| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
3,000.00 |
3,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
2,200   |
CUYD |
15.00 |
33,000.00 |
18.00 |
39,600.00 |
20.00 |
44,000.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,846   |
CUYD |
36.00 |
66,456.00 |
25.00 |
46,150.00 |
25.00 |
46,150.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
13,816.3 |
TON |
63.00 |
870,426.90 |
65.00 |
898,059.50 |
85.00 |
1,174,385.50 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,025.2 |
TON |
85.00 |
87,142.00 |
120.00 |
123,024.00 |
150.00 |
153,780.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
85,232   |
SQYD |
1.10 |
93,755.20 |
1.40 |
119,324.80 |
2.50 |
213,080.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,373   |
CUYD |
0.10 |
- 237.30 |
0.01 |
- 23.73 |
1.00 |
- 2,373.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
653.0 |
LNFT |
37.00 |
24,161.00 |
34.00 |
22,202.00 |
35.00 |
22,855.00 |
|
|
| 704-03 |
blocked out guard rail
|
1,256.3 |
LNFT |
20.00 |
25,126.00 |
17.50 |
21,985.25 |
17.50 |
21,985.25 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
20   |
EACH |
3,000.00 |
60,000.00 |
2,100.00 |
42,000.00 |
2,200.00 |
44,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
38,000.00 |
38,000.00 |
115,000.00 |
115,000.00 |
15,000.00 |
15,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
19.455 |
MILE |
155.00 |
3,015.52 |
165.00 |
3,210.07 |
550.00 |
10,700.25 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
15.669 |
MILE |
245.00 |
3,838.90 |
355.00 |
5,562.49 |
220.00 |
3,447.18 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
57.618 |
MILE |
1.00 |
57.61 |
1.00 |
57.61 |
450.00 |
25,928.10 |
|
|
| 713-07-A |
temporary reflectorized raised pavement markers (tabs)
|
1,714   |
EACH |
0.50 |
857.00 |
0.10 |
171.40 |
1.50 |
2,571.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
6.29 |
ACRE |
850.00 |
5,346.50 |
725.00 |
4,560.25 |
750.00 |
4,717.50 |
|
|
| 717-01 |
seeding
|
283   |
LB |
5.00 |
1,415.00 |
7.00 |
1,981.00 |
4.50 |
1,273.50 |
|
|
| 718-01 |
fertilizer
|
6,290   |
LB |
0.50 |
3,145.00 |
0.50 |
3,145.00 |
0.45 |
2,830.50 |
|
|
| 724-01-C |
pavement patching (15" minimum thickness)
|
300   |
SQYD |
95.00 |
28,500.00 |
120.00 |
36,000.00 |
150.00 |
45,000.00 |
|
|
| 726-01 |
bedding material
|
146.8 |
CUYD |
91.00 |
13,358.80 |
80.00 |
11,744.00 |
100.00 |
14,680.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
180,000.00 |
180,000.00 |
175,000.00 |
175,000.00 |
250,000.00 |
250,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
20   |
EACH |
85.00 |
1,700.00 |
75.00 |
1,500.00 |
75.00 |
1,500.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
857   |
EACH |
5.00 |
4,285.00 |
8.00 |
6,856.00 |
4.50 |
3,856.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
19.206 |
MILE |
2,300.00 |
44,173.80 |
2,950.00 |
56,657.70 |
2,000.00 |
38,412.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.223 |
MILE |
850.00 |
4,439.55 |
1,500.00 |
7,834.50 |
750.00 |
3,917.25 |
|
|
| 735-01 |
mailboxes
|
25   |
EACH |
20.00 |
500.00 |
10.00 |
250.00 |
10.00 |
250.00 |
|
|
| 735-02 |
mailbox supports (single)
|
12   |
EACH |
150.00 |
1,800.00 |
135.00 |
1,620.00 |
150.00 |
1,800.00 |
|
|
| 735-03 |
mailbox supports (double)
|
5   |
EACH |
250.00 |
1,250.00 |
275.00 |
1,375.00 |
200.00 |
1,000.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
350.00 |
350.00 |
375.00 |
375.00 |
300.00 |
300.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
45,000.00 |
45,000.00 |
40,000.00 |
40,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
68.07 |
CUYD |
1,000.00 |
68,070.00 |
900.00 |
61,263.00 |
1,300.00 |
88,491.00 |
|
|
| 805-12-M |
reinforced concrete box culverts (6'x 6')
|
34.0 |
LNFT |
950.00 |
32,300.00 |
815.00 |
27,710.00 |
1,000.00 |
34,000.00 |
|
|
| 805-12-S |
reinforced concrete box culverts (8'x 8')
|
160.0 |
LNFT |
1,000.00 |
160,000.00 |
1,000.00 |
160,000.00 |
1,300.00 |
208,000.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
4,938   |
LB |
2.00 |
9,876.00 |
2.25 |
11,110.50 |
2.25 |
11,110.50 |
|
|
| S-001 |
cleaning existing ditches
|
300   |
LNFT |
12.00 |
3,600.00 |
12.00 |
3,600.00 |
15.00 |
4,500.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,892,708.48 |
|
2,078,905.34 |
|
2,561,148.03 |
|
|
|