| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures and obstructions
|
lump |
LUMP |
4,000.00 |
4,000.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks and drives
|
1,880   |
SQYD |
4.00 |
7,520.00 |
12.00 |
22,560.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vedhicular
measurement) |
663   |
CUYD |
70.00 |
46,410.00 |
40.00 |
26,520.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
14,419.8 |
TON |
60.00 |
865,188.00 |
66.00 |
951,706.80 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,682.7 |
TON |
60.00 |
160,962.00 |
80.00 |
214,616.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
72,770   |
SQYD |
1.50 |
109,155.00 |
2.20 |
160,094.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,021   |
CUYD |
10.00 |
- 20,210.00 |
10.00 |
- 20,210.00 |
|
|
|
|
| 701-07-C |
yard drain pipe (8")
|
16   |
LNFT |
100.00 |
1,600.00 |
150.00 |
2,400.00 |
|
|
|
|
| 702-03-H |
catch basins (cb-05)
|
2   |
EACH |
2,500.00 |
5,000.00 |
4,500.00 |
9,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
43   |
EACH |
500.00 |
21,500.00 |
400.00 |
17,200.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
10   |
EACH |
750.00 |
7,500.00 |
500.00 |
5,000.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
1,800.0 |
SQYD |
35.00 |
63,000.00 |
50.00 |
90,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
85,000.00 |
85,000.00 |
45,000.00 |
45,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
1,800   |
LNFT |
0.10 |
180.00 |
0.50 |
900.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
1,728   |
LNFT |
0.10 |
172.80 |
1.50 |
2,592.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
13.500 |
MILE |
150.00 |
2,025.00 |
10.00 |
135.00 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
13.500 |
MILE |
10.00 |
135.00 |
15.00 |
202.50 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
27.600 |
MILE |
10.00 |
276.00 |
20.00 |
552.00 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
6   |
EACH |
1.00 |
6.00 |
20.00 |
120.00 |
|
|
|
|
| 713-06-E |
temporary pavement legends and symbols (school
crossing) |
6   |
EACH |
1.00 |
6.00 |
20.00 |
120.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
2,500   |
SQYD |
60.00 |
150,000.00 |
70.00 |
175,000.00 |
|
|
|
|
| 724-02 |
pavement widening
|
1,500.0 |
SQYD |
60.00 |
90,000.00 |
40.00 |
60,000.00 |
|
|
|
|
| 724-03 |
pavement joint repair
|
100.0 |
TON |
150.00 |
15,000.00 |
400.00 |
40,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
180,000.00 |
180,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 729-19-C |
dead end road installations(type c)
|
6   |
EACH |
425.00 |
2,550.00 |
550.00 |
3,300.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
4,752   |
EACH |
7.00 |
33,264.00 |
7.00 |
33,264.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
742   |
LNFT |
1.50 |
1,113.00 |
1.60 |
1,187.20 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
946   |
LNFT |
5.00 |
4,730.00 |
5.00 |
4,730.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.200 |
MILE |
3,600.00 |
33,120.00 |
4,000.00 |
36,800.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.500 |
MILE |
1,300.00 |
5,850.00 |
1,400.00 |
6,300.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
160.00 |
320.00 |
200.00 |
400.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
170.00 |
340.00 |
200.00 |
400.00 |
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
2   |
EACH |
500.00 |
1,000.00 |
500.00 |
1,000.00 |
|
|
|
|
| 735-01 |
mailboxes
|
46   |
EACH |
5.00 |
230.00 |
20.00 |
920.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
46   |
EACH |
100.00 |
4,600.00 |
140.00 |
6,440.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
2   |
EACH |
125.00 |
250.00 |
1,500.00 |
3,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-001 |
tree trimming
|
lump |
LUMP |
8,000.00 |
8,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| S-002 |
tree pruning
|
lump |
LUMP |
5,000.00 |
5,000.00 |
500.00 |
500.00 |
|
|
|
|
| S-003 |
cleaning catch basins
|
10   |
EACH |
125.00 |
1,250.00 |
400.00 |
4,000.00 |
|
|
|
|
| S-004 |
concrete handicap ramp
|
80   |
SQYD |
80.00 |
6,400.00 |
300.00 |
24,000.00 |
|
|
|
|
| S-005 |
cleaning existing ditches
|
15,000   |
LNFT |
1.00 |
15,000.00 |
0.20 |
3,000.00 |
|
|
|
|
| S-006 |
cleaning existing drainage culverts (less than 18")
|
1,000   |
LNFT |
5.00 |
5,000.00 |
20.00 |
20,000.00 |
|
|
|
|
| S-007 |
cleaning existing drainage culverts (18" to 36")
|
1,000   |
LNFT |
15.00 |
15,000.00 |
25.00 |
25,000.00 |
|
|
|
|
| S-008 |
cleaning existing drainage culverts (larger than 36")
|
1,000   |
LNFT |
18.00 |
18,000.00 |
30.00 |
30,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,985,442.80 |
|
2,234,749.50 |
|
|
|
|
|