| 202-02-H |
removal of guard rail
|
1,042   |
LNFT |
4.00 |
4,168.00 |
4.50 |
4,689.00 |
4.00 |
4,168.00 |
4.00 |
4,168.00 |
| 203-08 |
borrow (vehicular measurement)
|
1,200   |
CUYD |
15.00 |
18,000.00 |
18.00 |
21,600.00 |
8.00 |
9,600.00 |
12.00 |
14,400.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,357   |
CUYD |
26.50 |
35,960.50 |
38.00 |
51,566.00 |
25.00 |
33,925.00 |
20.00 |
27,140.00 |
| 502-01 |
superpave asphaltic concrete
|
18,163.6 |
TON |
45.00 |
817,362.00 |
54.00 |
980,834.40 |
67.00 |
1,216,961.20 |
60.00 |
1,089,816.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
469.5 |
TON |
75.00 |
35,212.50 |
125.00 |
58,687.50 |
120.00 |
56,340.00 |
75.00 |
35,212.50 |
| 509-01 |
cold planing asphaltic pavement
|
78,355   |
SQYD |
1.00 |
78,355.00 |
1.20 |
94,026.00 |
1.00 |
78,355.00 |
2.00 |
156,710.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,645   |
CUYD |
0.10 |
- 164.50 |
5.00 |
- 8,225.00 |
10.00 |
- 16,450.00 |
0.01 |
- 16.45 |
| 701-02-D/E |
cross drain pipe arch (24" equiv. rcpa or 30" equiv.
cmpa) |
44   |
LNFT |
77.00 |
3,388.00 |
160.00 |
7,040.00 |
100.00 |
4,400.00 |
120.00 |
5,280.00 |
| 701-08 |
relaying pipe
|
16   |
LNFT |
98.00 |
1,568.00 |
100.00 |
1,600.00 |
80.00 |
1,280.00 |
120.00 |
1,920.00 |
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
24   |
LNFT |
154.00 |
3,696.00 |
250.00 |
6,000.00 |
175.00 |
4,200.00 |
170.00 |
4,080.00 |
| 701-15 |
concrete collar
|
5   |
EACH |
700.00 |
3,500.00 |
1,000.00 |
5,000.00 |
1,000.00 |
5,000.00 |
700.00 |
3,500.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
160.0 |
LNFT |
27.00 |
4,320.00 |
32.00 |
5,120.00 |
26.00 |
4,160.00 |
35.00 |
5,600.00 |
| 704-03 |
blocked out guard rail
|
331.3 |
LNFT |
16.00 |
5,300.80 |
17.00 |
5,632.10 |
16.00 |
5,300.80 |
18.00 |
5,963.40 |
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
75.0 |
LNFT |
37.00 |
2,775.00 |
34.00 |
2,550.00 |
36.00 |
2,700.00 |
35.00 |
2,625.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
300.0 |
LNFT |
51.00 |
15,300.00 |
58.00 |
17,400.00 |
50.00 |
15,000.00 |
60.00 |
18,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
12   |
EACH |
1,900.00 |
22,800.00 |
2,100.00 |
25,200.00 |
1,800.00 |
21,600.00 |
1,800.00 |
21,600.00 |
| 707-04 |
asphaltic curb
|
120.0 |
LNFT |
25.00 |
3,000.00 |
30.00 |
3,600.00 |
15.00 |
1,800.00 |
25.00 |
3,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
20,000.00 |
20,000.00 |
125,000.00 |
125,000.00 |
| 713-03-C |
temporary pavement markings (8" width)
|
675   |
LNFT |
0.21 |
141.75 |
0.30 |
202.50 |
0.30 |
202.50 |
0.15 |
101.25 |
| 713-03-E |
temporary pavement markings (24" width)
|
888   |
LNFT |
0.62 |
550.56 |
1.00 |
888.00 |
1.00 |
888.00 |
0.45 |
399.60 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
12.600 |
MILE |
132.00 |
1,663.20 |
150.00 |
1,890.00 |
10.00 |
126.00 |
500.00 |
6,300.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
9.900 |
MILE |
230.00 |
2,277.00 |
10.00 |
99.00 |
10.00 |
99.00 |
100.00 |
990.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
35.100 |
MILE |
1.00 |
35.10 |
20.00 |
702.00 |
20.00 |
702.00 |
10.00 |
351.00 |
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
6   |
EACH |
51.00 |
306.00 |
54.00 |
324.00 |
20.00 |
120.00 |
25.00 |
150.00 |
| 713-06-C |
temporary pavement legends and symbols (only)
|
6   |
EACH |
51.00 |
306.00 |
54.00 |
324.00 |
20.00 |
120.00 |
25.00 |
150.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
2,712   |
SQYD |
45.00 |
122,040.00 |
44.00 |
119,328.00 |
60.00 |
162,720.00 |
60.00 |
162,720.00 |
| 724-02 |
pavement widening
|
425.0 |
SQYD |
52.00 |
22,100.00 |
38.00 |
16,150.00 |
50.00 |
21,250.00 |
45.00 |
19,125.00 |
| 726-01 |
bedding material
|
9.8 |
CUYD |
56.00 |
548.80 |
70.00 |
686.00 |
65.00 |
637.00 |
100.00 |
980.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
70,000.00 |
70,000.00 |
55,000.00 |
55,000.00 |
100,000.00 |
100,000.00 |
150,000.00 |
150,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
12   |
EACH |
70.00 |
840.00 |
80.00 |
960.00 |
75.00 |
900.00 |
70.00 |
840.00 |
| 731-02 |
reflectorized raised pavement markers
|
675   |
EACH |
4.00 |
2,700.00 |
5.20 |
3,510.00 |
5.00 |
3,375.00 |
6.00 |
4,050.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
270   |
LNFT |
0.82 |
221.40 |
2.00 |
540.00 |
1.00 |
270.00 |
1.50 |
405.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
355   |
LNFT |
2.46 |
873.30 |
7.00 |
2,485.00 |
3.00 |
1,065.00 |
3.50 |
1,242.50 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
14.040 |
MILE |
1,900.00 |
26,676.00 |
2,200.00 |
30,888.00 |
2,200.00 |
30,888.00 |
2,500.00 |
35,100.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.960 |
MILE |
700.00 |
2,772.00 |
1,000.00 |
3,960.00 |
1,000.00 |
3,960.00 |
1,000.00 |
3,960.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
150.00 |
300.00 |
170.00 |
340.00 |
150.00 |
300.00 |
200.00 |
400.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
150.00 |
300.00 |
180.00 |
360.00 |
170.00 |
340.00 |
200.00 |
400.00 |
| 735-01 |
mailboxes
|
31   |
EACH |
15.00 |
465.00 |
6.00 |
186.00 |
2.00 |
62.00 |
5.00 |
155.00 |
| 735-02 |
mailbox supports (single)
|
31   |
EACH |
150.00 |
4,650.00 |
120.00 |
3,720.00 |
70.00 |
2,170.00 |
125.00 |
3,875.00 |
| 736-09 |
loop detector
|
150   |
LNFT |
12.00 |
1,800.00 |
12.00 |
1,800.00 |
12.00 |
1,800.00 |
12.00 |
1,800.00 |
| 736-10 |
underground junction box
|
1   |
EACH |
250.00 |
250.00 |
300.00 |
300.00 |
250.00 |
250.00 |
300.00 |
300.00 |
| 736-11 |
conduit (1"pec)
|
25   |
LNFT |
6.00 |
150.00 |
6.00 |
150.00 |
5.00 |
125.00 |
6.00 |
150.00 |
| 739-01 |
hydro-seeding
|
0.50 |
ACRE |
5,000.00 |
2,500.00 |
1,000.00 |
500.00 |
1,500.00 |
750.00 |
1,500.00 |
750.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
19,000.00 |
19,000.00 |
10,000.00 |
10,000.00 |
2,000.00 |
2,000.00 |
60,000.00 |
60,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
70,000.00 |
70,000.00 |
| S-001 |
u-channel post installation
|
70   |
EACH |
45.00 |
3,150.00 |
50.00 |
3,500.00 |
60.00 |
4,200.00 |
70.00 |
4,900.00 |
| S-002 |
cleaning existing ditches
|
200   |
LNFT |
4.00 |
800.00 |
12.00 |
2,400.00 |
10.00 |
2,000.00 |
15.00 |
3,000.00 |
| S-003 |
dynamic message sign unit
|
2   |
EACH |
2,100.00 |
4,200.00 |
9,000.00 |
18,000.00 |
8,000.00 |
16,000.00 |
10,000.00 |
20,000.00 |
| S-101 |
barrier rail rehabilition
|
606.0 |
LNFT |
32.00 |
19,392.00 |
45.00 |
27,270.00 |
32.00 |
19,392.00 |
40.00 |
24,240.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,385,549.41 |
|
1,616,782.50 |
|
1,855,051.50 |
|