DBE GOAL FED
Lead Project: 713-33-0106
Parish: MADISON
Routes:
Description: WALNUT AND CYPRESS BAYOU BRIDGES
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
pavement, concrete slab span bridges and related work.
Estimated Construction Cost: $518,661.15
 
RankLicenseBidderConstruction Bid
1 18546 C W & W CONTRACTORS, INC. $657,932.50
2 09476 KEY CONSTRUCTORS, INC. $728,562.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
C W & W CONTRACTORS, INC.
- 2 -
KEY CONSTRUCTORS, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 10,000.00 10,000.00 50,000.00 50,000.00        
202-01 removal of structures & obstructions lump      LUMP 10,000.00 10,000.00 5,000.00 5,000.00        
202-02-A-01 removal of bridge(sta.1+13.56;24.20' wide x 77.45'long
timber bridge)
1      EACH 15,000.00 15,000.00 3,000.00 3,000.00        
202-02-A-02 removal of bridge(sta.4+98.71;31.50' wide x 59.06'long
timber bridge)
1      EACH 10,000.00 10,000.00 3,000.00 3,000.00        
202-02-I removal of 120" cmp 1      EACH 5,000.00 5,000.00 2,000.00 2,000.00        
203-06 excavation & embankment lump      LUMP 25,000.00 25,000.00 30,000.00 30,000.00        
204-02 temporary hay or straw bales 69      EACH 10.00 690.00 10.00 690.00        
204-03 temporary slope drains 235      LNFT 8.00 1,880.00 6.00 1,410.00        
204-05-A temporary sediment check dams (hay) 8      EACH 125.00 1,000.00 250.00 2,000.00        
204-06 temporary silt fencing 1,101      LNFT 3.00 3,303.00 3.00 3,303.00        
302-01 class ii base course 89.1    CUYD 75.00 6,682.50 120.00 10,692.00        
403-01 aggregate roadway surfacing (vehicular measurement) 187.6    CUYD 80.00 15,008.00 60.00 11,256.00        
502-01 superpave asphaltic concrete 69.7    TON 200.00 13,940.00 200.00 13,940.00        
701-05-I side drain pipe (24") 32      LNFT 50.00 1,600.00 45.00 1,440.00        
701-05-N side drain pipe (42") 40      LNFT 75.00 3,000.00 100.00 4,000.00        
704-08-B guard rail transitions (double thrie beam) 150.0    LNFT 70.00 10,500.00 55.00 8,250.00        
704-09 guard rail anchor sections (turndown) 150.0    LNFT 50.00 7,500.00 40.00 6,000.00        
704-11-A guard rail end treatment (flared) 2      EACH 2,200.00 4,400.00 1,750.00 3,500.00        
711-01-C riprap (30 lb,14" thick ) 578      SQYD 65.00 37,570.00 30.00 17,340.00        
711-04 geotextile fabric 578      SQYD 3.00 1,734.00 2.50 1,445.00        
713-01 temporary signs & barricades lump      LUMP 13,000.00 13,000.00 16,500.00 16,500.00        
727-01 mobilization lump      LUMP 45,000.00 45,000.00 75,000.00 75,000.00        
729-16-C object marker assembly (type 3) 14      EACH 85.00 1,190.00 70.00 980.00        
740-01 construction layout lump      LUMP 15,000.00 15,000.00 15,000.00 15,000.00        
804-01-B precast concrete piles (14") 2,517      LNFT 55.00 138,435.00 48.00 120,816.00        
804-12 loading permanent piles 2      EACH 250.00 500.00 10,000.00 20,000.00        
805-10-A bridge superstructure & substructure(28' roadway,
90 degree crossing, cast-in-place)
6      SPAN 24,500.00 147,000.00 30,000.00 180,000.00        
805-10-B bridge superstructure & substructure(28' roadway,
90 degree crossing)
4      SPAN 21,000.00 84,000.00 23,000.00 92,000.00        
S-101 concrete approach slabs(28' roadway, 90 degree
crossing,w/out asphalt)
4      EACH 7,500.00 30,000.00 7,500.00 30,000.00        
                       
 CONTRACTOR TOTAL       657,932.50   728,562.00        