| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GUINN BROTHERS, LLC. |
- 2 - C W & W CONTRACTORS, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta.105+00; 18.8' wide x 206' long
timber bridge with wing walls) |
1   |
EACH |
15,000.00 |
15,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
18,000.00 |
18,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
20   |
EACH |
1.00 |
20.00 |
10.00 |
200.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
70   |
LNFT |
1.00 |
70.00 |
6.00 |
420.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
1.00 |
4.00 |
125.00 |
500.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
150   |
LNFT |
1.00 |
150.00 |
3.00 |
450.00 |
|
|
|
|
| 302-01-A |
class ii base course( stone or asphaltic concrete)
|
101.2 |
CUYD |
90.00 |
9,108.00 |
90.00 |
9,108.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
99.4 |
TON |
200.00 |
19,880.00 |
175.00 |
17,395.00 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
66   |
LNFT |
50.00 |
3,300.00 |
50.00 |
3,300.00 |
|
|
|
|
| 701-05-G-01 |
side drain pipe (18")(erosion)
|
136   |
LNFT |
50.00 |
6,800.00 |
50.00 |
6,800.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
3,000.00 |
3,000.00 |
4,500.00 |
4,500.00 |
|
|
|
|
| 711-01-D |
riprap (55 lb,18"thick)
|
632   |
SQYD |
55.00 |
34,760.00 |
60.00 |
37,920.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
632   |
SQYD |
5.00 |
3,160.00 |
3.00 |
1,896.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
12,000.00 |
12,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
165   |
SQYD |
10.00 |
1,650.00 |
3.00 |
495.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
40,000.00 |
40,000.00 |
45,000.00 |
45,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
100.00 |
400.00 |
80.00 |
320.00 |
|
|
|
|
| 735-01 |
mailboxes
|
1   |
EACH |
100.00 |
100.00 |
50.00 |
50.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
100.00 |
100.00 |
200.00 |
200.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
14,000.00 |
14,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 804-01-D |
precast concrete piles (18")
|
2,052   |
LNFT |
68.00 |
139,536.00 |
75.00 |
153,900.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
500.00 |
500.00 |
|
|
|
|
| 805-10-A |
bridge superstructure & substructure(24' clear roadway;
90 degree crossing) (c.i.p. bents) |
11   |
SPAN |
19,750.00 |
217,250.00 |
22,000.00 |
242,000.00 |
|
|
|
|
| S-001 |
vibration monitoring
|
lump |
lump |
10,500.00 |
10,500.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-101 |
concrete approach slabs(24'clear roadway;90 degree
crossing;asphaltic conc. wearing course and tapered barrier rails) |
2   |
EACH |
8,000.00 |
16,000.00 |
10,000.00 |
20,000.00 |
|
|
|
|
| |
tapered barrier rails) |
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
574,789.00 |
|
686,954.00 |
|
|
|
|
|