Lead Project: 713-52-0103
Parish: ST TAMMANY
Routes:
Description: HOLLY DRIVE BRIDGE OVER LATERAL CREEK
Type Const: precast reinforced concrete box culverts, superpave asphaltic concrete and realted
work.
Estimated Construction Cost: $148,895.75
 
RankLicenseBidderConstruction Bid
1 25088 RCS CONTRACTORS, INC. $224,662.99
2 36961 CYCLE CONSTRUCTION CO. L.L.C. $341,642.00
 32044 QUALITY DESIGN & CONSTRUCTION, INC.IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
RCS CONTRACTORS, INC.
- 2 -
CYCLE CONSTRUCTION CO. L.L.C.

QUALITY DESIGN & CONSTRUCTION, INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 10,000.00 10,000.00 5,200.00 5,200.00 5,250.00 5,250.00    
202-02-A-01 removal of bridges(sta. 1 +160; 9.00 m x 7.30 m timber
bridge)
1      ea 5,000.00 5,000.00 12,600.00 12,600.00 5,250.00 5,250.00    
203-06 excavation & embankment lump      lump 10,000.00 10,000.00 11,200.00 11,200.00 12,000.00 12,000.00    
204-02 temporary hay or straw bales 40      ea 7.00 280.00 15.00 600.00 6.70 268.00    
204-05-A temporary sediment check dams (hay) 4      ea 75.00 300.00 200.00 800.00 103.00 412.00    
204-06 temporary silt fencing 100      ln m 6.52 652.00 10.00 1,000.00 4.60 460.00    
302-01-A class ii base course (stone or rpccp) 38.3    cu m 75.00 2,872.50 250.00 9,575.00 115.00 4,404.50    
502-01 superpave asphaltic concrete 35.0    Mg 102.85 3,599.75 250.00 8,750.00 360.50 12,617.50    
701-05-G-01 side drain pipe (450 mm)(erosion) 15.0    ln m 153.00 2,295.00 350.00 5,250.00 195.00 2,925.00    
711-01-C riprap (15 kg,360mm thick) 32      sq m 54.00 1,728.00 100.00 3,200.00 71.50 2,288.00    
711-04 geotextile fabric 32      sq m 2.00 64.00 4.00 128.00 5.00 160.00    
713-01 temporary signs & barricades lump      lump 7,500.00 7,500.00 8,500.00 8,500.00 13,800.00 13,800.00    
726-01 bedding material 56.2    cu m 50.00 2,810.00 120.00 6,744.00 84.50 4,748.90    
727-01 mobilization lump      lump 10,400.00 10,400.00 44,100.00 44,100.00 10,300.00 10,300.00    
729-16-B object marker assembly (type 2) 4      ea 100.00 400.00 100.00 400.00 87.60 350.40    
740-01 construction layout lump      lump 5,000.00 5,000.00 4,000.00 4,000.00 3,090.00 3,090.00    
805-01-B class a concrete (box culvert headwalls) 48.07   cu m 877.50 42,181.42 1,500.00 72,105.00 1,083.00 52,059.81    
805-12-X-01 reinforced concrete box culverts (3000 mm x 3000 mm)
(precast only, c1433)
24.00   ln m 4,873.43 116,962.32 5,600.00 134,400.00 4,983.00 119,592.00    
806-01 deformed reinforcing steel 2,618      kg 1.00 2,618.00 5.00 13,090.00 2.30 6,021.40    
                       
 CONTRACTOR TOTAL       224,662.99   341,642.00   IRREGULAR    