| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DENTON-JAMES LLC |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
BESSETTE DEVELOPMENT CORP. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
450,000.00 |
450,000.00 |
400,000.00 |
400,000.00 |
300,000.00 |
300,000.00 |
16,500.00 |
16,500.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
40,000.00 |
40,000.00 |
75,000.00 |
75,000.00 |
24,000.00 |
24,000.00 |
8,000.00 |
8,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
11,706   |
sq m |
5.00 |
58,530.00 |
5.00 |
58,530.00 |
10.00 |
117,060.00 |
6.50 |
76,089.00 |
| 202-02-D |
removal of concrete walks & drives
|
1,421   |
sq m |
9.00 |
12,789.00 |
4.00 |
5,684.00 |
8.00 |
11,368.00 |
6.25 |
8,881.25 |
| 202-02-G |
removal of surfacing & stabilized base
|
13,070.8 |
sq m |
4.00 |
52,283.20 |
5.00 |
65,354.00 |
7.00 |
91,495.60 |
7.50 |
98,031.00 |
| 202-02-01 |
removal of pavement widening
|
3,270   |
sq m |
4.00 |
13,080.00 |
5.00 |
16,350.00 |
11.00 |
35,970.00 |
15.50 |
50,685.00 |
| 202-02-02 |
removal of 4.35 m x 6.63 m wood shed (lt. of sta.
95+75) |
1   |
each |
1.00 |
1.00 |
100.00 |
100.00 |
1,500.00 |
1,500.00 |
150.00 |
150.00 |
| 202-02-03 |
removal of underground storage tanks (lt. of sta.
98+90)(1-1,000 and 1-2,000 gal. tanks) |
2   |
each |
3,500.00 |
7,000.00 |
3,000.00 |
6,000.00 |
6,000.00 |
12,000.00 |
10,500.00 |
21,000.00 |
| 202-02-04 |
removal of 14.74 m x 8.03 m wood frame commercial
building (lt. of sta. 98+95) |
1   |
each |
1.00 |
1.00 |
100.00 |
100.00 |
5,000.00 |
5,000.00 |
1,100.00 |
1,100.00 |
| 202-02-05 |
removal of underground storage tanks (lt. of sta.
101+75)(1-500, 2-1,000, 1-3,000 and 1-5000 gal. tanks) |
5   |
each |
4,500.00 |
22,500.00 |
2,300.00 |
11,500.00 |
6,000.00 |
30,000.00 |
10,500.00 |
52,500.00 |
| 202-02-06 |
removal of 52.14 m x 15.58 m concrete block commercial
building (lt. of sta. 101+75)(contains non-friable asbestos) |
1   |
each |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
30,000.00 |
30,000.00 |
9,100.00 |
9,100.00 |
| 202-02-07 |
removal of 3.15 m metal billboard (lt. of sta. 307+14)
|
1   |
each |
1.00 |
1.00 |
1.00 |
1.00 |
200.00 |
200.00 |
150.00 |
150.00 |
| 202-02-08 |
removal of 13 m x 13.9 m wood frame residence (lt. of
sta. 313+50) |
1   |
each |
1.00 |
1.00 |
500.00 |
500.00 |
5,000.00 |
5,000.00 |
3,250.00 |
3,250.00 |
| 202-02-09 |
removal of 20.48 m x 15.36 m brick residence (lt. of
sta. 316+00)(contains friable and non-friable asbestos) |
1   |
each |
1.00 |
1.00 |
500.00 |
500.00 |
20,000.00 |
20,000.00 |
40,000.00 |
40,000.00 |
| 202-02-10 |
removal of 22.57 m x 13.11 m brick residence (lt. of
sta. 317+50) |
1   |
each |
1.00 |
1.00 |
500.00 |
500.00 |
20,000.00 |
20,000.00 |
6,200.00 |
6,200.00 |
| 202-02-11 |
removal of 3.06 m x 5.3 m wood shed (lt. of sta.
316+25) |
1   |
each |
1.00 |
1.00 |
100.00 |
100.00 |
400.00 |
400.00 |
250.00 |
250.00 |
| 202-05 |
excavation, disposal and backfilling of contaminated
soil |
76   |
cu m |
200.00 |
15,200.00 |
117.00 |
8,892.00 |
300.00 |
22,800.00 |
100.00 |
7,600.00 |
| 202-06 |
removal and disposal of contaminated fluid
|
9,464   |
l |
0.30 |
2,839.20 |
0.30 |
2,839.20 |
0.60 |
5,678.40 |
0.25 |
2,366.00 |
| 203-01 |
general excavation
|
45,426   |
cu m |
7.00 |
317,982.00 |
5.80 |
263,470.80 |
8.00 |
363,408.00 |
9.05 |
411,105.30 |
| 203-03 |
muck excavation
|
1,000   |
cu m |
12.00 |
12,000.00 |
12.00 |
12,000.00 |
12.00 |
12,000.00 |
10.00 |
10,000.00 |
| 203-04 |
embankment
|
21,285   |
cu m |
12.00 |
255,420.00 |
9.50 |
202,207.50 |
24.00 |
510,840.00 |
14.10 |
300,118.50 |
| 203-05-A |
nonplastic embankment (stone)
|
523   |
cu m |
150.00 |
78,450.00 |
110.00 |
57,530.00 |
140.00 |
73,220.00 |
130.50 |
68,251.50 |
| 203-07 |
excavation & embankment
|
70   |
ln m |
50.00 |
3,500.00 |
100.00 |
7,000.00 |
12.00 |
840.00 |
60.00 |
4,200.00 |
| 204-02 |
temporary hay or straw bales
|
525   |
ea |
6.50 |
3,412.50 |
20.00 |
10,500.00 |
15.00 |
7,875.00 |
8.50 |
4,462.50 |
| 204-06 |
temporary silt fencing
|
1,954   |
ln m |
3.50 |
6,839.00 |
8.00 |
15,632.00 |
6.00 |
11,724.00 |
5.25 |
10,258.50 |
| 302-02-A-01 |
class ii base course (150 mm thick)(stone or recycled
pcc) |
2,620.6 |
sq m |
19.00 |
49,791.40 |
15.00 |
39,309.00 |
23.00 |
60,273.80 |
18.00 |
47,170.80 |
| 304-05-D |
lime treatment (type e)(300 mm thick)
|
289.26 |
Mg |
270.00 |
78,100.20 |
260.00 |
75,207.60 |
325.00 |
94,009.50 |
520.00 |
150,415.20 |
| 305-01-D-01 |
subgrade layer (300mm thick)(cement treated)
|
57,974   |
sq m |
7.80 |
452,197.20 |
9.00 |
521,766.00 |
10.00 |
579,740.00 |
11.00 |
637,714.00 |
| 401-01 |
aggregate surface course (net section)
|
323.5 |
cu m |
70.00 |
22,645.00 |
90.00 |
29,115.00 |
125.00 |
40,437.50 |
110.00 |
35,585.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,700.0 |
cu m |
80.00 |
136,000.00 |
85.00 |
144,500.00 |
60.00 |
102,000.00 |
105.00 |
178,500.00 |
| 509-01 |
cold planing asphaltic pavement
|
5,031   |
sq m |
3.30 |
16,602.30 |
3.00 |
15,093.00 |
5.00 |
25,155.00 |
2.75 |
13,835.25 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 203   |
cu m |
0.01 |
- 2.03 |
0.10 |
- 20.30 |
1.00 |
- 203.00 |
1.00 |
- 203.00 |
| 701-01-I |
cross drain pipe (600 mm rcp)
|
79.6 |
ln m |
190.00 |
15,124.00 |
210.00 |
16,716.00 |
200.00 |
15,920.00 |
270.50 |
21,531.80 |
| 701-01-N |
cross drain pipe (1050 mm rcp)
|
34.2 |
ln m |
410.00 |
14,022.00 |
510.00 |
17,442.00 |
385.00 |
13,167.00 |
515.50 |
17,630.10 |
| 701-03-F |
storm drain pipe (375 mm rcp/pcp)
|
285.4 |
ln m |
230.00 |
65,642.00 |
125.00 |
35,675.00 |
200.00 |
57,080.00 |
80.00 |
22,832.00 |
| 701-03-G |
storm drain pipe (450 mm rcp/pcp)
|
481.7 |
ln m |
170.00 |
81,889.00 |
140.00 |
67,438.00 |
205.00 |
98,748.50 |
93.50 |
45,038.95 |
| 701-03-I |
storm drain pipe (600 mm rcp/pcp)
|
730.9 |
ln m |
210.00 |
153,489.00 |
210.00 |
153,489.00 |
250.00 |
182,725.00 |
135.00 |
98,671.50 |
| 701-03-K |
storm drain pipe (750 mm rcp/pcp)
|
488.6 |
ln m |
250.00 |
122,150.00 |
250.00 |
122,150.00 |
300.00 |
146,580.00 |
175.00 |
85,505.00 |
| 701-03-M |
storm drain pipe (900 mm rcp/pcp)
|
1,207.9 |
ln m |
320.00 |
386,528.00 |
400.00 |
483,160.00 |
350.00 |
422,765.00 |
230.50 |
278,420.95 |
| 701-03-N |
storm drain pipe (1050 mm rcp/pcp)
|
592.5 |
ln m |
400.00 |
237,000.00 |
450.00 |
266,625.00 |
430.00 |
254,775.00 |
280.00 |
165,900.00 |
| 701-03-O |
storm drain pipe (1200 mm rcp/pcp)
|
209.6 |
ln m |
450.00 |
94,320.00 |
510.00 |
106,896.00 |
500.00 |
104,800.00 |
335.00 |
70,216.00 |
| 701-03-O-01 |
storm drain pipe (1200 mm pcp)(outfall)
|
28.0 |
ln m |
560.00 |
15,680.00 |
590.00 |
16,520.00 |
550.00 |
15,400.00 |
255.00 |
7,140.00 |
| 701-03-Q-01 |
storm drain pipe (1500 mm pcp)(outfall)
|
69.5 |
ln m |
740.00 |
51,430.00 |
1,000.00 |
69,500.00 |
600.00 |
41,700.00 |
430.00 |
29,885.00 |
| 701-05-M |
side drain pipe (900 mm)
|
11.0 |
ln m |
250.00 |
2,750.00 |
370.00 |
4,070.00 |
400.00 |
4,400.00 |
310.00 |
3,410.00 |
| 701-05-N |
side drain pipe (1050 mm)
|
53.6 |
ln m |
340.00 |
18,224.00 |
410.00 |
21,976.00 |
485.00 |
25,996.00 |
440.00 |
23,584.00 |
| 701-05-O |
side drain pipe (1200 mm)
|
9.8 |
ln m |
450.00 |
4,410.00 |
540.00 |
5,292.00 |
550.00 |
5,390.00 |
600.00 |
5,880.00 |
| 701-07-C |
yard drain pipe (200 mm)
|
106.0 |
ln m |
100.00 |
10,600.00 |
350.00 |
37,100.00 |
125.00 |
13,250.00 |
63.25 |
6,704.50 |
| 702-02-F |
manholes (mh-01m)
|
2   |
ea |
4,000.00 |
8,000.00 |
3,500.00 |
7,000.00 |
5,000.00 |
10,000.00 |
4,950.00 |
9,900.00 |
| 702-03-A |
catch basins (cb-01m)
|
47   |
ea |
2,300.00 |
108,100.00 |
2,800.00 |
131,600.00 |
3,500.00 |
164,500.00 |
2,265.00 |
106,455.00 |
| 702-03-C |
catch basins (cb-06m)
|
68   |
ea |
3,600.00 |
244,800.00 |
4,300.00 |
292,400.00 |
4,000.00 |
272,000.00 |
3,275.00 |
222,700.00 |
| 702-03-D |
catch basins (cb-07m)
|
3   |
ea |
4,000.00 |
12,000.00 |
5,000.00 |
15,000.00 |
5,000.00 |
15,000.00 |
3,100.00 |
9,300.00 |
| 702-03-F |
catch basins (cb-08m)
|
17   |
ea |
6,400.00 |
108,800.00 |
7,500.00 |
127,500.00 |
8,000.00 |
136,000.00 |
5,680.00 |
96,560.00 |
| 702-03-I |
catch basins (cb-062)
|
1   |
ea |
3,000.00 |
3,000.00 |
2,500.00 |
2,500.00 |
2,400.00 |
2,400.00 |
6,500.00 |
6,500.00 |
| 702-04-A |
adjusting manholes
|
4   |
ea |
800.00 |
3,200.00 |
700.00 |
2,800.00 |
1,200.00 |
4,800.00 |
1,150.00 |
4,600.00 |
| 705-01 |
barbed wire fence
|
483   |
ln m |
16.00 |
7,728.00 |
30.00 |
14,490.00 |
20.00 |
9,660.00 |
17.25 |
8,331.75 |
| 705-05 |
double swinging driveway gates
|
1   |
dbgt |
800.00 |
800.00 |
600.00 |
600.00 |
750.00 |
750.00 |
900.00 |
900.00 |
| 705-06-A |
chain link fence (1200 mm height)
|
103   |
ln m |
44.00 |
4,532.00 |
55.00 |
5,665.00 |
60.00 |
6,180.00 |
47.50 |
4,892.50 |
| 705-07-A |
1.2192-meter single gates for chain link fence (1200mm
height) |
1   |
ea |
500.00 |
500.00 |
800.00 |
800.00 |
850.00 |
850.00 |
550.00 |
550.00 |
| 705-08-A |
1.2192-meter double gates for chain link fence (1200mm
height) |
2   |
dbgt |
800.00 |
1,600.00 |
1,200.00 |
2,400.00 |
1,200.00 |
2,400.00 |
875.00 |
1,750.00 |
| 705-09 |
rebuilt fence
|
141   |
ln m |
120.00 |
16,920.00 |
45.00 |
6,345.00 |
100.00 |
14,100.00 |
195.00 |
27,495.00 |
| 706-01-A |
concrete walk (100 mm thick)
|
14.3 |
sq m |
80.00 |
1,144.00 |
120.00 |
1,716.00 |
145.00 |
2,073.50 |
60.50 |
865.15 |
| 706-02-C |
concrete drive (150 mm thick)
|
2,423.5 |
sq m |
55.00 |
133,292.50 |
50.00 |
121,175.00 |
50.00 |
121,175.00 |
75.75 |
183,580.12 |
| 706-02-D |
concrete drive (200 mm thick)
|
841.2 |
sq m |
60.00 |
50,472.00 |
65.00 |
54,678.00 |
60.00 |
50,472.00 |
84.75 |
71,291.70 |
| 708-01 |
right-of-way monument
|
47   |
ea |
120.00 |
5,640.00 |
150.00 |
7,050.00 |
300.00 |
14,100.00 |
430.00 |
20,210.00 |
| 708-02 |
right-of-way monument witness post
|
12   |
ea |
120.00 |
1,440.00 |
150.00 |
1,800.00 |
300.00 |
3,600.00 |
335.00 |
4,020.00 |
| 709-01 |
steel cattle guard
|
1   |
ea |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
3,000.00 |
3,000.00 |
2,000.10 |
2,000.10 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
70,000.00 |
70,000.00 |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
68,000.00 |
68,000.00 |
| 713-04-A |
temporary pavement markings (broken line)(100 mm width)
(1.2 m length) |
2.200 |
km |
2,000.00 |
4,400.00 |
300.00 |
660.00 |
550.00 |
1,210.00 |
2,500.00 |
5,500.00 |
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
15.726 |
km |
280.00 |
4,403.28 |
300.00 |
4,717.80 |
350.00 |
5,504.10 |
300.00 |
4,717.80 |
| 716-01-A |
mulch (vegetative)
|
5.8 |
hctr |
1,300.00 |
7,540.00 |
3,000.00 |
17,400.00 |
1,800.00 |
10,440.00 |
3,155.00 |
18,299.00 |
| 717-01 |
seeding
|
386   |
kg |
13.00 |
5,018.00 |
15.00 |
5,790.00 |
16.00 |
6,176.00 |
15.50 |
5,983.00 |
| 718-01 |
fertilizer
|
6,460   |
kg |
0.40 |
2,584.00 |
0.75 |
4,845.00 |
0.70 |
4,522.00 |
0.75 |
4,845.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
27,760   |
sq m |
1.30 |
36,088.00 |
1.25 |
34,700.00 |
1.40 |
38,864.00 |
1.35 |
37,476.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
ea |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
24,000.00 |
24,000.00 |
14,000.00 |
14,000.00 |
| 724-01-B |
pavement patching (300 mm minimum thickness)
|
396   |
sq m |
80.00 |
31,680.00 |
100.00 |
39,600.00 |
125.00 |
49,500.00 |
116.50 |
46,134.00 |
| 725-02 |
temporary detour roads
|
2,246.4 |
sq m |
55.00 |
123,552.00 |
75.00 |
168,480.00 |
75.00 |
168,480.00 |
60.50 |
135,907.20 |
| 726-01 |
bedding material
|
540.0 |
cu m |
70.00 |
37,800.00 |
88.00 |
47,520.00 |
85.00 |
45,900.00 |
107.50 |
58,050.00 |
| 727-01 |
mobilization
|
lump |
lump |
900,000.00 |
900,000.00 |
970,000.00 |
970,000.00 |
1,000,000.00 |
1,000,000.00 |
285,000.00 |
285,000.00 |
| 729-19-A |
dead end road installations (type a)
|
4   |
each |
1,400.00 |
5,600.00 |
1,350.00 |
5,400.00 |
1,600.00 |
6,400.00 |
1,465.00 |
5,860.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,790   |
ea |
4.50 |
8,055.00 |
4.50 |
8,055.00 |
6.00 |
10,740.00 |
4.90 |
8,771.00 |
| 732-01-E |
plastic pavement striping (600 mm width)
|
1,300   |
ln m |
8.00 |
10,400.00 |
8.00 |
10,400.00 |
10.00 |
13,000.00 |
8.55 |
11,115.00 |
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
11.743 |
km |
1,200.00 |
14,091.60 |
1,150.00 |
13,504.45 |
1,500.00 |
17,614.50 |
1,235.00 |
14,502.60 |
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
7   |
ea |
130.00 |
910.00 |
125.00 |
875.00 |
200.00 |
1,400.00 |
135.50 |
948.50 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
7   |
ea |
130.00 |
910.00 |
125.00 |
875.00 |
200.00 |
1,400.00 |
135.50 |
948.50 |
| 732-05 |
removal of existing markings
|
4.639 |
km |
2,000.00 |
9,278.00 |
2,000.00 |
9,278.00 |
3,200.00 |
14,844.80 |
2,115.00 |
9,811.48 |
| 735-02 |
mailbox supports (single)
|
2   |
ea |
250.00 |
500.00 |
135.00 |
270.00 |
200.00 |
400.00 |
150.00 |
300.00 |
| 736-01 |
trenching and backfilling
|
6   |
ln m |
20.00 |
120.00 |
30.00 |
180.00 |
22.00 |
132.00 |
33.00 |
198.00 |
| 736-04-B |
signal supports (9 m steel strain pole)
|
2   |
each |
8,100.00 |
16,200.00 |
10,000.00 |
20,000.00 |
9,000.00 |
18,000.00 |
11,575.00 |
23,150.00 |
| 736-05-A-01 |
signal heads (retrofitted with led's)(1 section r
300 mm lens) |
4   |
each |
350.00 |
1,400.00 |
575.00 |
2,300.00 |
400.00 |
1,600.00 |
625.00 |
2,500.00 |
| 736-05-A-02 |
signal heads (retrofitted with led's)(1 section y
300 mm lens) |
4   |
each |
500.00 |
2,000.00 |
575.00 |
2,300.00 |
550.00 |
2,200.00 |
625.00 |
2,500.00 |
| 736-06-A |
signal service (pedestal mounted)
|
1   |
ea |
2,500.00 |
2,500.00 |
1,500.00 |
1,500.00 |
2,800.00 |
2,800.00 |
1,650.00 |
1,650.00 |
| 736-08-A |
signal controller (signal flasher controller)
|
1   |
ea |
7,600.00 |
7,600.00 |
1,800.00 |
1,800.00 |
8,500.00 |
8,500.00 |
1,900.00 |
1,900.00 |
| 736-10-A |
underground junction box (type e)
|
1   |
ea |
650.00 |
650.00 |
645.00 |
645.00 |
750.00 |
750.00 |
700.00 |
700.00 |
| 736-11-A |
conduit (25 mm pec)
|
6   |
ln m |
10.00 |
60.00 |
60.00 |
360.00 |
11.00 |
66.00 |
70.00 |
420.00 |
| 736-12-A |
conductor, 3c (power)
|
6   |
ln m |
10.00 |
60.00 |
15.00 |
90.00 |
10.00 |
60.00 |
15.00 |
90.00 |
| 736-12-B |
conductor, 3c (signal - #14 awg, stranded)
|
81   |
ln m |
6.00 |
486.00 |
20.00 |
1,620.00 |
6.00 |
486.00 |
21.00 |
1,701.00 |
| 740-01 |
construction layout
|
lump |
lump |
160,000.00 |
160,000.00 |
100,000.00 |
100,000.00 |
125,000.00 |
125,000.00 |
25,000.00 |
25,000.00 |
| 741-09 |
adjusting water house connections
|
6   |
ea |
600.00 |
3,600.00 |
200.00 |
1,200.00 |
500.00 |
3,000.00 |
525.00 |
3,150.00 |
| 741-10 |
adjusting water service lines
|
30   |
ln m |
100.00 |
3,000.00 |
16.50 |
495.00 |
65.00 |
1,950.00 |
29.50 |
885.00 |
| 741-11 |
adjusting water valve and meter box
|
3   |
ea |
500.00 |
1,500.00 |
750.00 |
2,250.00 |
500.00 |
1,500.00 |
400.00 |
1,200.00 |
| 742-01-C |
sanitary sewer pipe (200 mm)
|
60   |
ln m |
150.00 |
9,000.00 |
165.00 |
9,900.00 |
200.00 |
12,000.00 |
90.00 |
5,400.00 |
| 742-01-E-01 |
sanitary sewer pipe (300 mm)(ductile iron pipe)
|
26   |
ln m |
450.00 |
11,700.00 |
1,300.00 |
33,800.00 |
425.00 |
11,050.00 |
190.00 |
4,940.00 |
| 742-02 |
adjusting sanitary sewer house connections
|
10   |
ea |
700.00 |
7,000.00 |
500.00 |
5,000.00 |
600.00 |
6,000.00 |
650.00 |
6,500.00 |
| 742-03 |
adjusting sanitary sewer service lines
|
50   |
ln m |
100.00 |
5,000.00 |
33.00 |
1,650.00 |
100.00 |
5,000.00 |
50.00 |
2,500.00 |
| 744-01 |
traffic control management
|
lump |
lump |
10,000.00 |
10,000.00 |
7,000.00 |
7,000.00 |
40,000.00 |
40,000.00 |
200,000.00 |
200,000.00 |
| S-001 |
rumble strips (ground-in)
|
2.2 |
km |
1,400.00 |
3,080.00 |
1,200.00 |
2,640.00 |
2,400.00 |
5,280.00 |
2,500.00 |
5,500.00 |
| S-002 |
riser (galvanized steel, 50 mm diameter)
|
1   |
each |
1,900.00 |
1,900.00 |
1,460.00 |
1,460.00 |
2,200.00 |
2,200.00 |
1,600.00 |
1,600.00 |
| | SUBTOTAL GENERAL |
|
|
|
5,642,059.35 |
|
5,874,889.05 |
|
6,617,518.20 |
|
4,965,170.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
|
|
|
|
|
|
|
|
|
|
|
| 302-02-E-01 |
class ii base course (200 mm thick)(stone or recycled
pcc) |
52,299.5 |
sq m |
18.00 |
941,391.00 |
20.00 |
1,045,990.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 302-02-F-01 |
class ii base course (225 mm thick)(stone or recycled
pcc) |
2,822.0 |
sq m |
24.00 |
67,728.00 |
22.00 |
62,084.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 502-01 |
superpave asphaltic concrete
|
2,269.2 |
Mg |
75.00 |
170,190.00 |
76.00 |
172,459.20 |
0.00 |
0.00 |
0.00 |
0.00 |
| 502-01-A |
superpave asphaltic concrete (drives, turnouts and
miscellaneous) |
145.1 |
Mg |
150.00 |
21,765.00 |
82.00 |
11,898.20 |
0.00 |
0.00 |
0.00 |
0.00 |
| 601-01-G |
portland cement concrete pavement (200 mm thick)
|
47,931.6 |
sq m |
47.00 |
2,252,785.20 |
51.00 |
2,444,511.60 |
0.00 |
0.00 |
0.00 |
0.00 |
| 601-02-G |
portland cement concrete pavement (200 mm thick)
(crossovers & turnouts) |
1,733.2 |
sq m |
62.00 |
107,458.40 |
90.00 |
155,988.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 601-04 |
portland cement concrete pavement coring
|
13   |
ea |
100.00 |
1,300.00 |
175.00 |
2,275.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 703-03 |
perforated pipe underdrains
|
4,084   |
ln m |
29.00 |
118,436.00 |
48.00 |
196,032.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 707-01 |
concrete curb
|
4,147.1 |
ln m |
12.00 |
49,765.20 |
45.00 |
186,619.50 |
0.00 |
0.00 |
0.00 |
0.00 |
| 732-03-A-01 |
plastic pvmt striping(broken line)(100mm width)
(preformed marking tape - type v) |
5.529 |
km |
2,400.00 |
13,269.60 |
3,000.00 |
16,587.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| | SUBTOTAL ALT A1 |
|
|
|
3,744,088.40 |
|
4,294,444.50 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
|
|
|
|
|
|
|
|
|
|
|
| 302-02-E-01 |
class ii base course (200 mm thick)(stone or recycled
pcc) |
841.2 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
29.00 |
24,394.80 |
23.25 |
19,557.90 |
| 302-02-F-01 |
class ii base course (225 mm thick)(stone or recycled
pcc) |
50,718.0 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
30.00 |
1,521,540.00 |
26.05 |
1,321,203.90 |
| 502-01 |
superpave asphaltic concrete
|
20,993.4 |
Mg |
0.00 |
0.00 |
0.00 |
0.00 |
78.00 |
1,637,485.20 |
73.75 |
1,548,263.25 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
857.9 |
Mg |
0.00 |
0.00 |
0.00 |
0.00 |
120.00 |
102,948.00 |
79.00 |
67,774.10 |
| 703-03 |
perforated pipe underdrains
|
4,105   |
ln m |
0.00 |
0.00 |
0.00 |
0.00 |
30.00 |
123,150.00 |
32.00 |
131,360.00 |
| 707-03 |
combination concrete curb & gutter
|
4,147.7 |
ln m |
0.00 |
0.00 |
0.00 |
0.00 |
70.00 |
290,339.00 |
58.25 |
241,603.52 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
5.529 |
km |
0.00 |
0.00 |
0.00 |
0.00 |
550.00 |
3,040.95 |
1,355.00 |
7,491.79 |
| | SUBTOTAL ALT A2 |
|
|
|
|
|
|
|
3,702,897.95 |
|
3,337,254.46 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
9,386,147.75 |
|
10,169,333.55 |
|
10,320,416.15 |
|
IRREGULAR |
| | Number of Days Bid at $1,000 per day. |
|
|
400 |
400,000.00 |
400 |
400,000.00 |
400 |
400,000.00 |
400 |
400,000.00 |
| | TOTAL BID |
|
|
|
9,786,147.75 |
|
10,569,333.55 |
|
10,720,416.15 |
|
IRREGULAR |
|