Letting of 1/25/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 256-05-0015
Parish: ST JAMES
Routes: LA 44 9 td>
Description: LOCAL ROAD - ASCENSION PARISH LINE
Type Const: grading, drainage structure, cold planing asph pavement, superpave asphaltic concrete
ovly, pavememnt patching, and related work.
 
RankLicenseBidderAmount
100481 COASTAL BRIDGE CO., L.L.C. $2,224,760.33
206276 BARRIERE CONSTRUCTION CO., LLC $2,499,131.80
300849 F.G. SULLIVAN, JR. CONTRACTOR LLC $2,688,103.82
00046 BARBER BROS. CONTRACTING CO., L.L.CIRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
COASTAL BRIDGE CO., L.L.C.
- 2 -
BARRIERE CONSTRUCTION CO., LLC
- 3 -
F.G. SULLIVAN, JR. CONTRACTOR LLC

BARBER BROS. CONTRACTING CO., L.L.C
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 91      LNFT 10.00 910.00 10.00 910.00 10.00 910.00 15.00 1,365.00
203-08 borrow (vehicular measurement) 300      CUYD 15.00 4,500.00 20.00 6,000.00 20.00 6,000.00 20.00 6,000.00
204-06 temporary silt fencing 300      LNFT 4.00 1,200.00 3.00 900.00 3.00 900.00 4.00 1,200.00
401-02 aggregate surface course (adjusted vehicular
measurement)
5,131      CUYD 1.00 5,131.00 50.00 256,550.00 25.00 128,275.00 26.00 133,406.00
502-01 superpave asphaltic concrete 23,354.6    TON 55.50 1,296,180.30 58.00 1,354,566.80 51.50 1,202,761.90 58.00 1,354,566.80
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
2,036.0    TON 1.00 2,036.00 58.00 118,088.00 75.00 152,700.00 80.00 162,880.00
509-01 cold planing asphaltic pavement (2" average depth) 121,323      SQYD 3.70 448,895.10 1.50 181,984.50 2.40 291,175.20 2.25 272,976.75
509-02 contractor retained reclaimed asphaltic pavement - 3,033      CUYD 1.00 - 3,033.00 10.00 - 30,330.00 0.01 - 30.33 0.00 0.00
701-02-D cross drain pipe arch (24" equiv. rcpa) 952      LNFT 75.00 71,400.00 130.00 123,760.00 200.00 190,400.00 130.00 123,760.00
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 105.0    LNFT 44.00 4,620.00 46.00 4,830.00 45.00 4,725.00 55.00 5,775.00
704-03 blocked out guard rail 89.0    LNFT 18.00 1,602.00 20.00 1,780.00 20.00 1,780.00 25.00 2,225.00
704-11-B guard rail end treatment (tangent) 2      EACH 3,000.00 6,000.00 3,100.00 6,200.00 3,000.00 6,000.00 3,500.00 7,000.00
706-01-A concrete walk (4" thick) 50.0    SQYD 50.00 2,500.00 60.00 3,000.00 50.00 2,500.00 40.00 2,000.00
713-01 temporary signs & barricades lump      LUMP 15,000.00 15,000.00 60,000.00 60,000.00 150,000.00 150,000.00 50,000.00 50,000.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
28.200  MILE 300.00 8,460.00 120.00 3,384.00 500.00 14,100.00 450.00 12,690.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
20.589  MILE 300.00 6,176.70 10.00 205.89 100.00 2,058.90 350.00 7,206.15
713-05-A temporary pavement markings (solid line)(4" width) 111.565  MILE 1.00 111.56 10.00 1,115.65 10.00 1,115.65 700.00 78,095.50
724-01-B pavement patching (12" minimum thickness) 212      SQYD 80.00 16,960.00 100.00 21,200.00 90.00 19,080.00 75.00 15,900.00
726-01 bedding material 352.6    CUYD 0.01 3.52 50.00 17,630.00 FREE FREE 50.00 17,630.00
727-01 mobilization lump      LUMP 210,000.00 210,000.00 240,000.00 240,000.00 201,000.00 201,000.00 100,000.00 100,000.00
729-16-B object marker assembly (type 2) 60      EACH 60.00 3,600.00 55.00 3,300.00 50.00 3,000.00 60.00 3,600.00
729-16-C object marker assembly (type 3) 2      EACH 75.00 150.00 80.00 160.00 75.00 150.00 85.00 170.00
731-02 reflectorized raised pavement markers 1,242      EACH 5.10 6,334.20 5.50 6,831.00 6.00 7,452.00 6.00 7,452.00
732-02-A plastic pavement striping (solid line) (4" width) 24.655  MILE 2,150.00 53,008.25 2,200.00 54,241.00 2,500.00 61,637.50 2,500.00 61,637.50
732-03-A plastic pavement striping (broken line)(4" width) 6.863  MILE 900.00 6,176.70 920.00 6,313.96 1,000.00 6,863.00 1,200.00 8,235.60
735-01 mailboxes 87      EACH 1.00 87.00 5.00 435.00 5.00 435.00 6.00 522.00
735-02 mailbox supports (single) 81      EACH 125.00 10,125.00 115.00 9,315.00 125.00 10,125.00 130.00 10,530.00
735-03 mailbox supports (double) 3      EACH 225.00 675.00 170.00 510.00 200.00 600.00 200.00 600.00
739-01 hydro-seeding 11.39   ACRE 900.00 10,251.00 900.00 10,251.00 1,000.00 11,390.00 1,000.00 11,390.00
740-01 construction layout lump      LUMP 7,500.00 7,500.00 10,000.00 10,000.00 99,000.00 99,000.00 10,000.00 10,000.00
744-01 traffic control management lump      LUMP 15,000.00 15,000.00 15,000.00 15,000.00 101,000.00 101,000.00 50,000.00 50,000.00
S-001 cleaning existing ditches 2,200      LNFT 6.00 13,200.00 5.00 11,000.00 5.00 11,000.00 6.00 13,200.00
                       
 CONTRACTOR TOTAL       2,224,760.33   2,499,131.80   2,688,103.82   IRREGULAR