 1,600.00 1,884,240.00        
806-01 deformed reinforcing steel 597,213      LB 1.00 597,213.00 1.00 597,213.00        
807-06 structural metalwork lump      LUMP 3,278,000.00 3,278,000.00 4,100,000.00 4,100,000.00        
810-01-A concrete railing (barrier) 1,740.00   LNFT 35.00 60,900.00 73.00 127,020.00        
S-007 resident engineers, housing allowance lump      LUMP 60,000.00 60,000.00 54,000.00 54,000.00        
S-106 modular expansion joint (9 1/2") 80.00   LNFT 1,350.00 108,000.00 1,000.00 80,000.00        
S-109 clearance gauges 2      EACH 5,000.00 10,000.00 5,000.00 10,000.00        
S-112 construction site survey lump      LUMP 1,000.00 1,000.00 230,000.00 230,000.00        
S-113 vibration monitoring lump      LUMP 45,000.00 45,000.00 50,000.00 50,000.00        
S-115 pot bearing (expansion) 8      EACH 12,000.00 96,000.00 2,500.00 20,000.00        
S-116 pot bearing (fixed) 8      EACH 14,000.00 112,000.00 3,500.00 28,000.00        
 SUBTOTAL GENERAL       10,033,652.00   11,753,003.96        
                       
ALTERNATE D precast concrete piles                    
                       
ALTERNATE D1 precast concrete piles (54") (alt. d1)                    
804-01-I-01 precast concrete piles (54") (alt. d1) 9,752.0    LNFT 0.00 0.00 0.00 0.00        
805-02-D-01 class a(m) concrete (footings) (alt. d1) 3,012.01   CUYD 0.00 0.00 0.00 0.00        
806-01-A deformed reinforcing steel (alt. d1) 519,664      LB 0.00 0.00 0.00 0.00        
                       
ALTERNATE D2 precast concrete piles (30") (alt. d2)                    
804-01-G-01 precast concrete piles (30") (alt. d2) 20,608.0    LNFT 250.00 5,152,000.00 200.00 4,121,600.00        
805-02-D-02 class a(m) concrete (footings) (alt. d2) 2,302.67   CUYD 2,000.00 4,605,340.00 2,000.00 4,605,340.00        
806-01-B deformed reinforcing steel (alt. d2) 412,767      LB 1.00 412,767.00 1.00 412,767.00        
 SUBTOTAL ALT D2       10,170,107.00   9,139,707.00        
                       
 CONTRACTOR TOTAL       20,203,759.00   20,892,710.96        