| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BEN ALLEN, INC. |
- 2 - C W & W CONTRACTORS, INC. |
- 3 - DENTON-JAMES LLC |
QUALITY DESIGN & CONSTRUCTION, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
12,000.00 |
12,000.00 |
20,000.00 |
20,000.00 |
80,000.00 |
80,000.00 |
16,789.10 |
16,789.10 |
| 202-02-A-01 |
removal of bridge(sta. 100+00,23.7' wide x 30.0' long
timber bridge with wingwalls) |
1   |
EACH |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
8,000.00 |
8,000.00 |
7,687.10 |
7,687.10 |
| 202-02-A-02 |
removal of bridge(sta. 100+00,14.8' wide x 45.0' long
timber bridge with wingwalls) |
1   |
EACH |
16,000.00 |
16,000.00 |
7,500.00 |
7,500.00 |
8,000.00 |
8,000.00 |
7,687.10 |
7,687.10 |
| 202-02-A-03 |
removal of bridge(sta.100+00 railroad tank car)
|
1   |
EACH |
4,000.00 |
4,000.00 |
7,500.00 |
7,500.00 |
7,000.00 |
7,000.00 |
11,250.00 |
11,250.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
25,000.00 |
25,000.00 |
15,000.00 |
15,000.00 |
60,000.00 |
60,000.00 |
80,337.50 |
80,337.50 |
| 204-02 |
temporary hay or straw bales
|
30   |
EACH |
FREE |
FREE |
10.00 |
300.00 |
10.00 |
300.00 |
13.20 |
396.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
FREE |
FREE |
125.00 |
1,500.00 |
100.00 |
1,200.00 |
181.50 |
2,178.00 |
| 204-06 |
temporary silt fencing
|
350   |
LNFT |
FREE |
FREE |
3.00 |
1,050.00 |
2.50 |
875.00 |
3.10 |
1,085.00 |
| 302-01 |
class ii base course
|
128.5 |
CUYD |
95.00 |
12,207.50 |
75.00 |
9,637.50 |
200.00 |
25,700.00 |
88.00 |
11,308.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
8   |
CUYD |
95.00 |
760.00 |
150.00 |
1,200.00 |
100.00 |
800.00 |
64.60 |
516.80 |
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
40.4 |
CUYD |
95.00 |
3,838.00 |
100.00 |
4,040.00 |
80.00 |
3,232.00 |
44.84 |
1,811.53 |
| 502-01 |
superpave asphaltic concrete
|
106.6 |
TON |
150.00 |
15,990.00 |
200.00 |
21,320.00 |
300.00 |
31,980.00 |
309.00 |
32,939.40 |
| 701-05-G-01 |
side drain pipe (18")(erosion)
|
36   |
LNFT |
50.00 |
1,800.00 |
50.00 |
1,800.00 |
60.00 |
2,160.00 |
43.40 |
1,562.40 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
8,000.00 |
8,000.00 |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
26,988.70 |
26,988.70 |
| 726-01 |
bedding material
|
218.6 |
CUYD |
95.00 |
20,767.00 |
90.00 |
19,674.00 |
75.00 |
16,395.00 |
153.30 |
33,511.38 |
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
65,000.00 |
65,000.00 |
68,000.00 |
68,000.00 |
16,995.00 |
16,995.00 |
| 729-16-B |
object marker assembly (type 2)
|
12   |
EACH |
75.00 |
900.00 |
150.00 |
1,800.00 |
100.00 |
1,200.00 |
78.10 |
937.20 |
| 740-01 |
construction layout
|
lump |
LUMP |
6,000.00 |
6,000.00 |
20,000.00 |
20,000.00 |
8,000.00 |
8,000.00 |
10,483.20 |
10,483.20 |
| 744-01 |
traffic control management
|
lump |
LUMP |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
2,000.00 |
2,000.00 |
11,494.30 |
11,494.30 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
73.96 |
CUYD |
1,000.00 |
73,960.00 |
900.00 |
66,564.00 |
1,200.00 |
88,752.00 |
995.20 |
73,604.99 |
| 805-12-N |
reinforced concrete box culverts (7'x 6')
|
324.0 |
LNFT |
680.00 |
220,320.00 |
900.00 |
291,600.00 |
720.00 |
233,280.00 |
731.40 |
236,973.60 |
| 806-01 |
deformed reinforcing steel
|
6,057   |
LB |
1.00 |
6,057.00 |
1.50 |
9,085.50 |
2.00 |
12,114.00 |
2.20 |
13,325.40 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
457,599.50 |
|
594,571.00 |
|
688,988.00 |
|
IRREGULAR |
|