| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - BYRON E. TALBOT CONTRACTOR, INC. |
RICHARD PRICE CONTRACTING CO, LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
4,000.00 |
4,000.00 |
15,000.00 |
15,000.00 |
40,000.00 |
40,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
2,051   |
SQYD |
7.00 |
14,357.00 |
10.00 |
20,510.00 |
7.00 |
14,357.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
552.1 |
SQYD |
10.00 |
5,521.00 |
10.00 |
5,521.00 |
8.00 |
4,416.80 |
|
|
| 203-01 |
general excavation
|
1,718   |
CUYD |
10.00 |
17,180.00 |
25.00 |
42,950.00 |
12.00 |
20,616.00 |
|
|
| 203-04 |
embankment
|
2,248   |
CUYD |
10.00 |
22,480.00 |
25.00 |
56,200.00 |
19.00 |
42,712.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
250   |
CUYD |
10.00 |
2,500.00 |
20.00 |
5,000.00 |
18.00 |
4,500.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
759   |
EACH |
6.00 |
4,554.00 |
10.00 |
7,590.00 |
17.00 |
12,903.00 |
|
|
| 204-06 |
temporary silt fencing
|
6,810   |
LNFT |
2.00 |
13,620.00 |
4.50 |
30,645.00 |
3.00 |
20,430.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
125.0 |
CUYD |
35.00 |
4,375.00 |
100.00 |
12,500.00 |
100.00 |
12,500.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
5,541.7 |
TON |
65.00 |
360,210.50 |
72.00 |
399,002.40 |
73.50 |
407,314.95 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
48.8 |
TON |
65.00 |
3,172.00 |
72.00 |
3,513.60 |
73.50 |
3,586.80 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
9,869   |
SQYD |
2.50 |
24,672.50 |
2.50 |
24,672.50 |
2.80 |
27,633.20 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 137   |
CUYD |
10.00 |
- 1,370.00 |
5.00 |
- 685.00 |
9.00 |
- 1,233.00 |
|
|
| 701-04-A |
storm drain pipe arch (15" equiv. rcpa)
|
834   |
LNFT |
100.00 |
83,400.00 |
97.00 |
80,898.00 |
46.00 |
38,364.00 |
|
|
| 701-04-B |
storm drain pipe arch (18" equiv. rcpa)
|
271   |
LNFT |
135.00 |
36,585.00 |
110.00 |
29,810.00 |
54.00 |
14,634.00 |
|
|
| 701-04-D |
storm drain pipe arch (24" equiv. rcpa)
|
1,170   |
LNFT |
140.00 |
163,800.00 |
136.00 |
159,120.00 |
68.00 |
79,560.00 |
|
|
| 701-04-E |
storm drain pipe arch (30" equiv. rcpa)
|
1,102   |
LNFT |
165.00 |
181,830.00 |
167.00 |
184,034.00 |
100.00 |
110,200.00 |
|
|
| 701-04-F |
storm drain pipe arch (36" equiv. rcpa)
|
996   |
LNFT |
210.00 |
209,160.00 |
206.00 |
205,176.00 |
143.00 |
142,428.00 |
|
|
| 701-04-G |
storm drain pipe arch (42" equiv. rcpa)
|
971   |
LNFT |
245.00 |
237,895.00 |
257.00 |
249,547.00 |
184.00 |
178,664.00 |
|
|
| 701-04-H |
storm drain pipe arch (48" equiv. rcpa)
|
234   |
LNFT |
170.00 |
39,780.00 |
285.00 |
66,690.00 |
213.00 |
49,842.00 |
|
|
| 701-06-G |
side drain pipe arch (42" equiv.)
|
96   |
LNFT |
200.00 |
19,200.00 |
250.00 |
24,000.00 |
184.00 |
17,664.00 |
|
|
| 701-07-C |
yard drain pipe (8")
|
466   |
LNFT |
90.00 |
41,940.00 |
30.00 |
13,980.00 |
23.00 |
10,718.00 |
|
|
| 701-07-F |
yard drain pipe (15")
|
13   |
LNFT |
105.00 |
1,365.00 |
60.00 |
780.00 |
27.00 |
351.00 |
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
1,650.00 |
1,650.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
4,400.00 |
4,400.00 |
3,200.00 |
3,200.00 |
4,000.00 |
4,000.00 |
|
|
| 702-03-G |
catch basins (cb-09)
|
59   |
EACH |
6,000.00 |
354,000.00 |
3,300.00 |
194,700.00 |
4,000.00 |
236,000.00 |
|
|
| 702-03-H |
catch basins (cb-05)
|
37   |
EACH |
1,300.00 |
48,100.00 |
520.00 |
19,240.00 |
800.00 |
29,600.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
1,236.4 |
SQYD |
75.00 |
92,730.00 |
50.00 |
61,820.00 |
55.00 |
68,002.00 |
|
|
| 707-03 |
combination concrete curb & gutter
|
5,057.5 |
LNFT |
25.00 |
126,437.50 |
27.00 |
136,552.50 |
35.00 |
177,012.50 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
55,000.00 |
55,000.00 |
40,000.00 |
40,000.00 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
24   |
LNFT |
1.00 |
24.00 |
1.00 |
24.00 |
1.00 |
24.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
1.339 |
MILE |
800.00 |
1,071.20 |
500.00 |
669.50 |
700.00 |
937.30 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
5.298 |
MILE |
600.00 |
3,178.80 |
1,000.00 |
5,298.00 |
727.00 |
3,851.65 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
2   |
EACH |
50.00 |
100.00 |
60.00 |
120.00 |
62.00 |
124.00 |
|
|
| 713-06-B |
temporary pavement legends and symbols (double arrow)
|
2   |
EACH |
80.00 |
160.00 |
90.00 |
180.00 |
92.00 |
184.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
2   |
EACH |
50.00 |
100.00 |
60.00 |
120.00 |
62.00 |
124.00 |
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
50   |
SQYD |
80.00 |
4,000.00 |
72.00 |
3,600.00 |
90.00 |
4,500.00 |
|
|
| 726-01 |
bedding material
|
1,118.3 |
CUYD |
80.00 |
89,464.00 |
87.00 |
97,292.10 |
60.00 |
67,098.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
105,000.00 |
105,000.00 |
130,000.00 |
130,000.00 |
220,000.00 |
220,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
89   |
EACH |
6.00 |
534.00 |
6.50 |
578.50 |
6.75 |
600.75 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
12   |
LNFT |
3.00 |
36.00 |
3.40 |
40.80 |
3.50 |
42.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.649 |
MILE |
2,300.00 |
6,092.70 |
2,550.00 |
6,754.95 |
2,656.00 |
7,035.74 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
200.00 |
200.00 |
180.00 |
180.00 |
190.00 |
190.00 |
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
1   |
EACH |
200.00 |
200.00 |
240.00 |
240.00 |
253.00 |
253.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
200.00 |
200.00 |
215.00 |
215.00 |
225.00 |
225.00 |
|
|
| 736-09 |
loop detector
|
150   |
LNFT |
12.00 |
1,800.00 |
13.00 |
1,950.00 |
14.00 |
2,100.00 |
|
|
| 736-10 |
underground junction box
|
2   |
EACH |
300.00 |
600.00 |
275.00 |
550.00 |
290.00 |
580.00 |
|
|
| 739-01 |
hydro-seeding
|
1.62 |
ACRE |
2,800.00 |
4,536.00 |
1,700.00 |
2,754.00 |
1,700.00 |
2,754.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
26,000.00 |
26,000.00 |
45,000.00 |
45,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
42,000.00 |
42,000.00 |
15,000.00 |
15,000.00 |
|
|
| S-001 |
cleaning existing ditches
|
400   |
LNFT |
12.00 |
4,800.00 |
10.00 |
4,000.00 |
10.00 |
4,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,379,641.20 |
|
2,430,533.85 |
|
IRREGULAR |
|
|
|