| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - C W & W CONTRACTORS, INC. |
- 2 - KEY CONSTRUCTORS, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta.1+13.56;24.20' wide x 77.45'long
timber bridge) |
1   |
EACH |
15,000.00 |
15,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-A-02 |
removal of bridge(sta.4+98.71;31.50' wide x 59.06'long
timber bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-I |
removal of 120" cmp
|
1   |
EACH |
5,000.00 |
5,000.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
25,000.00 |
25,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
69   |
EACH |
10.00 |
690.00 |
10.00 |
690.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
235   |
LNFT |
8.00 |
1,880.00 |
6.00 |
1,410.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
125.00 |
1,000.00 |
250.00 |
2,000.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,101   |
LNFT |
3.00 |
3,303.00 |
3.00 |
3,303.00 |
|
|
|
|
| 302-01 |
class ii base course
|
89.1 |
CUYD |
75.00 |
6,682.50 |
120.00 |
10,692.00 |
|
|
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
187.6 |
CUYD |
80.00 |
15,008.00 |
60.00 |
11,256.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
69.7 |
TON |
200.00 |
13,940.00 |
200.00 |
13,940.00 |
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
32   |
LNFT |
50.00 |
1,600.00 |
45.00 |
1,440.00 |
|
|
|
|
| 701-05-N |
side drain pipe (42")
|
40   |
LNFT |
75.00 |
3,000.00 |
100.00 |
4,000.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
150.0 |
LNFT |
70.00 |
10,500.00 |
55.00 |
8,250.00 |
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
150.0 |
LNFT |
50.00 |
7,500.00 |
40.00 |
6,000.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,200.00 |
4,400.00 |
1,750.00 |
3,500.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb,14" thick )
|
578   |
SQYD |
65.00 |
37,570.00 |
30.00 |
17,340.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
578   |
SQYD |
3.00 |
1,734.00 |
2.50 |
1,445.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
13,000.00 |
13,000.00 |
16,500.00 |
16,500.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
45,000.00 |
45,000.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
14   |
EACH |
85.00 |
1,190.00 |
70.00 |
980.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
2,517   |
LNFT |
55.00 |
138,435.00 |
48.00 |
120,816.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
250.00 |
500.00 |
10,000.00 |
20,000.00 |
|
|
|
|
| 805-10-A |
bridge superstructure & substructure(28' roadway,
90 degree crossing, cast-in-place) |
6   |
SPAN |
24,500.00 |
147,000.00 |
30,000.00 |
180,000.00 |
|
|
|
|
| 805-10-B |
bridge superstructure & substructure(28' roadway,
90 degree crossing) |
4   |
SPAN |
21,000.00 |
84,000.00 |
23,000.00 |
92,000.00 |
|
|
|
|
| S-101 |
concrete approach slabs(28' roadway, 90 degree
crossing,w/out asphalt) |
4   |
EACH |
7,500.00 |
30,000.00 |
7,500.00 |
30,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
657,932.50 |
|
728,562.00 |
|
|
|
|
|