Letting of 2/22/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 056-07-0016
Parish: ST LANDRY
Routes: LA 31
Description: LEONVILLE NORTHWEST CITY LIMITS - JUNCTION LA 742
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete pavement,
cement treated base course, lime treatment, and related work.
Estimated Construction Cost: $3,440,119.80
 
RankLicenseBidderConstruction Bid
1 34356 PRAIRIE CONTRACTORS INC. $3,450,771.47
2 08815 W. E. MCDONALD & SON, LLC. $3,488,270.37
3 12312 GILCHRIST CONSTRUCTION CO. LLC $3,893,696.12
4 04089 H & S CONSTRUCTION CO., INC. $4,459,043.87
 
Item Number Item Description Quantity Unit of Measure - 1 -
PRAIRIE CONTRACTORS INC.
- 2 -
W. E. MCDONALD & SON, LLC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC
- 4 -
H & S CONSTRUCTION CO., INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 1,114      CUYD 11.00 12,254.00 8.00 8,912.00 12.00 13,368.00 20.00 22,280.00
203-08-A borrow (vehicular meas.)(selected soils) 1,568      CUYD 11.00 17,248.00 8.00 12,544.00 14.00 21,952.00 20.00 31,360.00
204-05-A temporary sediment check dams (hay) 32      EACH 250.00 8,000.00 250.00 8,000.00 150.00 4,800.00 200.00 6,400.00
303-02 removal of existing patches 6,641      SQYD 2.00 13,282.00 15.00 99,615.00 12.00 79,692.00 40.00 265,640.00
304-01 lime 748.44   TON 118.00 88,315.92 120.00 89,812.80 130.00 97,297.20 160.00 119,750.40
304-03-D lime treatment (type c) (12" thick) 47,520      SQYD 4.00 190,080.00 4.50 213,840.00 4.50 213,840.00 4.00 190,080.00
401-02 aggregate surface course (adjusted vehicular
measurement)
227      CUYD 75.00 17,025.00 100.00 22,700.00 32.00 7,264.00 60.00 13,620.00
502-01 superpave asphaltic concrete 18,993.6    TON 65.50 1,244,080.80 68.00 1,291,564.80 67.00 1,272,571.20 72.00 1,367,539.20
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
891.6    TON 90.00 80,244.00 90.00 80,244.00 120.00 106,992.00 80.00 71,328.00
509-01 cold planing asphaltic pavement 67,777      SQYD 1.50 101,665.50 1.55 105,054.35 1.90 128,776.30 2.00 135,554.00
509-02 contractor retained reclaimed asphaltic pavement - 2,353      CUYD 0.01 - 23.53 0.01 - 23.53 0.01 - 23.53 0.01 - 23.53
706-02-C concrete drive (6" thick) 50.0    SQYD 100.00 5,000.00 100.00 5,000.00 68.00 3,400.00 75.00 3,750.00
712-02 sacked concrete revetment 80      SQYD 150.00 12,000.00 100.00 8,000.00 95.00 7,600.00 100.00 8,000.00
713-01 temporary signs & barricades lump      LUMP 152,000.00 152,000.00 12,000.00 12,000.00 12,000.00 12,000.00 80,000.00 80,000.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
11.320  MILE 300.00 3,396.00 300.00 3,396.00 400.00 4,528.00 400.00 4,528.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.594  MILE 0.01 0.07 200.00 1,318.80 350.00 2,307.90 600.00 3,956.40
713-05-A temporary pavement markings (solid line)(4" width) 35.589  MILE 0.01 0.36 400.00 14,235.60 500.00 17,794.50 2,000.00 71,178.00
722-02 project site laboratory (equipped) 1      EACH 4,000.00 4,000.00 4,500.00 4,500.00 8,500.00 8,500.00 10,000.00 10,000.00
727-01 mobilization lump      LUMP 152,000.00 152,000.00 50,000.00 50,000.00 250,000.00 250,000.00 75,000.00 75,000.00
729-16-C object marker assembly (type 3) 24      EACH 100.00 2,400.00 75.00 1,800.00 75.00 1,800.00 70.00 1,680.00
731-02 reflectorized raised pavement markers 754      EACH 6.00 4,524.00 4.50 3,393.00 6.00 4,524.00 10.00 7,540.00
732-02-A plastic pavement striping (solid line) (4" width) 17.795  MILE 2,150.00 38,259.25 1,850.00 32,920.75 2,200.00 39,149.00 2,600.00 46,267.00
732-03-A plastic pavement striping (broken line)(4" width) 3.297  MILE 800.00 2,637.60 700.00 2,307.90 900.00 2,967.30 1,200.00 3,956.40
735-01 mailboxes 176      EACH 1.00 176.00 1.00 176.00 25.00 4,400.00 20.00 3,520.00
735-02 mailbox supports (single) 94      EACH 135.00 12,690.00 135.00 12,690.00 150.00 14,100.00 160.00 15,040.00
735-03 mailbox supports (double) 25      EACH 170.00 4,250.00 185.00 4,625.00 175.00 4,375.00 200.00 5,000.00
735-04 mailbox supports (multiple) 10      EACH 300.00 3,000.00 325.00 3,250.00 300.00 3,000.00 300.00 3,000.00
740-01 construction layout lump      LUMP 100.00 100.00 7,500.00 7,500.00 15,000.00 15,000.00 50,000.00 50,000.00
744-01 traffic control management lump      LUMP 100.00 100.00 10,000.00 10,000.00 50,000.00 50,000.00 50,000.00 50,000.00
S-001 cement treatment (12" thick) 89,655      SQYD 6.90 618,619.50 7.50 672,412.50 8.25 739,653.75 10.00 896,550.00
S-002 cement treated base course (12 in depth) 89,655      SQYD 7.40 663,447.00 7.88 706,481.40 8.50 762,067.50 10.00 896,550.00
                       
 CONTRACTOR TOTAL       3,450,771.47   3,488,270.37   3,893,696.12   4,459,043.87