| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - D & J CONSTRUCTION CO., INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
50,000.00 |
50,000.00 |
40,000.00 |
40,000.00 |
25,000.00 |
25,000.00 |
|
|
| 202-02-H |
removal of guard rail
|
351   |
LNFT |
12.00 |
4,212.00 |
5.00 |
1,755.00 |
55.00 |
19,305.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
2,593   |
CUYD |
20.00 |
51,860.00 |
20.00 |
51,860.00 |
20.00 |
51,860.00 |
|
|
| 204-06 |
temporary silt fencing
|
100   |
LNFT |
2.00 |
200.00 |
8.00 |
800.00 |
15.00 |
1,500.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
7,509.3 |
TON |
75.00 |
563,197.50 |
75.00 |
563,197.50 |
85.00 |
638,290.50 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
392.1 |
TON |
120.00 |
47,052.00 |
150.00 |
58,815.00 |
160.00 |
62,736.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
49,249   |
SQYD |
5.00 |
246,245.00 |
5.00 |
246,245.00 |
3.00 |
147,747.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,804   |
CUYD |
1.00 |
- 1,804.00 |
0.10 |
- 180.40 |
0.01 |
- 18.04 |
|
|
| 701-02-H |
cross drain pipe arch (48" equiv. cmpa)
|
170   |
LNFT |
150.00 |
25,500.00 |
230.00 |
39,100.00 |
250.00 |
42,500.00 |
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
4   |
LNFT |
400.00 |
1,600.00 |
158.00 |
632.00 |
550.00 |
2,200.00 |
|
|
| 701-13-F |
corrugated metal pipe arch (extension)(36" equiv.)
|
80   |
LNFT |
200.00 |
16,000.00 |
263.00 |
21,040.00 |
175.00 |
14,000.00 |
|
|
| 701-15 |
concrete collar
|
9   |
EACH |
1,200.00 |
10,800.00 |
1,500.00 |
13,500.00 |
1,500.00 |
13,500.00 |
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
150.0 |
LNFT |
60.00 |
9,000.00 |
55.00 |
8,250.00 |
55.00 |
8,250.00 |
|
|
| 704-03 |
blocked out guard rail
|
25.0 |
LNFT |
22.00 |
550.00 |
26.00 |
650.00 |
22.00 |
550.00 |
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
12.5 |
LNFT |
100.00 |
1,250.00 |
125.00 |
1,562.50 |
100.00 |
1,250.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,000.00 |
4,000.00 |
2,500.00 |
5,000.00 |
2,200.00 |
4,400.00 |
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
93.3 |
SQYD |
100.00 |
9,330.00 |
78.00 |
7,277.40 |
80.00 |
7,464.00 |
|
|
| 710-01 |
flowable fill
|
80   |
CUYD |
100.00 |
8,000.00 |
110.00 |
8,800.00 |
120.00 |
9,600.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
12,000.00 |
12,000.00 |
40,000.00 |
40,000.00 |
150,000.00 |
150,000.00 |
|
|
| 713-03-A |
temporary pavement markings (4" width)
|
1,400   |
LNFT |
0.12 |
168.00 |
0.13 |
182.00 |
1.50 |
2,100.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
2,814   |
LNFT |
0.22 |
619.08 |
0.26 |
731.64 |
2.50 |
7,035.00 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
1,224   |
LNFT |
0.74 |
905.76 |
0.79 |
966.96 |
4.50 |
5,508.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
6.425 |
MILE |
300.00 |
1,927.50 |
175.00 |
1,124.38 |
150.00 |
963.75 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.137 |
MILE |
400.00 |
2,454.80 |
325.00 |
1,994.53 |
400.00 |
2,454.80 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
12.850 |
MILE |
800.00 |
10,280.00 |
655.00 |
8,416.75 |
1.00 |
12.85 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
38   |
EACH |
60.00 |
2,280.00 |
65.00 |
2,470.00 |
350.00 |
13,300.00 |
|
|
| 713-06-B |
temporary pavement legends and symbols (double arrow)
|
4   |
EACH |
75.00 |
300.00 |
78.00 |
312.00 |
600.00 |
2,400.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
20   |
EACH |
75.00 |
1,500.00 |
78.00 |
1,560.00 |
550.00 |
11,000.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
2,500   |
SQYD |
2.00 |
5,000.00 |
1.64 |
4,100.00 |
2.50 |
6,250.00 |
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
300   |
SQYD |
90.00 |
27,000.00 |
100.00 |
30,000.00 |
100.00 |
30,000.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
817   |
SQYD |
100.00 |
81,700.00 |
116.00 |
94,772.00 |
110.00 |
89,870.00 |
|
|
| 724-01-C |
pavement patching (18" minimum thickness)
|
1,400   |
SQYD |
90.00 |
126,000.00 |
130.00 |
182,000.00 |
125.00 |
175,000.00 |
|
|
| 724-03 |
pavement joint repair
|
20.0 |
TON |
650.00 |
13,000.00 |
350.00 |
7,000.00 |
500.00 |
10,000.00 |
|
|
| 726-01 |
bedding material
|
98.2 |
CUYD |
85.00 |
8,347.00 |
85.00 |
8,347.00 |
80.00 |
7,856.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
160,000.00 |
160,000.00 |
75,000.00 |
75,000.00 |
185,000.00 |
185,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
90.00 |
360.00 |
100.00 |
400.00 |
75.00 |
300.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
424   |
EACH |
5.00 |
2,120.00 |
6.00 |
2,544.00 |
20.00 |
8,480.00 |
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
973   |
LNFT |
0.50 |
486.50 |
0.52 |
505.96 |
6.00 |
5,838.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,507   |
LNFT |
1.00 |
1,507.00 |
0.79 |
1,190.53 |
6.00 |
9,042.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
612   |
LNFT |
3.00 |
1,836.00 |
3.15 |
1,927.80 |
8.00 |
4,896.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.425 |
MILE |
2,000.00 |
12,850.00 |
2,200.00 |
14,135.00 |
3,900.00 |
25,057.50 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.069 |
MILE |
800.00 |
2,455.20 |
1,000.00 |
3,069.00 |
2,100.00 |
6,444.90 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
19   |
EACH |
200.00 |
3,800.00 |
200.00 |
3,800.00 |
550.00 |
10,450.00 |
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
2   |
EACH |
200.00 |
400.00 |
200.00 |
400.00 |
800.00 |
1,600.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
10   |
EACH |
200.00 |
2,000.00 |
200.00 |
2,000.00 |
550.00 |
5,500.00 |
|
|
| 732-04-F |
plastic pavement legends & symbols (yield line)
|
8   |
EACH |
350.00 |
2,800.00 |
400.00 |
3,200.00 |
550.00 |
4,400.00 |
|
|
| 736-09 |
loop detector
|
2,066   |
LNFT |
20.00 |
41,320.00 |
25.00 |
51,650.00 |
20.00 |
41,320.00 |
|
|
| 739-01 |
hydro-seeding
|
2.00 |
ACRE |
1,000.00 |
2,000.00 |
1,200.00 |
2,400.00 |
1,200.00 |
2,400.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
12,000.00 |
12,000.00 |
17,000.00 |
17,000.00 |
15,000.00 |
15,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
45,000.00 |
45,000.00 |
|
|
| S-001 |
sawcuts in asphaltic concrete lifts
|
21,148   |
LNFT |
0.80 |
16,918.40 |
1.00 |
21,148.00 |
1.00 |
21,148.00 |
|
|
| S-002 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
3,210   |
LNFT |
1.50 |
4,815.00 |
1.50 |
4,815.00 |
1.40 |
4,494.00 |
|
|
| S-003 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
17,938   |
LNFT |
1.50 |
26,907.00 |
1.65 |
29,597.70 |
1.40 |
25,113.20 |
|
|
| S-004 |
open box culvert safety treatment
|
1   |
EACH |
8,000.00 |
8,000.00 |
27,000.00 |
27,000.00 |
5,500.00 |
5,500.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,663,049.74 |
|
1,729,064.25 |
|
1,990,868.46 |
|
|
|