| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - PRAIRIE CONTRACTORS INC. |
- 2 - W. E. MCDONALD & SON, LLC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - H & S CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
1,114   |
CUYD |
11.00 |
12,254.00 |
8.00 |
8,912.00 |
12.00 |
13,368.00 |
20.00 |
22,280.00 |
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
1,568   |
CUYD |
11.00 |
17,248.00 |
8.00 |
12,544.00 |
14.00 |
21,952.00 |
20.00 |
31,360.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
32   |
EACH |
250.00 |
8,000.00 |
250.00 |
8,000.00 |
150.00 |
4,800.00 |
200.00 |
6,400.00 |
| 303-02 |
removal of existing patches
|
6,641   |
SQYD |
2.00 |
13,282.00 |
15.00 |
99,615.00 |
12.00 |
79,692.00 |
40.00 |
265,640.00 |
| 304-01 |
lime
|
748.44 |
TON |
118.00 |
88,315.92 |
120.00 |
89,812.80 |
130.00 |
97,297.20 |
160.00 |
119,750.40 |
| 304-03-D |
lime treatment (type c) (12" thick)
|
47,520   |
SQYD |
4.00 |
190,080.00 |
4.50 |
213,840.00 |
4.50 |
213,840.00 |
4.00 |
190,080.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
227   |
CUYD |
75.00 |
17,025.00 |
100.00 |
22,700.00 |
32.00 |
7,264.00 |
60.00 |
13,620.00 |
| 502-01 |
superpave asphaltic concrete
|
18,993.6 |
TON |
65.50 |
1,244,080.80 |
68.00 |
1,291,564.80 |
67.00 |
1,272,571.20 |
72.00 |
1,367,539.20 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
891.6 |
TON |
90.00 |
80,244.00 |
90.00 |
80,244.00 |
120.00 |
106,992.00 |
80.00 |
71,328.00 |
| 509-01 |
cold planing asphaltic pavement
|
67,777   |
SQYD |
1.50 |
101,665.50 |
1.55 |
105,054.35 |
1.90 |
128,776.30 |
2.00 |
135,554.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,353   |
CUYD |
0.01 |
- 23.53 |
0.01 |
- 23.53 |
0.01 |
- 23.53 |
0.01 |
- 23.53 |
| 706-02-C |
concrete drive (6" thick)
|
50.0 |
SQYD |
100.00 |
5,000.00 |
100.00 |
5,000.00 |
68.00 |
3,400.00 |
75.00 |
3,750.00 |
| 712-02 |
sacked concrete revetment
|
80   |
SQYD |
150.00 |
12,000.00 |
100.00 |
8,000.00 |
95.00 |
7,600.00 |
100.00 |
8,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
152,000.00 |
152,000.00 |
12,000.00 |
12,000.00 |
12,000.00 |
12,000.00 |
80,000.00 |
80,000.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
11.320 |
MILE |
300.00 |
3,396.00 |
300.00 |
3,396.00 |
400.00 |
4,528.00 |
400.00 |
4,528.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.594 |
MILE |
0.01 |
0.07 |
200.00 |
1,318.80 |
350.00 |
2,307.90 |
600.00 |
3,956.40 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
35.589 |
MILE |
0.01 |
0.36 |
400.00 |
14,235.60 |
500.00 |
17,794.50 |
2,000.00 |
71,178.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
4,000.00 |
4,000.00 |
4,500.00 |
4,500.00 |
8,500.00 |
8,500.00 |
10,000.00 |
10,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
152,000.00 |
152,000.00 |
50,000.00 |
50,000.00 |
250,000.00 |
250,000.00 |
75,000.00 |
75,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
24   |
EACH |
100.00 |
2,400.00 |
75.00 |
1,800.00 |
75.00 |
1,800.00 |
70.00 |
1,680.00 |
| 731-02 |
reflectorized raised pavement markers
|
754   |
EACH |
6.00 |
4,524.00 |
4.50 |
3,393.00 |
6.00 |
4,524.00 |
10.00 |
7,540.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.795 |
MILE |
2,150.00 |
38,259.25 |
1,850.00 |
32,920.75 |
2,200.00 |
39,149.00 |
2,600.00 |
46,267.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.297 |
MILE |
800.00 |
2,637.60 |
700.00 |
2,307.90 |
900.00 |
2,967.30 |
1,200.00 |
3,956.40 |
| 735-01 |
mailboxes
|
176   |
EACH |
1.00 |
176.00 |
1.00 |
176.00 |
25.00 |
4,400.00 |
20.00 |
3,520.00 |
| 735-02 |
mailbox supports (single)
|
94   |
EACH |
135.00 |
12,690.00 |
135.00 |
12,690.00 |
150.00 |
14,100.00 |
160.00 |
15,040.00 |
| 735-03 |
mailbox supports (double)
|
25   |
EACH |
170.00 |
4,250.00 |
185.00 |
4,625.00 |
175.00 |
4,375.00 |
200.00 |
5,000.00 |
| 735-04 |
mailbox supports (multiple)
|
10   |
EACH |
300.00 |
3,000.00 |
325.00 |
3,250.00 |
300.00 |
3,000.00 |
300.00 |
3,000.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
100.00 |
100.00 |
7,500.00 |
7,500.00 |
15,000.00 |
15,000.00 |
50,000.00 |
50,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
100.00 |
100.00 |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
| S-001 |
cement treatment (12" thick)
|
89,655   |
SQYD |
6.90 |
618,619.50 |
7.50 |
672,412.50 |
8.25 |
739,653.75 |
10.00 |
896,550.00 |
| S-002 |
cement treated base course (12 in depth)
|
89,655   |
SQYD |
7.40 |
663,447.00 |
7.88 |
706,481.40 |
8.50 |
762,067.50 |
10.00 |
896,550.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,450,771.47 |
|
3,488,270.37 |
|
3,893,696.12 |
|
4,459,043.87 |
|