Letting of 2/22/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-30-0124
Parish: LASALLE
Routes:
Description: SEARCY-EDEN RD, STUMP RD OVER DRY CREEK, & CHURCH ST BRIDGES
Type Const: drainage structures, class ii base course, superpave asphaltic concrete pavement,
and related work.
Estimated Construction Cost: $374,971.15
 
RankLicenseBidderConstruction Bid
1 23112 BEN ALLEN, INC. $457,599.50
2 18546 C W & W CONTRACTORS, INC. $594,571.00
3 39462 DENTON-JAMES LLC $688,988.00
 32044 QUALITY DESIGN & CONSTRUCTION, INC.IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
BEN ALLEN, INC.
- 2 -
C W & W CONTRACTORS, INC.
- 3 -
DENTON-JAMES LLC

QUALITY DESIGN & CONSTRUCTION, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 12,000.00 12,000.00 20,000.00 20,000.00 80,000.00 80,000.00 16,789.10 16,789.10
202-02-A-01 removal of bridge(sta. 100+00,23.7' wide x 30.0' long
timber bridge with wingwalls)
1      EACH 2,500.00 2,500.00 5,000.00 5,000.00 8,000.00 8,000.00 7,687.10 7,687.10
202-02-A-02 removal of bridge(sta. 100+00,14.8' wide x 45.0' long
timber bridge with wingwalls)
1      EACH 16,000.00 16,000.00 7,500.00 7,500.00 8,000.00 8,000.00 7,687.10 7,687.10
202-02-A-03 removal of bridge(sta.100+00 railroad tank car) 1      EACH 4,000.00 4,000.00 7,500.00 7,500.00 7,000.00 7,000.00 11,250.00 11,250.00
203-06 excavation & embankment lump      LUMP 25,000.00 25,000.00 15,000.00 15,000.00 60,000.00 60,000.00 80,337.50 80,337.50
204-02 temporary hay or straw bales 30      EACH FREE FREE 10.00 300.00 10.00 300.00 13.20 396.00
204-05-A temporary sediment check dams (hay) 12      EACH FREE FREE 125.00 1,500.00 100.00 1,200.00 181.50 2,178.00
204-06 temporary silt fencing 350      LNFT FREE FREE 3.00 1,050.00 2.50 875.00 3.10 1,085.00
302-01 class ii base course 128.5    CUYD 95.00 12,207.50 75.00 9,637.50 200.00 25,700.00 88.00 11,308.00
401-02 aggregate surface course (adjusted vehicular
measurement)
8      CUYD 95.00 760.00 150.00 1,200.00 100.00 800.00 64.60 516.80
403-01 aggregate roadway surfacing (vehicular measurement) 40.4    CUYD 95.00 3,838.00 100.00 4,040.00 80.00 3,232.00 44.84 1,811.53
502-01 superpave asphaltic concrete 106.6    TON 150.00 15,990.00 200.00 21,320.00 300.00 31,980.00 309.00 32,939.40
701-05-G-01 side drain pipe (18")(erosion) 36      LNFT 50.00 1,800.00 50.00 1,800.00 60.00 2,160.00 43.40 1,562.40
713-01 temporary signs & barricades lump      LUMP 8,000.00 8,000.00 20,000.00 20,000.00 30,000.00 30,000.00 26,988.70 26,988.70
726-01 bedding material 218.6    CUYD 95.00 20,767.00 90.00 19,674.00 75.00 16,395.00 153.30 33,511.38
727-01 mobilization lump      LUMP 25,000.00 25,000.00 65,000.00 65,000.00 68,000.00 68,000.00 16,995.00 16,995.00
729-16-B object marker assembly (type 2) 12      EACH 75.00 900.00 150.00 1,800.00 100.00 1,200.00 78.10 937.20
740-01 construction layout lump      LUMP 6,000.00 6,000.00 20,000.00 20,000.00 8,000.00 8,000.00 10,483.20 10,483.20
744-01 traffic control management lump      LUMP 2,500.00 2,500.00 5,000.00 5,000.00 2,000.00 2,000.00 11,494.30 11,494.30
805-01-B class a concrete (box culvert headwalls) 73.96   CUYD 1,000.00 73,960.00 900.00 66,564.00 1,200.00 88,752.00 995.20 73,604.99
805-12-N reinforced concrete box culverts (7'x 6') 324.0    LNFT 680.00 220,320.00 900.00 291,600.00 720.00 233,280.00 731.40 236,973.60
806-01 deformed reinforcing steel 6,057      LB 1.00 6,057.00 1.50 9,085.50 2.00 12,114.00 2.20 13,325.40
                       
 CONTRACTOR TOTAL       457,599.50   594,571.00   688,988.00   IRREGULAR