| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - C W & W CONTRACTORS, INC. |
- 2 - GUINN BROTHERS, LLC. |
- 3 - BEN ALLEN, INC. |
- 4 - LOUISIANA BRIDGE, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
16,000.00 |
16,000.00 |
14,000.00 |
14,000.00 |
| 202-02-A-01 |
removal of bridge(sta. 0+157.000;17.655 m long x
6.350 m wide, 3-span timber bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
6,500.00 |
6,500.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
| 203-05-A |
nonplastic embankment(sand)(adjusted vehicular
measurement) |
62   |
cu m |
50.00 |
3,100.00 |
75.00 |
4,650.00 |
15.00 |
930.00 |
100.00 |
6,200.00 |
| 203-06 |
excavation & embankment
|
lump |
lump |
15,000.00 |
15,000.00 |
12,500.00 |
12,500.00 |
25,000.00 |
25,000.00 |
40,000.00 |
40,000.00 |
| 204-02 |
temporary hay or straw bales
|
44   |
ea |
10.00 |
440.00 |
10.00 |
440.00 |
FREE |
FREE |
8.00 |
352.00 |
| 204-03 |
temporary slope drains
|
20   |
ln m |
20.00 |
400.00 |
10.00 |
200.00 |
FREE |
FREE |
30.00 |
600.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
2   |
ea |
125.00 |
250.00 |
100.00 |
200.00 |
FREE |
FREE |
86.00 |
172.00 |
| 204-06 |
temporary silt fencing
|
200   |
ln m |
10.00 |
2,000.00 |
3.00 |
600.00 |
FREE |
FREE |
5.75 |
1,150.00 |
| 302-01 |
class ii base course
|
98.6 |
cu m |
100.00 |
9,860.00 |
95.00 |
9,367.00 |
100.00 |
9,860.00 |
112.00 |
11,043.20 |
| 502-01 |
superpave asphaltic concrete
|
90.5 |
Mg |
175.00 |
15,837.50 |
215.00 |
19,457.50 |
150.00 |
13,575.00 |
175.00 |
15,837.50 |
| 701-05-G-01 |
side drain pipe (450 mm)(erosion)
|
20.0 |
ln m |
200.00 |
4,000.00 |
150.00 |
3,000.00 |
105.00 |
2,100.00 |
227.00 |
4,540.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
15.24 |
ln m |
300.00 |
4,572.00 |
215.00 |
3,276.60 |
235.00 |
3,581.40 |
222.00 |
3,383.28 |
| 704-09 |
guard rail anchor sections (turndown)
|
15.24 |
ln m |
125.00 |
1,905.00 |
95.00 |
1,447.80 |
185.00 |
2,819.40 |
92.00 |
1,402.08 |
| 707-04 |
asphaltic curb
|
6.0 |
ln m |
100.00 |
600.00 |
100.00 |
600.00 |
100.00 |
600.00 |
113.50 |
681.00 |
| 711-01-C |
riprap (15 kg, 360mm thick)
|
257   |
sq m |
60.00 |
15,420.00 |
65.00 |
16,705.00 |
60.00 |
15,420.00 |
80.60 |
20,714.20 |
| 711-04 |
geotextile fabric
|
257   |
sq m |
3.00 |
771.00 |
5.00 |
1,285.00 |
3.00 |
771.00 |
4.00 |
1,028.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
8,000.00 |
8,000.00 |
12,000.00 |
12,000.00 |
5,000.00 |
5,000.00 |
16,000.00 |
16,000.00 |
| 727-01 |
mobilization
|
lump |
lump |
45,000.00 |
45,000.00 |
50,000.00 |
50,000.00 |
40,000.00 |
40,000.00 |
85,000.00 |
85,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
6   |
ea |
110.00 |
660.00 |
90.00 |
540.00 |
75.00 |
450.00 |
80.00 |
480.00 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
ea |
1,500.00 |
3,000.00 |
1,850.00 |
3,700.00 |
1,500.00 |
3,000.00 |
681.00 |
1,362.00 |
| 740-01 |
construction layout
|
lump |
lump |
10,000.00 |
10,000.00 |
7,000.00 |
7,000.00 |
3,500.00 |
3,500.00 |
5,000.00 |
5,000.00 |
| 803-03 |
steel sheet pile wall
|
190.3 |
sq m |
330.00 |
62,799.00 |
395.00 |
75,168.50 |
509.00 |
96,862.70 |
515.00 |
98,004.50 |
| 804-01-B |
precast concrete piles (350 mm)
|
180.0 |
ln m |
255.00 |
45,900.00 |
170.00 |
30,600.00 |
135.00 |
24,300.00 |
245.00 |
44,100.00 |
| 804-12 |
loading permanent piles
|
1   |
ea |
500.00 |
500.00 |
1.00 |
1.00 |
FREE |
FREE |
1.00 |
1.00 |
| 805-10-A |
bridge superstructure & substructure(7.3 m clear
roadway @ 90 degree crossing)(c.i.p.) |
4   |
span |
20,000.00 |
80,000.00 |
20,000.00 |
80,000.00 |
21,000.00 |
84,000.00 |
20,000.00 |
80,000.00 |
| S-101 |
concrete approach slab(7.3 m clear roadway @ 90 degree
crossing; tapered concrete barrier rail)(c.i.p.) |
1   |
ea |
10,000.00 |
10,000.00 |
8,500.00 |
8,500.00 |
10,500.00 |
10,500.00 |
9,000.00 |
9,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
360,014.50 |
|
362,738.40 |
|
368,269.50 |
|
470,050.76 |
|