| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BENTON & BROWN, LLC. |
- 2 - BEST-YET BUILDERS, LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
1,000   |
CUYD |
12.00 |
12,000.00 |
0.10 |
100.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
12,436.7 |
TON |
60.00 |
746,202.00 |
70.00 |
870,569.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
113,061   |
SQYD |
1.15 |
130,020.15 |
1.30 |
146,979.30 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,147   |
CUYD |
0.10 |
- 314.70 |
0.01 |
- 31.47 |
|
|
|
|
| 712-04 |
flexible revetment
|
330   |
SQYD |
60.00 |
19,800.00 |
40.00 |
13,200.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
40,000.00 |
40,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
1,135   |
LNFT |
0.45 |
510.75 |
0.01 |
11.35 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
1,640   |
LNFT |
1.30 |
2,132.00 |
0.01 |
16.40 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
16.060 |
MILE |
345.00 |
5,540.70 |
1.00 |
16.06 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
19.396 |
MILE |
1.00 |
19.39 |
1.00 |
19.39 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
32.880 |
MILE |
1.00 |
32.88 |
1.00 |
32.88 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
500   |
SQYD |
75.00 |
37,500.00 |
70.00 |
35,000.00 |
|
|
|
|
| 724-03 |
pavement joint repair
|
42.6 |
TON |
590.00 |
25,134.00 |
100.00 |
4,260.00 |
|
|
|
|
| 724-03-A |
pavement joint repair (special detail)
|
318.2 |
TON |
165.00 |
52,503.00 |
100.00 |
31,820.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
40,000.00 |
40,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
5   |
EACH |
85.00 |
425.00 |
55.00 |
275.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,217   |
EACH |
6.00 |
13,302.00 |
5.20 |
11,528.40 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,135   |
LNFT |
1.00 |
1,135.00 |
0.90 |
1,021.50 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,640   |
LNFT |
3.00 |
4,920.00 |
2.70 |
4,428.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
18.434 |
MILE |
2,600.00 |
47,928.40 |
2,190.00 |
40,370.46 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
9.908 |
MILE |
900.00 |
8,917.20 |
790.00 |
7,827.32 |
|
|
|
|
| 732-04-A |
plastic pavement legends and symbols (arrow)
|
26   |
EACH |
175.00 |
4,550.00 |
155.00 |
4,030.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends and symbols (only)
|
26   |
EACH |
190.00 |
4,940.00 |
165.00 |
4,290.00 |
|
|
|
|
| 735-01 |
mailboxes
|
2   |
EACH |
25.00 |
50.00 |
5.00 |
10.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
2   |
EACH |
150.00 |
300.00 |
130.00 |
260.00 |
|
|
|
|
| 736-01 |
trenching and backfilling
|
50   |
LNFT |
3.50 |
175.00 |
3.00 |
150.00 |
|
|
|
|
| 736-09 |
loop detector
|
200   |
LNFT |
18.40 |
3,680.00 |
16.00 |
3,200.00 |
|
|
|
|
| 736-11-A |
conduit (1/2" rigid metal)
|
50   |
LNFT |
9.20 |
460.00 |
8.00 |
400.00 |
|
|
|
|
| 736-12-A |
conductor 2-16 gauge stranded: xlpe
|
50   |
LNFT |
2.30 |
115.00 |
2.00 |
100.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-001 |
roadway joint reinforcing mesh (detail repair system)
|
120   |
LNFT |
30.00 |
3,600.00 |
1.12 |
134.40 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,225,577.77 |
|
1,302,017.99 |
|
|
|
|
|