| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - HUEY STOCKSTILL, INC. |
- 3 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
1,500   |
CUYD |
10.00 |
15,000.00 |
15.00 |
22,500.00 |
15.00 |
22,500.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
25,656.0 |
TON |
57.50 |
1,475,220.00 |
55.00 |
1,411,080.00 |
61.00 |
1,565,016.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
250.0 |
TON |
57.50 |
14,375.00 |
55.00 |
13,750.00 |
61.00 |
15,250.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
96,228   |
SQYD |
1.50 |
144,342.00 |
1.20 |
115,473.60 |
3.00 |
288,684.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
40,000.00 |
40,000.00 |
230,000.00 |
230,000.00 |
125,000.00 |
125,000.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
1,500   |
LNFT |
0.50 |
750.00 |
0.40 |
600.00 |
0.15 |
225.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
21.780 |
MILE |
150.00 |
3,267.00 |
10.00 |
217.80 |
600.00 |
13,068.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
21.780 |
MILE |
5.00 |
108.90 |
10.00 |
217.80 |
100.00 |
2,178.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
43.560 |
MILE |
5.00 |
217.80 |
20.00 |
871.20 |
100.00 |
4,356.00 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
3   |
EACH |
5.00 |
15.00 |
40.00 |
120.00 |
25.00 |
75.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
3   |
EACH |
5.00 |
15.00 |
40.00 |
120.00 |
25.00 |
75.00 |
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
500   |
SQYD |
5.00 |
2,500.00 |
20.00 |
10,000.00 |
30.00 |
15,000.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
2,000   |
SQYD |
15.00 |
30,000.00 |
20.00 |
40,000.00 |
65.00 |
130,000.00 |
|
|
| 724-02 |
pavement widening
|
20.0 |
SQYD |
10.00 |
200.00 |
100.00 |
2,000.00 |
65.00 |
1,300.00 |
|
|
| 724-03 |
pavement joint repair
|
250.0 |
TON |
25.00 |
6,250.00 |
100.00 |
25,000.00 |
125.00 |
31,250.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
194,000.00 |
194,000.00 |
240,000.00 |
240,000.00 |
127,000.00 |
127,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
24   |
EACH |
60.00 |
1,440.00 |
70.00 |
1,680.00 |
60.00 |
1,440.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,250   |
EACH |
5.00 |
6,250.00 |
6.00 |
7,500.00 |
6.00 |
7,500.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,160   |
LNFT |
0.85 |
986.00 |
1.00 |
1,160.00 |
1.00 |
1,160.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
14.520 |
MILE |
2,300.00 |
33,396.00 |
2,300.00 |
33,396.00 |
2,500.00 |
36,300.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
7.260 |
MILE |
800.00 |
5,808.00 |
800.00 |
5,808.00 |
1,000.00 |
7,260.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
150.00 |
150.00 |
170.00 |
170.00 |
200.00 |
200.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
180.00 |
180.00 |
200.00 |
200.00 |
200.00 |
200.00 |
|
|
| 735-01 |
mailboxes
|
2   |
EACH |
1.00 |
2.00 |
10.00 |
20.00 |
5.00 |
10.00 |
|
|
| 735-02 |
mailbox supports (single)
|
2   |
EACH |
175.00 |
350.00 |
500.00 |
1,000.00 |
200.00 |
400.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
4,000.00 |
4,000.00 |
30,000.00 |
30,000.00 |
90,000.00 |
90,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
1,000.00 |
1,000.00 |
90,000.00 |
90,000.00 |
75,000.00 |
75,000.00 |
|
|
| S-001 |
rumble strips (ground-in)
|
12.0 |
MILE |
530.00 |
6,360.00 |
1,000.00 |
12,000.00 |
600.00 |
7,200.00 |
|
|
| S-002 |
cleaning existing culverts
|
2,185   |
LNFT |
10.00 |
21,850.00 |
50.00 |
109,250.00 |
28.00 |
61,180.00 |
|
|
| S-003 |
dynamic message sign unit
|
2   |
EACH |
4,000.00 |
8,000.00 |
14,000.00 |
28,000.00 |
10,000.00 |
20,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,016,032.70 |
|
2,432,134.40 |
|
2,648,827.00 |
|
|
|