| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COASTAL BRIDGE CO., L.L.C. |
- 2 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 4 - BARBER BROS. CONTRACTING CO., L.L.C |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
117   |
SQYD |
13.00 |
1,521.00 |
10.00 |
1,170.00 |
35.00 |
4,095.00 |
25.00 |
2,925.00 |
| 202-02-H |
removal of guard rail
|
1,264   |
LNFT |
5.50 |
6,952.00 |
5.00 |
6,320.00 |
4.00 |
5,056.00 |
5.00 |
6,320.00 |
| 202-02-I |
removal of existing excess asphatlic patch material
|
587   |
SQYD |
15.00 |
8,805.00 |
10.00 |
5,870.00 |
10.00 |
5,870.00 |
10.00 |
5,870.00 |
| 203-08 |
borrow (vehicular measurement)
|
4,426   |
CUYD |
1.00 |
4,426.00 |
9.00 |
39,834.00 |
13.00 |
57,538.00 |
18.00 |
79,668.00 |
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
10,180   |
CUYD |
1.00 |
10,180.00 |
9.00 |
91,620.00 |
14.00 |
142,520.00 |
15.00 |
152,700.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
60   |
EACH |
10.00 |
600.00 |
85.00 |
5,100.00 |
100.00 |
6,000.00 |
200.00 |
12,000.00 |
| 204-06 |
temporary silt fencing
|
71,702   |
LNFT |
0.10 |
7,170.20 |
1.00 |
71,702.00 |
2.00 |
143,404.00 |
1.50 |
107,553.00 |
| 304-01 |
lime
|
1,014.73 |
TON |
130.00 |
131,914.90 |
125.00 |
126,841.25 |
120.00 |
121,767.60 |
175.00 |
177,577.75 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
90,956   |
SQYD |
1.50 |
136,434.00 |
4.55 |
413,849.80 |
3.25 |
295,607.00 |
3.00 |
272,868.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,252   |
CUYD |
40.00 |
90,080.00 |
15.00 |
33,780.00 |
29.00 |
65,308.00 |
25.00 |
56,300.00 |
| 502-01 |
superpave asphaltic concrete
|
16,747.7 |
TON |
42.00 |
703,403.40 |
50.00 |
837,385.00 |
58.00 |
971,366.60 |
60.00 |
1,004,862.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,125.5 |
TON |
95.00 |
106,922.50 |
50.00 |
56,275.00 |
110.00 |
123,805.00 |
85.00 |
95,667.50 |
| 509-01-A |
cold planing asphaltic pavement (2" average depth)
|
87,000   |
SQYD |
4.85 |
421,950.00 |
1.50 |
130,500.00 |
1.28 |
111,360.00 |
2.25 |
195,750.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,175   |
CUYD |
1.00 |
- 2,175.00 |
0.01 |
- 21.75 |
0.10 |
- 217.50 |
0.00 |
0.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
520.0 |
LNFT |
30.00 |
15,600.00 |
28.00 |
14,560.00 |
32.00 |
16,640.00 |
50.00 |
26,000.00 |
| 704-03 |
blocked out guard rail
|
650.0 |
LNFT |
17.00 |
11,050.00 |
16.00 |
10,400.00 |
19.00 |
12,350.00 |
25.00 |
16,250.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
44.50 |
8,900.00 |
42.00 |
8,400.00 |
63.00 |
12,600.00 |
65.00 |
13,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
2,000.00 |
16,000.00 |
1,900.00 |
15,200.00 |
2,000.00 |
16,000.00 |
2,500.00 |
20,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
75,000.00 |
75,000.00 |
14,000.00 |
14,000.00 |
30,000.00 |
30,000.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
132   |
LNFT |
1.50 |
198.00 |
0.70 |
92.40 |
0.69 |
91.08 |
2.00 |
264.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
20.370 |
MILE |
300.00 |
6,111.00 |
500.00 |
10,185.00 |
140.00 |
2,851.80 |
350.00 |
7,129.50 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
16.686 |
MILE |
340.00 |
5,673.24 |
10.00 |
166.86 |
250.00 |
4,171.50 |
360.00 |
6,006.96 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
39.568 |
MILE |
1.00 |
39.56 |
10.00 |
395.68 |
1.00 |
39.57 |
600.00 |
23,740.80 |
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
6   |
EACH |
160.00 |
960.00 |
50.00 |
300.00 |
200.00 |
1,200.00 |
200.00 |
1,200.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
4,000.00 |
4,000.00 |
10,000.00 |
10,000.00 |
13,000.00 |
13,000.00 |
15,000.00 |
15,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
177,000.00 |
177,000.00 |
150,000.00 |
150,000.00 |
300,000.00 |
300,000.00 |
200,000.00 |
200,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
20   |
EACH |
80.00 |
1,600.00 |
45.00 |
900.00 |
60.00 |
1,200.00 |
80.00 |
1,600.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
72.00 |
576.00 |
70.00 |
560.00 |
80.00 |
640.00 |
90.00 |
720.00 |
| 731-02 |
reflectorized raised pavement markers
|
897   |
EACH |
5.60 |
5,023.20 |
6.00 |
5,382.00 |
5.00 |
4,485.00 |
6.00 |
5,382.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
44   |
LNFT |
3.20 |
140.80 |
4.00 |
176.00 |
2.50 |
110.00 |
3.50 |
154.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.716 |
MILE |
2,125.00 |
37,646.50 |
2,400.00 |
42,518.40 |
2,000.00 |
35,432.00 |
2,500.00 |
44,290.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.562 |
MILE |
1,000.00 |
5,562.00 |
1,200.00 |
6,674.40 |
800.00 |
4,449.60 |
1,200.00 |
6,674.40 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
500.00 |
1,000.00 |
600.00 |
1,200.00 |
400.00 |
800.00 |
600.00 |
1,200.00 |
| 735-01 |
mailboxes
|
31   |
EACH |
1.00 |
31.00 |
5.00 |
155.00 |
15.00 |
465.00 |
6.00 |
186.00 |
| 735-02 |
mailbox supports (single)
|
29   |
EACH |
150.00 |
4,350.00 |
115.00 |
3,335.00 |
200.00 |
5,800.00 |
150.00 |
4,350.00 |
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
300.00 |
300.00 |
190.00 |
190.00 |
600.00 |
600.00 |
250.00 |
250.00 |
| 739-01 |
hydro-seeding
|
8.23 |
ACRE |
1,000.00 |
8,230.00 |
1,050.00 |
8,641.50 |
1,200.00 |
9,876.00 |
1,000.00 |
8,230.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
64,000.00 |
64,000.00 |
33,000.00 |
33,000.00 |
50,000.00 |
50,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
65,000.00 |
65,000.00 |
10,000.00 |
10,000.00 |
100,000.00 |
100,000.00 |
| S-001 |
cement treated base course (12 in depth)
|
90,956   |
SQYD |
4.15 |
377,467.40 |
5.00 |
454,780.00 |
5.75 |
522,997.00 |
7.00 |
636,692.00 |
| S-002 |
cleaning existing ditches
|
1,000   |
LNFT |
8.00 |
8,000.00 |
10.00 |
10,000.00 |
10.00 |
10,000.00 |
12.00 |
12,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,378,642.70 |
|
2,778,437.54 |
|
3,086,278.25 |
|
3,400,380.91 |
|