Letting of 2/22/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 095-02-0015
Parish: CADDO
Routes: I-49, LA 168
Description: I-49 NORTH (LA 168 TO ARKANSAS STATE LINE)
Type Const: clearing and grubbing, excavation, embankment, drainage structures, and related
work.
Estimated Construction Cost: $5,148,998.50
 
RankLicenseBidderConstruction Bid
1 39670 EUTAW CONSTRUCTION CO. INC. $4,538,925.00
2 34567 JAMES CONSTRUCTION GROUP LLC $4,557,128.97
3 40615 SPECIALTY TRACKHOE & DOZER SERV.INC $4,771,735.61
4 01480 A.K. GILLIS & SONS, INC. $5,171,632.24
5 36374 BEST-YET BUILDERS, LLC $6,216,273.28
6 39462 DENTON-JAMES LLC $6,734,803.90
 41491 CLEVE BATTE CONSTRUCTION INC. IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
EUTAW CONSTRUCTION CO. INC.
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
SPECIALTY TRACKHOE & DOZER SERV.INC
- 4 -
A.K. GILLIS & SONS, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 100,000.00 100,000.00 250,000.00 250,000.00 300,000.00 300,000.00 266,000.00 266,000.00
202-01 removal of structures & obstructions lump      LUMP 100.00 100.00 10,000.00 10,000.00 20,000.00 20,000.00 46,800.00 46,800.00
202-02-01 removal of brick veneer house on slab (35' x 80'
station 134+00 left of cen terline)
1      EACH 5,000.00 5,000.00 1.00 1.00 5,000.00 5,000.00 5,200.00 5,200.00
202-02-02 removal of wood frame house on piers (30' x 55'
station 138+70 right of cen terline)
1      EACH 5,000.00 5,000.00 1.00 1.00 4,000.00 4,000.00 3,000.00 3,000.00
202-02-03 removal of wood frame shed (10' x 12' station
139+60 right of centerline)
1      EACH 500.00 500.00 1.00 1.00 500.00 500.00 600.00 600.00
202-02-04 removal of wood frame house on slab (25' x 40' station
177+60 right of cent erline)
1      EACH 5,000.00 5,000.00 1.00 1.00 4,000.00 4,000.00 3,800.00 3,800.00
202-02-05 removal of wood frame house on piers (50' x 70'
station 180+00 on centerlin e)
1      EACH 5,000.00 5,000.00 1.00 1.00 4,000.00 4,000.00 6,600.00 6,600.00
202-02-06 removal of metal garage (25' x 25' station 180+50 left
of centerline)
1      EACH 500.00 500.00 1.00 1.00 1,000.00 1,000.00 2,000.00 2,000.00
202-02-07 removal of wood frame storage building on piers (10' x
30' right of centerl ine)
1      EACH 500.00 500.00 1.00 1.00 1,000.00 1,000.00 2,600.00 2,600.00
202-02-08 removal of existing sewer tank (station 133+32 right
of centerline)
1      EACH 500.00 500.00 1,300.00 1,300.00 1,000.00 1,000.00 2,500.00 2,500.00
202-02-09 removal of existing sewer tank (station 133+71 left of
centerline)
1      EACH 500.00 500.00 1,300.00 1,300.00 1,000.00 1,000.00 2,500.00 2,500.00
202-02-10 removal of existing sewer tank (station 139+48 right
of centerline)
1      EACH 500.00 500.00 1,300.00 1,300.00 1,000.00 1,000.00 2,500.00 2,500.00
203-01 general excavation 632,619      CUYD 3.35 2,119,273.65 2.00 1,265,238.00 2.00 1,265,238.00 2.76 1,746,028.44
203-02 drainage excavation 3,891      CUYD 3.00 11,673.00 8.00 31,128.00 5.00 19,455.00 5.84 22,723.44
203-03 muck excavation 4,500      CUYD 5.00 22,500.00 8.00 36,000.00 5.00 22,500.00 5.96 26,820.00
203-04 embankment 475,747      CUYD 1.50 713,620.50 2.66 1,265,487.02 1.80 856,344.60 1.81 861,102.07
204-02 temporary hay or straw bales 1,000      EACH 8.00 8,000.00 10.00 10,000.00 8.00 8,000.00 9.50 9,500.00
204-05-A temporary sediment check dams (hay) 750      EACH 100.00 75,000.00 95.00 71,250.00 80.00 60,000.00 95.00 71,250.00
204-05-B temporary sediment check dams (stone) 16      EACH 700.00 11,200.00 650.00 10,400.00 1,000.00 16,000.00 1,200.00 19,200.00
204-06 temporary silt fencing 37,682      LNFT 2.00 75,364.00 2.00 75,364.00 1.10 41,450.20 2.89 108,900.98
204-07 temporary stone construction entrance 2      EACH 2,000.00 4,000.00 4,000.00 8,000.00 2,500.00 5,000.00 6,500.00 13,000.00
701-01-I cross drain pipe (24" rcp/pcp) 1,106      LNFT 50.00 55,300.00 70.00 77,420.00 50.00 55,300.00 40.00 44,240.00
701-01-K cross drain pipe (30" rcp/pcp) 188      LNFT 55.00 10,340.00 75.00 14,100.00 60.00 11,280.00 54.00 10,152.00
701-01-M cross drain pipe (36" rcp/pcp) 212      LNFT 65.00 13,780.00 95.00 20,140.00 85.00 18,020.00 67.00 14,204.00
701-01-N cross drain pipe (42" rcp/pcp) 118      LNFT 125.00 14,750.00 120.00 14,160.00 140.00 16,520.00 97.00 11,446.00
701-01-O cross drain pipe (48" rcp/pcp) 812      LNFT 140.00 113,680.00 160.00 129,920.00 190.00 154,280.00 137.00 111,244.00
701-01-Q cross drain pipe (60" rcp/pcp) 1,660      LNFT 190.00 315,400.00 205.00 340,300.00 285.00 473,100.00 206.00 341,960.00
701-03-F storm drain pipe (15" rcp/pcp) 354      LNFT 35.00 12,390.00 58.00 20,532.00 28.00 9,912.00 31.00 10,974.00
702-03-B catch basins (cb-02) 5      EACH 4,500.00 22,500.00 4,700.00 23,500.00 3,500.00 17,500.00 4,200.00 21,000.00
702-03-C catch basins (cb-06) 4      EACH 3,000.00 12,000.00 3,500.00 14,000.00 3,500.00 14,000.00 2,500.00 10,000.00
705-02 combination mesh & barbed wire fence 30,133      LNFT 5.00 150,665.00 5.00 150,665.00 5.50 165,731.50 5.25 158,198.25
708-01 right-of-way monument 61      EACH 160.00 9,760.00 100.00 6,100.00 150.00 9,150.00 200.00 12,200.00
708-02 right-of-way monument witness post 61      EACH 30.00 1,830.00 100.00 6,100.00 150.00 9,150.00 150.00 9,150.00
711-01-C riprap (30 lb, 14" thick) 1,380      SQYD 60.00 82,800.00 55.00 75,900.00 40.00 55,200.00 59.08 81,530.40
711-04 geotextile fabric 1,830      SQYD 3.00 5,490.00 2.00 3,660.00 1.50 2,745.00 2.27 4,154.10
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 10,000.00 10,000.00 10,000.00 10,000.00 45,800.00 45,800.00
716-01-A mulch (vegetative) 138.00   ACRE 500.00 69,000.00 500.00 69,000.00 800.00 110,400.00 500.00 69,000.00
717-01 seeding 4,262      LB 6.00 25,572.00 6.00 25,572.00 6.20 26,424.40 5.95 25,358.90
718-01 fertilizer 170,487      LB 0.30 51,146.10 0.25 42,621.75 0.23 39,212.01 0.27 46,031.49
720-01-A erosion control system, slope protection (type a) 61,394      SQYD 1.25 76,742.50 1.15 70,603.10 1.00 61,394.00 1.15 70,603.10
720-01-C erosion control system, flexible channel liner (type c) 5,529      SQYD 1.50 8,293.50 1.60 8,846.40 1.10 6,081.90 1.60 8,846.40
720-01-D erosion control system, flexible channel liner (type d) 22,637      SQYD 1.50 33,955.50 1.50 33,955.50 1.10 24,900.70 1.50 33,955.50
720-01-E erosion control system, flexible channel liner (type e) 5,612      SQYD 1.50 8,418.00 1.60 8,979.20 1.10 6,173.20 1.60 8,979.20
720-01-F erosion control system, flexible channel liner (type f) 3,071      SQYD 1.75 5,374.25 2.00 6,142.00 1.10 3,378.10 2.00 6,142.00
722-02 project site laboratory (equipped) 1      EACH 5,000.00 5,000.00 18,000.00 18,000.00 40,000.00 40,000.00 22,900.00 22,900.00
726-01 bedding material 1,012.3    CUYD 90.00 91,107.00 60.00 60,738.00 50.00 50,615.00 63.25 64,027.97
727-01 mobilization lump      LUMP 30,000.00 30,000.00 160,000.00 160,000.00 200,000.00 200,000.00 440,000.00 440,000.00
729-16-B object marker assembly (type 2) 54      EACH 50.00 2,700.00 50.00 2,700.00 70.00 3,780.00 75.00 4,050.00
729-19-A dead end road installations(type a) 2      EACH 1,600.00 3,200.00 1,600.00 3,200.00 3,000.00 6,000.00 2,000.00 4,000.00
740-01 construction layout lump      LUMP 100,000.00 100,000.00 50,000.00 50,000.00 370,000.00 370,000.00 160,000.00 160,000.00
740-02 utility oversight and coordination lump      LUMP 5,000.00 5,000.00 10,000.00 10,000.00 10,000.00 10,000.00 13,000.00 13,000.00
744-01 traffic control management lump      LUMP 5,000.00 5,000.00 5,000.00 5,000.00 100,000.00 100,000.00 16,000.00 16,000.00
S-001 plugging/sealing encountered oil wells 2,000      LNFT 10.00 20,000.00 17.00 34,000.00 20.00 40,000.00 21.73 43,460.00
S-002 plugging existing water wells 3      EACH 3,000.00 9,000.00 1,500.00 4,500.00 5,000.00 15,000.00 8,800.00 26,400.00
                       
 CONTRACTOR TOTAL       4,538,925.00   4,557,128.97   4,771,735.61   5,171,632.24
 
Item Number Item Description Quantity Unit of Measure - 5 -
BEST-YET BUILDERS, LLC
- 6 -
DENTON-JAMES LLC

CLEVE BATTE CONSTRUCTION INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 500,000.00 500,000.00 850,000.00 850,000.00 189,900.00 189,900.00    
202-01 removal of structures & obstructions lump      LUMP 100,000.00 100,000.00 35,000.00 35,000.00 18,500.00 18,500.00    
202-02-01 removal of brick veneer house on slab (35' x 80'
station 134+00 left of cen terline)
1      EACH 2,500.00 2,500.00 1.00 1.00 5,800.00 5,800.00    
202-02-02 removal of wood frame house on piers (30' x 55'
station 138+70 right of cen terline)
1      EACH 1,500.00 1,500.00 1.00 1.00 3,000.00 3,000.00    
202-02-03 removal of wood frame shed (10' x 12' station
139+60 right of centerline)
1      EACH 100.00 100.00 1.00 1.00 1,000.00 1,000.00    
202-02-04 removal of wood frame house on slab (25' x 40' station
177+60 right of cent erline)
1      EACH 2,000.00 2,000.00 1.00 1.00 3,000.00 3,000.00    
202-02-05 removal of wood frame house on piers (50' x 70'
station 180+00 on centerlin e)
1      EACH 1,500.00 1,500.00 1.00 1.00 2,500.00 2,500.00    
202-02-06 removal of metal garage (25' x 25' station 180+50 left
of centerline)
1      EACH 2,000.00 2,000.00 1.00 1.00 1,000.00 1,000.00    
202-02-07 removal of wood frame storage building on piers (10' x
30' right of centerl ine)
1      EACH 250.00 250.00 1.00 1.00 1,500.00 1,500.00    
202-02-08 removal of existing sewer tank (station 133+32 right
of centerline)
1      EACH 250.00 250.00 2,000.00 2,000.00 4,500.00 4,500.00    
202-02-09 removal of existing sewer tank (station 133+71 left of
centerline)
1      EACH 250.00 250.00 2,000.00 2,000.00 4,500.00 4,500.00    
202-02-10 removal of existing sewer tank (station 139+48 right
of centerline)
1      EACH 250.00 250.00 2,000.00 2,000.00 4,500.00 4,500.00    
203-01 general excavation 632,619      CUYD 2.50 1,581,547.50 2.80 1,771,333.20 2.00 1,265,238.00    
203-02 drainage excavation 3,891      CUYD 6.00 23,346.00 7.00 27,237.00 5.70 22,178.70    
203-03 muck excavation 4,500      CUYD 6.00 27,000.00 8.00 36,000.00 9.70 43,650.00    
203-04 embankment 475,747      CUYD 3.00 1,427,241.00 3.30 1,569,965.10 1.80 856,344.60    
204-02 temporary hay or straw bales 1,000      EACH 10.00 10,000.00 6.00 6,000.00 10.80 10,800.00    
204-05-A temporary sediment check dams (hay) 750      EACH 100.00 75,000.00 70.00 52,500.00 100.00 75,000.00    
204-05-B temporary sediment check dams (stone) 16      EACH 1,000.00 16,000.00 700.00 11,200.00 2,500.00 40,000.00    
204-06 temporary silt fencing 37,682      LNFT 1.00 37,682.00 1.30 48,986.60 1.60 60,291.20    
204-07 temporary stone construction entrance 2      EACH 1,500.00 3,000.00 1,600.00 3,200.00 3,200.00 6,400.00    
701-01-I cross drain pipe (24" rcp/pcp) 1,106      LNFT 70.00 77,420.00 75.00 82,950.00 54.00 59,724.00    
701-01-K cross drain pipe (30" rcp/pcp) 188      LNFT 75.00 14,100.00 90.00 16,920.00 67.00 12,596.00    
701-01-M cross drain pipe (36" rcp/pcp) 212      LNFT 125.00 26,500.00 120.00 25,440.00 90.00 19,080.00    
701-01-N cross drain pipe (42" rcp/pcp) 118      LNFT 150.00 17,700.00 125.00 14,750.00 165.00 19,470.00    
701-01-O cross drain pipe (48" rcp/pcp) 812      LNFT 200.00 162,400.00 190.00 154,280.00 200.00 162,400.00    
701-01-Q cross drain pipe (60" rcp/pcp) 1,660      LNFT 350.00 581,000.00 250.00 415,000.00 300.00 498,000.00    
701-03-F storm drain pipe (15" rcp/pcp) 354      LNFT 40.00 14,160.00 40.00 14,160.00 36.00 12,744.00    
702-03-B catch basins (cb-02) 5      EACH 4,000.00 20,000.00 6,000.00 30,000.00 3,700.00 18,500.00    
702-03-C catch basins (cb-06) 4      EACH 4,000.00 16,000.00 4,500.00 18,000.00 3,700.00 14,800.00    
705-02 combination mesh & barbed wire fence 30,133      LNFT 5.00 150,665.00 5.00 150,665.00 5.50 165,731.50    
708-01 right-of-way monument 61      EACH 125.00 7,625.00 100.00 6,100.00 340.00 20,740.00    
708-02 right-of-way monument witness post 61      EACH 125.00 7,625.00 100.00 6,100.00 110.00 6,710.00    
711-01-C riprap (30 lb, 14" thick) 1,380      SQYD 75.00 103,500.00 80.00 110,400.00 64.00 88,320.00    
711-04 geotextile fabric 1,830      SQYD 2.36 4,318.80 2.50 4,575.00 2.70 4,941.00    
713-01 temporary signs & barricades lump      LUMP 25,000.00 25,000.00 20,000.00 20,000.00 9,000.00 9,000.00    
716-01-A mulch (vegetative) 138.00   ACRE 690.00 95,220.00 450.00 62,100.00 890.00 122,820.00    
717-01 seeding 4,262      LB 7.00 29,834.00 6.50 27,703.00 11.00 46,882.00    
718-01 fertilizer 170,487      LB 0.30 51,146.10 0.50 85,243.50 0.33 56,260.71    
720-01-A erosion control system, slope protection (type a) 61,394      SQYD 0.75 46,045.50 1.30 79,812.20 1.20 73,672.80    
720-01-C erosion control system, flexible channel liner (type c) 5,529      SQYD 1.25 6,911.25 1.40 7,740.60 1.40 7,740.60    
720-01-D erosion control system, flexible channel liner (type d) 22,637      SQYD 1.25 28,296.25 1.40 31,691.80 1.70 38,482.90    
720-01-E erosion control system, flexible channel liner (type e) 5,612      SQYD 2.30 12,907.60 2.20 12,346.40 3.00 16,836.00    
720-01-F erosion control system, flexible channel liner (type f) 3,071      SQYD 3.20 9,827.20 5.50 16,890.50 3.10 9,520.10    
722-02 project site laboratory (equipped) 1      EACH 10,000.00 10,000.00 10,000.00 10,000.00 45,000.00 45,000.00    
726-01 bedding material 1,012.3    CUYD 55.00 55,676.50 90.00 91,107.00 65.00 65,799.50    
727-01 mobilization lump      LUMP 600,000.00 600,000.00 600,000.00 600,000.00 456,000.00 456,000.00    
729-16-B object marker assembly (type 2) 54      EACH 66.27 3,578.58 50.00 2,700.00 55.00 2,970.00    
729-19-A dead end road installations(type a) 2      EACH 2,800.00 5,600.00 1,600.00 3,200.00 33,000.00 66,000.00    
740-01 construction layout lump      LUMP 200,000.00 200,000.00 150,000.00 150,000.00 285,000.00 285,000.00    
740-02 utility oversight and coordination lump      LUMP 5,000.00 5,000.00 10,000.00 10,000.00 30,000.00 30,000.00    
744-01 traffic control management lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00 9,000.00 9,000.00    
S-001 plugging/sealing encountered oil wells 2,000      LNFT 0.10 200.00 20.00 40,000.00 20.00 40,000.00    
S-002 plugging existing water wells 3      EACH 2,200.00 6,600.00 2,500.00 7,500.00 4,000.00 12,000.00    
                       
 CONTRACTOR TOTAL       6,216,273.28   6,734,803.90   IRREGULAR    