| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JACK B. HARPER CONTRACTOR, INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| S-001 |
furnish and install fender panel
|
15   |
EACH |
940.00 |
14,100.00 |
|
|
|
|
|
|
| S-002 |
furnish and install hex foam cartridge, type
80 (36-09-80) |
90   |
EACH |
795.00 |
71,550.00 |
|
|
|
|
|
|
| S-003 |
furnish and install hex foam cartridge, type
81 (35-09-81) |
16   |
EACH |
795.00 |
12,720.00 |
|
|
|
|
|
|
| S-004 |
furnish and install hex foam cartridge, type
82 (35-09-82) |
24   |
EACH |
985.00 |
23,640.00 |
|
|
|
|
|
|
| S-005 |
furnish and install safety flex belt (39-20-001w)
|
5   |
EACH |
1,510.00 |
7,550.00 |
|
|
|
|
|
|
| S-006 |
furnish and install support legs (27-14-921)
|
10   |
EACH |
29.00 |
290.00 |
|
|
|
|
|
|
| S-007 |
furnish and install cartridge support brackets
(27-10-xxx) |
26   |
EACH |
25.00 |
650.00 |
|
|
|
|
|
|
| S-008 |
furnish and install front cable anchor (39-20-01)
|
4   |
EACH |
235.00 |
940.00 |
|
|
|
|
|
|
| S-009 |
furnish and install gripper plates (27-10-221)
|
4   |
EACH |
94.00 |
376.00 |
|
|
|
|
|
|
| S-010 |
furnish and install front anchor pins (27-42-201)
|
10   |
EACH |
13.00 |
130.00 |
|
|
|
|
|
|
| S-011 |
furnish and install front panel hinge leaf (27-39-241)
|
10   |
EACH |
44.00 |
440.00 |
|
|
|
|
|
|
| S-012 |
furnish and install fender panel stabilizer (27-38-151)
|
5   |
EACH |
131.00 |
655.00 |
|
|
|
|
|
|
| S-013 |
furnish and install diaphragm (1 thru 2 bay)(39-00-12)
|
8   |
EACH |
525.00 |
4,200.00 |
|
|
|
|
|
|
| S-014 |
furnish and install diaphragm (3 thru 5 bay)(39-00-35)
|
2   |
EACH |
625.00 |
1,250.00 |
|
|
|
|
|
|
| S-015 |
furnish and install diaphragm (6 thru 8 bay)(39-00-68)
|
2   |
EACH |
750.00 |
1,500.00 |
|
|
|
|
|
|
| S-016 |
furnish and install diaphragm (9 thru 10 bay)
(39-00-910) |
2   |
EACH |
800.00 |
1,600.00 |
|
|
|
|
|
|
| S-017 |
repositioning of vehicular impact attenuator (hex foam
sandwich) |
15   |
EACH |
1,890.00 |
28,350.00 |
|
|
|
|
|
|
| S-018 |
stcckpile inventory hex foam sandwich)
|
1   |
EACH |
9,229.00 |
9,229.00 |
|
|
|
|
|
|
| S-019 |
furnish and install fender panel assembly, quad beam
(p/n 3540040) |
6   |
EACH |
230.00 |
1,380.00 |
|
|
|
|
|
|
| S-020 |
furnish and install fender panel assembly, quad beam
f/69"/90"(p/n 3540370) |
3   |
EACH |
273.00 |
819.00 |
|
|
|
|
|
|
| S-021 |
furnish and install cartridge assembly, type i qg(p/n
3540010) |
20   |
EACH |
294.00 |
5,880.00 |
|
|
|
|
|
|
| S-022 |
furnish and install cartridge assembly, type ii qg(p/n
3540020) |
20   |
EACH |
297.00 |
5,940.00 |
|
|
|
|
|
|
| S-023 |
furnish and install diaphragm assembly, qb/24" (p/n
3540071) |
2   |
EACH |
347.00 |
694.00 |
|
|
|
|
|
|
| S-024 |
furnish and install diaphragm assembly, qb 30" (p/n
3540072) |
2   |
EACH |
347.00 |
694.00 |
|
|
|
|
|
|
| S-025 |
furnish and install diaphragm assembly, qb 36" (p/n
3540073) |
4   |
EACH |
347.00 |
1,388.00 |
|
|
|
|
|
|
| S-026 |
furnish and install diaphragm assembly, qb 69/90
|
2   |
EACH |
399.00 |
798.00 |
|
|
|
|
|
|
| S-027 |
furnish and install nose assembly, gray qg (p/n
3540050) |
6   |
EACH |
263.00 |
1,578.00 |
|
|
|
|
|
|
| S-028 |
furnish and install nose assembly, gray qg f 69"/90"
(p/n 3540131) |
4   |
EACH |
252.00 |
1,008.00 |
|
|
|
|
|
|
| S-029 |
furnish and install end shoe, quad beam (p/n 3510150)
|
2   |
EACH |
142.00 |
284.00 |
|
|
|
|
|
|
| S-030 |
furnish and replace transition panel assembly 4"
offset left (p/n 354018l) |
2   |
EACH |
263.00 |
526.00 |
|
|
|
|
|
|
| S-031 |
furnish and install transition panel assembly 4"
offset right (p/n 354018r) |
2   |
EACH |
263.00 |
526.00 |
|
|
|
|
|
|
| S-032 |
furnish and install panel, side f/steel & concrete
backups (p/n 2760141) |
1   |
EACH |
150.00 |
150.00 |
|
|
|
|
|
|
| S-033 |
furnish and install concrete back-up 69" (p/n 3540401)
|
1   |
EACH |
840.00 |
840.00 |
|
|
|
|
|
|
| S-034 |
furnish and install concrete back-up 90" (3540402)
|
1   |
EACH |
840.00 |
840.00 |
|
|
|
|
|
|
| S-035 |
furnish and install tension strut backup 69" (p/n
3540391) |
1   |
EACH |
840.00 |
840.00 |
|
|
|
|
|
|
| S-036 |
furnish and install tension strut backup 90" (p/n
3540392 |
1   |
EACH |
840.00 |
840.00 |
|
|
|
|
|
|
| S-037 |
furnish and install backup assembly tension strut 24"
(p/n 3540031) |
1   |
EACH |
630.00 |
630.00 |
|
|
|
|
|
|
| S-038 |
furnish and install backup assembly tension strut 30"
(p/n 3540032) |
1   |
EACH |
630.00 |
630.00 |
|
|
|
|
|
|
| S-039 |
furnish and install backup assembly tension strut 36"
(p/n 3540033) |
1   |
EACH |
630.00 |
630.00 |
|
|
|
|
|
|
| S-040 |
furnish and install backup assembly concrete 24" (p/n
3540141) |
1   |
EACH |
525.00 |
525.00 |
|
|
|
|
|
|
| S-041 |
furnish and install backup assembly concrete 30" (p/n
3540142) |
1   |
EACH |
525.00 |
525.00 |
|
|
|
|
|
|
| S-042 |
furnish and install backup assembly concrete 36" (p/n
3540143) |
1   |
EACH |
525.00 |
525.00 |
|
|
|
|
|
|
| S-043 |
furnish and install deflector retrofit
assembly,f/con.back-up,qg (p/n 3540200) |
1   |
EACH |
240.00 |
240.00 |
|
|
|
|
|
|
| S-044 |
furnish and install monorail assembly (p/n 3540060)
|
1   |
EACH |
861.00 |
861.00 |
|
|
|
|
|
|
| S-045 |
furnish and install monorail, 1-bay,qg,g (p/n 2760051)
|
1   |
EACH |
189.00 |
189.00 |
|
|
|
|
|
|
| S-046 |
furnish and install monorail, 2-bay, qg,g (p/n2760061))
|
1   |
EACH |
336.00 |
336.00 |
|
|
|
|
|
|
| S-047 |
furnish and install monorail, 3-bay, qg,g (p/n 2760071)
|
1   |
EACH |
441.00 |
441.00 |
|
|
|
|
|
|
| S-048 |
furnish and install endcap, monorail qg,g (p/n 2760041)
|
1   |
EACH |
42.00 |
42.00 |
|
|
|
|
|
|
| S-049 |
repositioning of vehicular impact attenuator
(quadguard) |
6   |
EACH |
1,155.00 |
6,930.00 |
|
|
|
|
|
|
| S-050 |
stockpile inventory (quadguard)
|
1   |
EACH |
7,550.00 |
7,550.00 |
|
|
|
|
|
|
| S-051 |
furnish and install hazard reflector
|
12   |
EACH |
99.00 |
1,188.00 |
|
|
|
|
|
|
| S-052 |
maintenance of traffic
|
15   |
DAY |
1,680.00 |
25,200.00 |
|
|
|
|
|
|
| S-053 |
mobilization (impact) (orleans and jefferson parish
area) |
15   |
EACH |
1,680.00 |
25,200.00 |
|
|
|
|
|
|
| S-054 |
mobilization (contract wide)(orleans and jefferson
parish area) |
1   |
EACH |
71,190.00 |
71,190.00 |
|
|
|
|
|
|
| S-055 |
repair of concrete back-up wall
|
1   |
EACH |
275.00 |
275.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
347,302.00 |
|
|
|
|
|
|