Letting of 2/22/2006 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 258-02-0034
Parish: E BATON ROUGE
Routes: LA 427
Description: LOGMILE 2.574 - LOGMILE 2.974
Type Const: minor overlay
Estimated Construction Cost: $198,420.64
 
RankLicenseBidderConstruction Bid
1 00481 COASTAL BRIDGE CO., L.L.C. $323,417.20
2 00046 BARBER BROS. CONTRACTING CO., L.L.C $375,819.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
COASTAL BRIDGE CO., L.L.C.
- 2 -
BARBER BROS. CONTRACTING CO., L.L.C

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-F removal of concrete combination curb & gutter 16.0    LNFT 20.00 320.00 100.00 1,600.00        
502-01 superpave asphaltic concrete 1,408.7    TON 80.00 112,696.00 75.00 105,652.50        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
42.5    TON 200.00 8,500.00 150.00 6,375.00        
509-01-C cold planing asphaltic pavement 12,806      SQYD 4.00 51,224.00 3.00 38,418.00        
509-02 contractor retained reclaimed asphaltic pavement - 356      CUYD 1.00 - 356.00 0.00 0.00        
707-03 combination concrete curb & gutter 16.0    LNFT 100.00 1,600.00 100.00 1,600.00        
713-01 temporary signs & barricades lump      LUMP 22,000.00 22,000.00 25,000.00 25,000.00        
713-03-C temporary pavement markings (8" width) 304      LNFT 0.60 182.40 1.00 304.00        
713-03-E temporary pavement markings (24" width) 282      LNFT 1.50 423.00 2.00 564.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
1.456  MILE 700.00 1,019.20 650.00 946.40        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
2.912  MILE 500.00 1,456.00 450.00 1,310.40        
713-05-A temporary pavement markings (solid line)(4" width) 8.736  MILE 100.00 873.60 700.00 6,115.20        
713-06-A temporary pavement legends and symbols (arrow) 28      EACH 60.00 1,680.00 80.00 2,240.00        
713-06-C temporary pavement legends and symbols (only) 6      EACH 60.00 360.00 100.00 600.00        
724-01-B pavement patching (12" minimum thickness) 250      SQYD 20.00 5,000.00 100.00 25,000.00        
727-01 mobilization lump      LUMP 35,000.00 35,000.00 25,000.00 25,000.00        
731-02 reflectorized raised pavement markers 250      EACH 7.00 1,750.00 6.50 1,625.00        
732-01-C plastic pavement striping (8" width) 152      LNFT 1.00 152.00 2.00 304.00        
732-01-E plastic pavement striping (24" width) 141      LNFT 3.00 423.00 4.00 564.00        
732-02-A plastic pavement striping (solid line) (4" width) 1.456  MILE 2,500.00 3,640.00 3,000.00 4,368.00        
732-03-A plastic pavement striping (broken line)(4" width) 1.456  MILE 1,000.00 1,456.00 1,200.00 1,747.20        
732-04-A plastic pavement legends & symbols (arrow) 14      EACH 200.00 2,800.00 200.00 2,800.00        
732-04-C plastic pavement legends & symbols (only) 3      EACH 210.00 630.00 200.00 600.00        
736-01 trenching and backfilling 700      LNFT 2.50 1,750.00 3.00 2,100.00        
736-02 conduit with conductors (size & type) 1,880      LNFT 7.00 13,160.00 7.00 13,160.00        
736-03 jacked or bored conduit (size & type) 440      LNFT 17.00 7,480.00 18.00 7,920.00        
736-09 loop detector 1,429      LNFT 12.00 17,148.00 14.00 20,006.00        
736-10 underground junction box 6      EACH 275.00 1,650.00 350.00 2,100.00        
736-12 conductor (size & type) 1,400      LNFT 1.00 1,400.00 2.00 2,800.00        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 5,000.00 5,000.00        
744-01 traffic control management lump      LUMP 10,000.00 10,000.00 20,000.00 20,000.00        
S-001 dynamic message sign unit 2      EACH 4,000.00 8,000.00 25,000.00 50,000.00        
                       
 CONTRACTOR TOTAL       323,417.20   375,819.70        