Letting of 2/22/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 819-10-0009
Parish: E FELICIANA
Routes: LA 412, LA 955
Description: LA 964 - LA 19
Type Const: grading, cold planing asphaltic pavement, lime treatment, cement treated base course,
superpave asphaltic conc pvmt and related work.
Estimated Construction Cost: $2,771,352.25
 
RankLicenseBidderConstruction Bid
1 00481 COASTAL BRIDGE CO., L.L.C. $2,378,642.70
2 00849 F.G. SULLIVAN, JR. CONTRACTOR LLC $2,778,437.54
3 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $3,086,278.25
4 00046 BARBER BROS. CONTRACTING CO., L.L.C $3,400,380.91
 
Item Number Item Description Quantity Unit of Measure - 1 -
COASTAL BRIDGE CO., L.L.C.
- 2 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 4 -
BARBER BROS. CONTRACTING CO., L.L.C
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 117      SQYD 13.00 1,521.00 10.00 1,170.00 35.00 4,095.00 25.00 2,925.00
202-02-H removal of guard rail 1,264      LNFT 5.50 6,952.00 5.00 6,320.00 4.00 5,056.00 5.00 6,320.00
202-02-I removal of existing excess asphatlic patch material 587      SQYD 15.00 8,805.00 10.00 5,870.00 10.00 5,870.00 10.00 5,870.00
203-08 borrow (vehicular measurement) 4,426      CUYD 1.00 4,426.00 9.00 39,834.00 13.00 57,538.00 18.00 79,668.00
203-08-A borrow (vehicular meas.)(selected soils) 10,180      CUYD 1.00 10,180.00 9.00 91,620.00 14.00 142,520.00 15.00 152,700.00
204-05-A temporary sediment check dams (hay) 60      EACH 10.00 600.00 85.00 5,100.00 100.00 6,000.00 200.00 12,000.00
204-06 temporary silt fencing 71,702      LNFT 0.10 7,170.20 1.00 71,702.00 2.00 143,404.00 1.50 107,553.00
304-01 lime 1,014.73   TON 130.00 131,914.90 125.00 126,841.25 120.00 121,767.60 175.00 177,577.75
304-04-D lime treatment (type d) (12" thick) 90,956      SQYD 1.50 136,434.00 4.55 413,849.80 3.25 295,607.00 3.00 272,868.00
401-02 aggregate surface course (adjusted vehicular
measurement)
2,252      CUYD 40.00 90,080.00 15.00 33,780.00 29.00 65,308.00 25.00 56,300.00
502-01 superpave asphaltic concrete 16,747.7    TON 42.00 703,403.40 50.00 837,385.00 58.00 971,366.60 60.00 1,004,862.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,125.5    TON 95.00 106,922.50 50.00 56,275.00 110.00 123,805.00 85.00 95,667.50
509-01-A cold planing asphaltic pavement (2" average depth) 87,000      SQYD 4.85 421,950.00 1.50 130,500.00 1.28 111,360.00 2.25 195,750.00
509-02 contractor retained reclaimed asphaltic pavement - 2,175      CUYD 1.00 - 2,175.00 0.01 - 21.75 0.10 - 217.50 0.00 0.00
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 520.0    LNFT 30.00 15,600.00 28.00 14,560.00 32.00 16,640.00 50.00 26,000.00
704-03 blocked out guard rail 650.0    LNFT 17.00 11,050.00 16.00 10,400.00 19.00 12,350.00 25.00 16,250.00
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 44.50 8,900.00 42.00 8,400.00 63.00 12,600.00 65.00 13,000.00
704-11-A guard rail end treatment (flared) 8      EACH 2,000.00 16,000.00 1,900.00 15,200.00 2,000.00 16,000.00 2,500.00 20,000.00
713-01 temporary signs & barricades lump      LUMP 20,000.00 20,000.00 75,000.00 75,000.00 14,000.00 14,000.00 30,000.00 30,000.00
713-03-E temporary pavement markings (24" width) 132      LNFT 1.50 198.00 0.70 92.40 0.69 91.08 2.00 264.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
20.370  MILE 300.00 6,111.00 500.00 10,185.00 140.00 2,851.80 350.00 7,129.50
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
16.686  MILE 340.00 5,673.24 10.00 166.86 250.00 4,171.50 360.00 6,006.96
713-05-A temporary pavement markings (solid line)(4" width) 39.568  MILE 1.00 39.56 10.00 395.68 1.00 39.57 600.00 23,740.80
713-06-D temporary pavement legends and symbols (rr crossing) 6      EACH 160.00 960.00 50.00 300.00 200.00 1,200.00 200.00 1,200.00
722-02 project site laboratory (equipped) 1      EACH 4,000.00 4,000.00 10,000.00 10,000.00 13,000.00 13,000.00 15,000.00 15,000.00
727-01 mobilization lump      LUMP 177,000.00 177,000.00 150,000.00 150,000.00 300,000.00 300,000.00 200,000.00 200,000.00
729-16-B object marker assembly (type 2) 20      EACH 80.00 1,600.00 45.00 900.00 60.00 1,200.00 80.00 1,600.00
729-16-C object marker assembly (type 3) 8      EACH 72.00 576.00 70.00 560.00 80.00 640.00 90.00 720.00
731-02 reflectorized raised pavement markers 897      EACH 5.60 5,023.20 6.00 5,382.00 5.00 4,485.00 6.00 5,382.00
732-01-E plastic pavement striping (24" width) 44      LNFT 3.20 140.80 4.00 176.00 2.50 110.00 3.50 154.00
732-02-A plastic pavement striping (solid line) (4" width) 17.716  MILE 2,125.00 37,646.50 2,400.00 42,518.40 2,000.00 35,432.00 2,500.00 44,290.00
732-03-A plastic pavement striping (broken line)(4" width) 5.562  MILE 1,000.00 5,562.00 1,200.00 6,674.40 800.00 4,449.60 1,200.00 6,674.40
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 500.00 1,000.00 600.00 1,200.00 400.00 800.00 600.00 1,200.00
735-01 mailboxes 31      EACH 1.00 31.00 5.00 155.00 15.00 465.00 6.00 186.00
735-02 mailbox supports (single) 29      EACH 150.00 4,350.00 115.00 3,335.00 200.00 5,800.00 150.00 4,350.00
735-03 mailbox supports (double) 1      EACH 300.00 300.00 190.00 190.00 600.00 600.00 250.00 250.00
739-01 hydro-seeding 8.23   ACRE 1,000.00 8,230.00 1,050.00 8,641.50 1,200.00 9,876.00 1,000.00 8,230.00
740-01 construction layout lump      LUMP 20,000.00 20,000.00 64,000.00 64,000.00 33,000.00 33,000.00 50,000.00 50,000.00
744-01 traffic control management lump      LUMP 15,000.00 15,000.00 65,000.00 65,000.00 10,000.00 10,000.00 100,000.00 100,000.00
S-001 cement treated base course (12 in depth) 90,956      SQYD 4.15 377,467.40 5.00 454,780.00 5.75 522,997.00 7.00 636,692.00
S-002 cleaning existing ditches 1,000      LNFT 8.00 8,000.00 10.00 10,000.00 10.00 10,000.00 12.00 12,000.00
                       
 CONTRACTOR TOTAL       2,378,642.70   2,778,437.54   3,086,278.25   3,400,380.91

Error processing SSI file