Lead Project: 737-99-0788
Parish: ORLEANS, JEFFERSON
Routes: US 90
Description: IMPACT ATTENUATOR MAINTENANCE FOR CRESENT CITY CONNECTION
Type Const: repair or replacement of existing guardrail energy absorbing terminals(g.r.e.a.t.
)& hex foam sandwhich vehicular impact attenuators and related work.
Estimated Construction Cost: $296,304.00
 
RankLicenseBidderConstruction Bid
1 27043 JACK B. HARPER CONTRACTOR, INC. $347,302.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
JACK B. HARPER CONTRACTOR, INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
S-001 furnish and install fender panel 15      EACH 940.00 14,100.00            
S-002 furnish and install hex foam cartridge, type
80 (36-09-80)
90      EACH 795.00 71,550.00            
S-003 furnish and install hex foam cartridge, type
81 (35-09-81)
16      EACH 795.00 12,720.00            
S-004 furnish and install hex foam cartridge, type
82 (35-09-82)
24      EACH 985.00 23,640.00            
S-005 furnish and install safety flex belt (39-20-001w) 5      EACH 1,510.00 7,550.00            
S-006 furnish and install support legs (27-14-921) 10      EACH 29.00 290.00            
S-007 furnish and install cartridge support brackets
(27-10-xxx)
26      EACH 25.00 650.00            
S-008 furnish and install front cable anchor (39-20-01) 4      EACH 235.00 940.00            
S-009 furnish and install gripper plates (27-10-221) 4      EACH 94.00 376.00            
S-010 furnish and install front anchor pins (27-42-201) 10      EACH 13.00 130.00            
S-011 furnish and install front panel hinge leaf (27-39-241) 10      EACH 44.00 440.00            
S-012 furnish and install fender panel stabilizer (27-38-151) 5      EACH 131.00 655.00            
S-013 furnish and install diaphragm (1 thru 2 bay)(39-00-12) 8      EACH 525.00 4,200.00            
S-014 furnish and install diaphragm (3 thru 5 bay)(39-00-35) 2      EACH 625.00 1,250.00            
S-015 furnish and install diaphragm (6 thru 8 bay)(39-00-68) 2      EACH 750.00 1,500.00            
S-016 furnish and install diaphragm (9 thru 10 bay)
(39-00-910)
2      EACH 800.00 1,600.00            
S-017 repositioning of vehicular impact attenuator (hex foam
sandwich)
15      EACH 1,890.00 28,350.00            
S-018 stcckpile inventory hex foam sandwich) 1      EACH 9,229.00 9,229.00            
S-019 furnish and install fender panel assembly, quad beam
(p/n 3540040)
6      EACH 230.00 1,380.00            
S-020 furnish and install fender panel assembly, quad beam
f/69"/90"(p/n 3540370)
3      EACH 273.00 819.00            
S-021 furnish and install cartridge assembly, type i qg(p/n
3540010)
20      EACH 294.00 5,880.00            
S-022 furnish and install cartridge assembly, type ii qg(p/n
3540020)
20      EACH 297.00 5,940.00            
S-023 furnish and install diaphragm assembly, qb/24" (p/n
3540071)
2      EACH 347.00 694.00            
S-024 furnish and install diaphragm assembly, qb 30" (p/n
3540072)
2      EACH 347.00 694.00            
S-025 furnish and install diaphragm assembly, qb 36" (p/n
3540073)
4      EACH 347.00 1,388.00            
S-026 furnish and install diaphragm assembly, qb 69/90 2      EACH 399.00 798.00            
S-027 furnish and install nose assembly, gray qg (p/n
3540050)
6      EACH 263.00 1,578.00            
S-028 furnish and install nose assembly, gray qg f 69"/90"
(p/n 3540131)
4      EACH 252.00 1,008.00            
S-029 furnish and install end shoe, quad beam (p/n 3510150) 2      EACH 142.00 284.00            
S-030 furnish and replace transition panel assembly 4"
offset left (p/n 354018l)
2      EACH 263.00 526.00            
S-031 furnish and install transition panel assembly 4"
offset right (p/n 354018r)
2      EACH 263.00 526.00            
S-032 furnish and install panel, side f/steel & concrete
backups (p/n 2760141)
1      EACH 150.00 150.00            
S-033 furnish and install concrete back-up 69" (p/n 3540401) 1      EACH 840.00 840.00            
S-034 furnish and install concrete back-up 90" (3540402) 1      EACH 840.00 840.00            
S-035 furnish and install tension strut backup 69" (p/n
3540391)
1      EACH 840.00 840.00            
S-036 furnish and install tension strut backup 90" (p/n
3540392
1      EACH 840.00 840.00            
S-037 furnish and install backup assembly tension strut 24"
(p/n 3540031)
1      EACH 630.00 630.00            
S-038 furnish and install backup assembly tension strut 30"
(p/n 3540032)
1      EACH 630.00 630.00            
S-039 furnish and install backup assembly tension strut 36"
(p/n 3540033)
1      EACH 630.00 630.00            
S-040 furnish and install backup assembly concrete 24" (p/n
3540141)
1      EACH 525.00 525.00            
S-041 furnish and install backup assembly concrete 30" (p/n
3540142)
1      EACH 525.00 525.00            
S-042 furnish and install backup assembly concrete 36" (p/n
3540143)
1      EACH 525.00 525.00            
S-043 furnish and install deflector retrofit
assembly,f/con.back-up,qg (p/n 3540200)
1      EACH 240.00 240.00            
S-044 furnish and install monorail assembly (p/n 3540060) 1      EACH 861.00 861.00            
S-045 furnish and install monorail, 1-bay,qg,g (p/n 2760051) 1      EACH 189.00 189.00            
S-046 furnish and install monorail, 2-bay, qg,g (p/n2760061)) 1      EACH 336.00 336.00            
S-047 furnish and install monorail, 3-bay, qg,g (p/n 2760071) 1      EACH 441.00 441.00            
S-048 furnish and install endcap, monorail qg,g (p/n 2760041) 1      EACH 42.00 42.00            
S-049 repositioning of vehicular impact attenuator
(quadguard)
6      EACH 1,155.00 6,930.00            
S-050 stockpile inventory (quadguard) 1      EACH 7,550.00 7,550.00            
S-051 furnish and install hazard reflector 12      EACH 99.00 1,188.00            
S-052 maintenance of traffic 15      DAY 1,680.00 25,200.00            
S-053 mobilization (impact) (orleans and jefferson parish
area)
15      EACH 1,680.00 25,200.00            
S-054 mobilization (contract wide)(orleans and jefferson
parish area)
1      EACH 71,190.00 71,190.00            
S-055 repair of concrete back-up wall 1      EACH 275.00 275.00            
                       
 CONTRACTOR TOTAL       347,302.00            