| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DENTON-JAMES LLC |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - JAMES CONSTRUCTION GROUP LLC |
- 4 - D & J CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
700,000.00 |
700,000.00 |
300,000.00 |
300,000.00 |
750,000.00 |
750,000.00 |
500,000.00 |
500,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
60,000.00 |
60,000.00 |
45,000.00 |
45,000.00 |
72,000.00 |
72,000.00 |
25,000.00 |
25,000.00 |
| 202-02-B |
removal of concrete box culvert (sta. 22+775)
|
1   |
ea |
6,000.00 |
6,000.00 |
4,000.00 |
4,000.00 |
1,720.00 |
1,720.00 |
5,000.00 |
5,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
5,804.5 |
sq m |
4.00 |
23,218.00 |
7.50 |
43,533.75 |
8.00 |
46,436.00 |
7.00 |
40,631.50 |
| 202-02-H |
removal of guard rail
|
993   |
ln m |
6.50 |
6,454.50 |
15.00 |
14,895.00 |
6.50 |
6,454.50 |
13.00 |
12,909.00 |
| 202-02-I |
removal of 3785 l underground storage tank
|
1   |
each |
7,000.00 |
7,000.00 |
8,500.00 |
8,500.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
| 202-02-01 |
removal of 6.083 m x 18.248 m cinder block building
(rt. of sta. 30+115) |
1   |
each |
1.00 |
1.00 |
6,000.00 |
6,000.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
| 202-02-02 |
removal of 6.083 m x 12.165 m brick milking parlor
(rt. of sta. 30+475) |
1   |
each |
1.00 |
1.00 |
4,000.00 |
4,000.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
| 202-02-03 |
removal of 9.124 m x 12.165 m wood frame barn (rt. of
sta. 30+490) |
1   |
each |
1.00 |
1.00 |
4,500.00 |
4,500.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
| 202-02-04 |
removal of 10.036 m x 10.949 m wood frame residence
(rt. of sta. 30+537) |
1   |
each |
1.00 |
1.00 |
4,500.00 |
4,500.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
| 202-02-05 |
removal of 9.124 m x 9.124 m wood frame residence (rt.
of sta. 30+570) (contains non-friable asbestos) |
1   |
each |
1.00 |
1.00 |
3,500.00 |
3,500.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
| 202-05 |
excavation, disposal and backfilling of contaminated
soil |
100   |
cu m |
200.00 |
20,000.00 |
300.00 |
30,000.00 |
200.00 |
20,000.00 |
100.00 |
10,000.00 |
| 202-06 |
removal and disposal of contaminated fluid
|
3,785   |
l |
0.30 |
1,135.50 |
1.00 |
3,785.00 |
0.45 |
1,703.25 |
0.60 |
2,271.00 |
| 203-01 |
general excavation
|
104,143   |
cu m |
3.00 |
312,429.00 |
4.50 |
468,643.50 |
7.00 |
729,001.00 |
5.50 |
572,786.50 |
| 203-02 |
drainage excavation
|
4,142   |
cu m |
10.00 |
41,420.00 |
9.50 |
39,349.00 |
15.00 |
62,130.00 |
10.00 |
41,420.00 |
| 203-03 |
muck excavation
|
2,243   |
cu m |
11.00 |
24,673.00 |
18.00 |
40,374.00 |
15.00 |
33,645.00 |
10.00 |
22,430.00 |
| 203-04 |
embankment
|
296,834   |
cu m |
9.20 |
2,730,872.80 |
10.00 |
2,968,340.00 |
9.00 |
2,671,506.00 |
12.00 |
3,562,008.00 |
| 204-02 |
temporary hay or straw bales
|
217   |
ea |
7.00 |
1,519.00 |
16.00 |
3,472.00 |
6.50 |
1,410.50 |
8.00 |
1,736.00 |
| 204-03 |
temporary slope drains
|
598   |
ln m |
35.00 |
20,930.00 |
50.00 |
29,900.00 |
20.00 |
11,960.00 |
10.00 |
5,980.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
186   |
ea |
90.00 |
16,740.00 |
150.00 |
27,900.00 |
85.00 |
15,810.00 |
110.00 |
20,460.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
22   |
ea |
600.00 |
13,200.00 |
750.00 |
16,500.00 |
500.00 |
11,000.00 |
255.00 |
5,610.00 |
| 204-06 |
temporary silt fencing
|
18,000   |
ln m |
3.50 |
63,000.00 |
5.50 |
99,000.00 |
7.25 |
130,500.00 |
5.50 |
99,000.00 |
| 302-02-C-01 |
class ii base course (250 mm thick)(stone or recycled
pcc) |
33,837.5 |
sq m |
25.00 |
845,937.50 |
28.00 |
947,450.00 |
27.00 |
913,612.50 |
31.00 |
1,048,962.50 |
| 302-02-E-01 |
class ii base course (100 mm thick)(stone or recycled
pcc) |
103,726.0 |
sq m |
12.00 |
1,244,712.00 |
14.00 |
1,452,164.00 |
11.00 |
1,140,986.00 |
12.00 |
1,244,712.00 |
| 304-01 |
lime
|
622.00 |
Mg |
100.00 |
62,200.00 |
150.00 |
93,300.00 |
115.00 |
71,530.00 |
140.00 |
87,080.00 |
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
40,423   |
sq m |
1.50 |
60,634.50 |
1.50 |
60,634.50 |
1.60 |
64,676.80 |
1.80 |
72,761.40 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
81   |
cu m |
75.00 |
6,075.00 |
80.00 |
6,480.00 |
85.00 |
6,885.00 |
35.00 |
2,835.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
750.0 |
cu m |
75.00 |
56,250.00 |
65.00 |
48,750.00 |
75.00 |
56,250.00 |
110.00 |
82,500.00 |
| 701-01-F |
cross drain pipe (375 mm rcp/pcp)
|
250.9 |
ln m |
150.00 |
37,635.00 |
200.00 |
50,180.00 |
130.00 |
32,617.00 |
150.00 |
37,635.00 |
| 701-01-I |
cross drain pipe (600 mm rcp/pcp)
|
87.3 |
ln m |
200.00 |
17,460.00 |
250.00 |
21,825.00 |
170.00 |
14,841.00 |
275.00 |
24,007.50 |
| 701-01-K |
cross drain pipe (750 mm rcp/pcp)
|
288.1 |
ln m |
250.00 |
72,025.00 |
275.00 |
79,227.50 |
220.00 |
63,382.00 |
350.00 |
100,835.00 |
| 701-01-M |
cross drain pipe (900 mm rcp/pcp)
|
103.8 |
ln m |
280.00 |
29,064.00 |
335.00 |
34,773.00 |
300.00 |
31,140.00 |
500.00 |
51,900.00 |
| 701-01-N |
cross drain pipe (1050 mm rcp/pcp)
|
141.4 |
ln m |
420.00 |
59,388.00 |
565.00 |
79,891.00 |
350.00 |
49,490.00 |
475.00 |
67,165.00 |
| 701-05-G |
side drain pipe (450 mm rcp)
|
64.0 |
ln m |
160.00 |
10,240.00 |
200.00 |
12,800.00 |
130.00 |
8,320.00 |
150.00 |
9,600.00 |
| 701-05-I |
side drain pipe (600 mm rcp)
|
286.8 |
ln m |
180.00 |
51,624.00 |
250.00 |
71,700.00 |
160.00 |
45,888.00 |
185.00 |
53,058.00 |
| 701-05-I-01 |
side drain pipe (600 mm)(outfall)
|
173.0 |
ln m |
180.00 |
31,140.00 |
260.00 |
44,980.00 |
300.00 |
51,900.00 |
185.00 |
32,005.00 |
| 701-14-A |
cleaning existing pipes/r.c. boxes
|
593.4 |
ln m |
35.00 |
20,769.00 |
65.00 |
38,571.00 |
40.00 |
23,736.00 |
40.00 |
23,736.00 |
| 701-15 |
concrete collar
|
10   |
ea |
600.00 |
6,000.00 |
1,000.00 |
10,000.00 |
750.00 |
7,500.00 |
500.00 |
5,000.00 |
| 702-02-F |
manholes (mh-01)
|
14   |
ea |
3,000.00 |
42,000.00 |
3,500.00 |
49,000.00 |
3,000.00 |
42,000.00 |
3,000.00 |
42,000.00 |
| 702-03-A |
catch basins (cb-01)
|
15   |
ea |
2,400.00 |
36,000.00 |
4,500.00 |
67,500.00 |
2,200.00 |
33,000.00 |
2,500.00 |
37,500.00 |
| 702-03-B |
catch basins (cb-02)
|
6   |
ea |
3,000.00 |
18,000.00 |
5,000.00 |
30,000.00 |
3,200.00 |
19,200.00 |
4,000.00 |
24,000.00 |
| 702-07-A |
cross drain safety end (type 1)
|
7   |
ea |
2,000.00 |
14,000.00 |
3,000.00 |
21,000.00 |
3,500.00 |
24,500.00 |
1,000.00 |
7,000.00 |
| 702-08-A |
side drain safety end (type 1)
|
26   |
ea |
1,300.00 |
33,800.00 |
2,500.00 |
65,000.00 |
1,500.00 |
39,000.00 |
1,000.00 |
26,000.00 |
| 704-03 |
blocked out guard rail
|
419.10 |
ln m |
53.00 |
22,212.30 |
62.00 |
25,984.20 |
53.00 |
22,212.30 |
55.00 |
23,050.50 |
| 704-08-A |
guard rail transitions (single thrie beam)
|
60.96 |
ln m |
120.00 |
7,315.20 |
135.00 |
8,229.60 |
115.00 |
7,010.40 |
125.00 |
7,620.00 |
| 704-11-A |
guard rail end treatment (flared)
|
12   |
ea |
1,800.00 |
21,600.00 |
2,000.00 |
24,000.00 |
1,750.00 |
21,000.00 |
1,850.00 |
22,200.00 |
| 705-02 |
combination mesh & barbed wire fence
|
770   |
ln m |
18.00 |
13,860.00 |
18.00 |
13,860.00 |
16.00 |
12,320.00 |
22.00 |
16,940.00 |
| 705-04 |
single swinging driveway gates
|
3   |
ea |
600.00 |
1,800.00 |
1,500.00 |
4,500.00 |
800.00 |
2,400.00 |
600.00 |
1,800.00 |
| 708-01 |
right-of-way monument
|
54   |
ea |
120.00 |
6,480.00 |
300.00 |
16,200.00 |
130.00 |
7,020.00 |
200.00 |
10,800.00 |
| 708-02 |
right-of-way monument witness post
|
54   |
ea |
120.00 |
6,480.00 |
300.00 |
16,200.00 |
50.00 |
2,700.00 |
100.00 |
5,400.00 |
| 711-01-D |
riprap (25 kg, 460 mm thick)
|
3,555   |
sq m |
65.00 |
231,075.00 |
59.00 |
209,745.00 |
67.00 |
238,185.00 |
50.00 |
177,750.00 |
| 711-04 |
geotextile fabric
|
3,555   |
sq m |
2.00 |
7,110.00 |
3.00 |
10,665.00 |
2.50 |
8,887.50 |
2.00 |
7,110.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
100,000.00 |
100,000.00 |
120,000.00 |
120,000.00 |
92,675.00 |
92,675.00 |
350,000.00 |
350,000.00 |
| 713-04-A |
temporary pavement markings (broken line)(100 mm width)
(1.2 m length) |
0.659 |
km |
800.00 |
527.20 |
600.00 |
395.40 |
295.90 |
195.00 |
300.00 |
197.70 |
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
13.180 |
km |
300.00 |
3,954.00 |
600.00 |
7,908.00 |
497.00 |
6,550.46 |
525.00 |
6,919.50 |
| 716-01-A |
mulch (vegetative)
|
72.2 |
hctr |
1,300.00 |
93,860.00 |
1,700.00 |
122,740.00 |
1,295.00 |
93,499.00 |
1,550.00 |
111,910.00 |
| 717-01 |
seeding
|
2,429   |
kg |
14.00 |
34,006.00 |
18.00 |
43,722.00 |
13.95 |
33,884.55 |
15.00 |
36,435.00 |
| 718-01 |
fertilizer
|
82,886   |
kg |
0.50 |
41,443.00 |
0.90 |
74,597.40 |
0.49 |
40,614.14 |
1.00 |
82,886.00 |
| 718-02 |
agricultural lime
|
325.2 |
Mg |
100.00 |
32,520.00 |
40.00 |
13,008.00 |
85.00 |
27,642.00 |
60.00 |
19,512.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
53,836   |
sq m |
1.30 |
69,986.80 |
1.40 |
75,370.40 |
1.25 |
67,295.00 |
1.30 |
69,986.80 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
6,324   |
sq m |
1.30 |
8,221.20 |
1.60 |
10,118.40 |
1.25 |
7,905.00 |
1.30 |
8,221.20 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
2,691   |
sq m |
1.30 |
3,498.30 |
1.60 |
4,305.60 |
1.25 |
3,363.75 |
1.35 |
3,632.85 |
| 722-02 |
project site laboratory (equipped)
|
1   |
ea |
20,000.00 |
20,000.00 |
28,000.00 |
28,000.00 |
15,000.00 |
15,000.00 |
18,500.00 |
18,500.00 |
| 725-02 |
temporary detour roads
|
1,420.0 |
sq m |
75.00 |
106,500.00 |
58.00 |
82,360.00 |
75.00 |
106,500.00 |
50.00 |
71,000.00 |
| 726-01 |
bedding material
|
864.0 |
cu m |
75.00 |
64,800.00 |
90.00 |
77,760.00 |
60.00 |
51,840.00 |
125.00 |
108,000.00 |
| 727-01 |
mobilization
|
lump |
lump |
1,700,000.00 |
1,700,000.00 |
1,700,000.00 |
1,700,000.00 |
1,850,000.00 |
1,850,000.00 |
800,000.00 |
800,000.00 |
| 728-01-A |
jacked or bored pipe (750 mm rcp)(class iv, wall b or
c) |
46.0 |
ln m |
1,600.00 |
73,600.00 |
1,800.00 |
82,800.00 |
1,645.00 |
75,670.00 |
1,600.00 |
73,600.00 |
| 728-01-B |
jacked or bored pipe (900 mm rcp)(class iv, wall b or
c) |
34.4 |
ln m |
2,000.00 |
68,800.00 |
2,500.00 |
86,000.00 |
2,200.00 |
75,680.00 |
2,200.00 |
75,680.00 |
| 728-01-C |
jacked or bored pipe (1050 mm rcp)(class iv, wall b or
c) |
42.0 |
ln m |
2,500.00 |
105,000.00 |
2,800.00 |
117,600.00 |
2,515.00 |
105,630.00 |
2,500.00 |
105,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
7   |
ea |
70.00 |
490.00 |
75.00 |
525.00 |
70.00 |
490.00 |
76.00 |
532.00 |
| 731-02 |
reflectorized raised pavement markers
|
2,211   |
ea |
4.50 |
9,949.50 |
6.00 |
13,266.00 |
5.40 |
11,939.40 |
6.00 |
13,266.00 |
| 732-01-E |
plastic pavement striping (600 mm width)
|
220   |
ln m |
2.40 |
528.00 |
0.60 |
132.00 |
0.55 |
121.00 |
12.50 |
2,750.00 |
| 732-02-A |
plast pvmt striping(solid line)(100mm width)
|
40.739 |
km |
1,200.00 |
48,886.80 |
1,600.00 |
65,182.40 |
1,495.00 |
60,904.81 |
1,800.00 |
73,330.20 |
| 732-02-C |
plastic pavement striping (solid line)(200 mm width)
|
0.229 |
km |
2,600.00 |
595.40 |
3,200.00 |
732.80 |
2,950.00 |
675.55 |
7,000.00 |
1,603.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
14   |
ea |
150.00 |
2,100.00 |
200.00 |
2,800.00 |
155.00 |
2,170.00 |
300.00 |
4,200.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
7   |
ea |
150.00 |
1,050.00 |
200.00 |
1,400.00 |
165.00 |
1,155.00 |
300.00 |
2,100.00 |
| 732-05 |
removal of existing markings
|
28.615 |
km |
2,000.00 |
57,230.00 |
3,800.00 |
108,737.00 |
3,540.00 |
101,297.10 |
750.00 |
21,461.25 |
| 735-01 |
mailboxes
|
1   |
ea |
1.00 |
1.00 |
25.00 |
25.00 |
10.00 |
10.00 |
15.00 |
15.00 |
| 735-02 |
mailbox supports (single)
|
1   |
ea |
300.00 |
300.00 |
200.00 |
200.00 |
130.00 |
130.00 |
150.00 |
150.00 |
| 740-01 |
construction layout
|
lump |
lump |
200,000.00 |
200,000.00 |
250,000.00 |
250,000.00 |
175,000.00 |
175,000.00 |
350,000.00 |
350,000.00 |
| 744-01 |
traffic control management
|
lump |
lump |
20,000.00 |
20,000.00 |
36,000.00 |
36,000.00 |
10,000.00 |
10,000.00 |
200,000.00 |
200,000.00 |
| 804-01-B |
precast concrete piles (350 mm)
|
1,190.0 |
ln m |
150.00 |
178,500.00 |
160.00 |
190,400.00 |
255.00 |
303,450.00 |
150.00 |
178,500.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
124.95 |
cu m |
1,000.00 |
124,950.00 |
900.00 |
112,455.00 |
1,150.00 |
143,692.50 |
1,000.00 |
124,950.00 |
| 805-01-F |
class a concrete (bents)
|
86.80 |
cu m |
1,000.00 |
86,800.00 |
1,000.00 |
86,800.00 |
1,200.00 |
104,160.00 |
750.00 |
65,100.00 |
| 805-03 |
class aa concrete
|
357.12 |
cu m |
500.00 |
178,560.00 |
675.00 |
241,056.00 |
567.00 |
202,487.04 |
600.00 |
214,272.00 |
| 805-12-A |
reinforced concrete box culverts (1200 mm x 900 mm)
|
150.30 |
ln m |
800.00 |
120,240.00 |
950.00 |
142,785.00 |
900.00 |
135,270.00 |
2,500.00 |
375,750.00 |
| 805-12-E |
reinforced concrete box culverts (1200 mm x 1200 mm)
|
153.20 |
ln m |
840.00 |
128,688.00 |
900.00 |
137,880.00 |
950.00 |
145,540.00 |
2,500.00 |
383,000.00 |
| 805-12-F |
reinforced concrete box culverts (1500 mm x 1200 mm)
|
406.80 |
ln m |
900.00 |
366,120.00 |
1,150.00 |
467,820.00 |
1,100.00 |
447,480.00 |
2,400.00 |
976,320.00 |
| 805-12-G |
reinforced concrete box culverts (1800 mm x 1200 mm)
|
70.50 |
ln m |
1,200.00 |
84,600.00 |
1,500.00 |
105,750.00 |
1,350.00 |
95,175.00 |
2,500.00 |
176,250.00 |
| 805-12-I |
reinforced concrete box culverts (1500 mm x 1500 mm)
|
181.40 |
ln m |
1,100.00 |
199,540.00 |
1,225.00 |
222,215.00 |
1,250.00 |
226,750.00 |
2,400.00 |
435,360.00 |
| 805-12-M |
reinforced concrete box culverts (1800 mm x 1800 mm)
|
235.30 |
ln m |
1,200.00 |
282,360.00 |
1,450.00 |
341,185.00 |
1,500.00 |
352,950.00 |
2,500.00 |
588,250.00 |
| 805-12-O |
reinforced concrete box culverts (2400 mm x 1800 mm)
|
162.20 |
ln m |
1,400.00 |
227,080.00 |
1,850.00 |
300,070.00 |
1,900.00 |
308,180.00 |
2,750.00 |
446,050.00 |
| 806-01 |
deformed reinforcing steel
|
17,223   |
kg |
1.70 |
29,279.10 |
1.60 |
27,556.80 |
1.50 |
25,834.50 |
2.00 |
34,446.00 |
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
35,316   |
kg |
2.00 |
70,632.00 |
1.75 |
61,803.00 |
1.80 |
63,568.80 |
2.25 |
79,461.00 |
| 810-01 |
concrete railing (barrier)
|
144.00 |
ln m |
150.00 |
21,600.00 |
200.00 |
28,800.00 |
280.00 |
40,320.00 |
165.00 |
23,760.00 |
| 813-01 |
concrete approach slabs
|
648.00 |
sq m |
170.00 |
110,160.00 |
175.00 |
113,400.00 |
165.00 |
106,920.00 |
200.00 |
129,600.00 |
| S-001 |
rumble strips (ground-in)
|
19.5 |
km |
700.00 |
13,650.00 |
400.00 |
7,800.00 |
330.00 |
6,435.00 |
700.00 |
13,650.00 |
| S-002 |
removal of s. p. no. 023-06-0047 - transition road
|
lump |
lump |
20,000.00 |
20,000.00 |
12,000.00 |
12,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
| S-101 |
retroreflective sheeting panels
|
lump |
lump |
4,000.00 |
4,000.00 |
1,500.00 |
1,500.00 |
800.00 |
800.00 |
5,000.00 |
5,000.00 |
| S-102 |
slotted drain (750 mm)
|
lump |
lump |
30,000.00 |
30,000.00 |
100,000.00 |
100,000.00 |
70,000.00 |
70,000.00 |
125,000.00 |
125,000.00 |
| | SUBTOTAL GENERAL |
|
|
|
12,266,089.60 |
|
13,607,263.25 |
|
13,494,315.35 |
|
15,320,817.40 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
|
|
|
|
|
|
|
|
|
|
|
| 302-02-G-01 |
class ii base course (200 mm thick)(soil
cement-includes 50 mm thick selected soils) |
103,726.0 |
sq m |
0.00 |
0.00 |
12.00 |
1,244,712.00 |
0.00 |
0.00 |
15.00 |
1,555,890.00 |
| 502-01 |
superpave asphaltic concrete
|
31,533.3 |
Mg |
0.00 |
0.00 |
75.00 |
2,364,997.50 |
0.00 |
0.00 |
73.25 |
2,309,814.22 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
6,542.8 |
Mg |
0.00 |
0.00 |
100.00 |
654,280.00 |
0.00 |
0.00 |
110.00 |
719,708.00 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
20.281 |
km |
0.00 |
0.00 |
625.00 |
12,675.63 |
0.00 |
0.00 |
850.00 |
17,238.85 |
| | SUBTOTAL ALT A1 |
|
|
|
|
|
4,276,665.13 |
|
|
|
4,602,651.07 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
|
|
|
|
|
|
|
|
|
|
|
| 302-02-G-01 |
class ii base course (200 mm thick)(soil
cement-includes 50 mm thick selected soils) |
3,002.3 |
sq m |
12.00 |
36,027.60 |
0.00 |
0.00 |
10.50 |
31,524.15 |
0.00 |
0.00 |
| 302-02-G-02 |
class ii base course (200 mm thick)(soil cement)
|
100,723.7 |
sq m |
9.50 |
956,875.15 |
0.00 |
0.00 |
10.00 |
1,007,237.00 |
0.00 |
0.00 |
| 502-01 |
superpave asphaltic concrete
|
4,083.7 |
Mg |
110.00 |
449,207.00 |
0.00 |
0.00 |
110.00 |
449,207.00 |
0.00 |
0.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
706.5 |
Mg |
250.00 |
176,625.00 |
0.00 |
0.00 |
250.00 |
176,625.00 |
0.00 |
0.00 |
| 601-01-G |
portland cement concrete pavement (200 mm thick)
|
77,871.1 |
sq m |
39.00 |
3,036,972.90 |
0.00 |
0.00 |
42.00 |
3,270,586.20 |
0.00 |
0.00 |
| 601-02-G |
portland cement concrete pavement (200 mm thick)
(crossovers & turnouts) |
16,517.6 |
sq m |
46.80 |
773,023.68 |
0.00 |
0.00 |
58.00 |
958,020.80 |
0.00 |
0.00 |
| 601-04 |
portland cement concrete pavement coring
|
150   |
ea |
100.00 |
15,000.00 |
0.00 |
0.00 |
85.00 |
12,750.00 |
0.00 |
0.00 |
| 732-03-A |
plastic pvmt striping(broken line)(100 mm width)
|
10.898 |
km |
600.00 |
6,538.80 |
0.00 |
0.00 |
572.00 |
6,233.66 |
0.00 |
0.00 |
| 732-03-A-01 |
plastic pvmt striping(broken line)(100 mm width)
(preformed marking tape (type v) |
9.383 |
km |
2,100.00 |
19,704.30 |
0.00 |
0.00 |
2,060.00 |
19,328.98 |
0.00 |
0.00 |
| | SUBTOTAL ALT A2 |
|
|
|
5,469,974.43 |
|
|
|
5,931,512.79 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
17,736,064.03 |
|
17,883,928.38 |
|
19,425,828.14 |
|
19,923,468.47 |
| | Number of Days Bid at $1,000 per day. |
|
|
600 |
600,000.00 |
725 |
725,000.00 |
725 |
725,000.00 |
700 |
700,000.00 |
| | TOTAL BID |
|
|
|
18,336,064.03 |
|
18,608,928.38 |
|
20,150,828.14 |
|
20,623,468.47 |
|