Letting of 1/25/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 154-02-0014
Parish: UNION
Routes: LA 15 9 td>
Description: PARISH ROAD - LA 558
Type Const: grading, drainage structures, cold planing asphaltic concrete, pavement patching,
superpave asphaltic concrete overlay and related work.
 
RankLicenseBidderAmount
112487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,892,708.48
205789 D & J CONSTRUCTION CO., INC. $2,078,905.34
312312 GILCHRIST CONSTRUCTION CO. LLC $2,561,148.03
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
D & J CONSTRUCTION CO., INC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 3,000.00 3,000.00 10,000.00 10,000.00 10,000.00 10,000.00    
203-08 borrow (vehicular measurement) 2,200      CUYD 15.00 33,000.00 18.00 39,600.00 20.00 44,000.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
1,846      CUYD 36.00 66,456.00 25.00 46,150.00 25.00 46,150.00    
502-01 superpave asphaltic concrete 13,816.3    TON 63.00 870,426.90 65.00 898,059.50 85.00 1,174,385.50    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,025.2    TON 85.00 87,142.00 120.00 123,024.00 150.00 153,780.00    
509-01 cold planing asphaltic pavement 85,232      SQYD 1.10 93,755.20 1.40 119,324.80 2.50 213,080.00    
509-02 contractor retained reclaimed asphaltic pavement - 2,373      CUYD 0.10 - 237.30 0.01 - 23.73 1.00 - 2,373.00    
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 653.0    LNFT 37.00 24,161.00 34.00 22,202.00 35.00 22,855.00    
704-03 blocked out guard rail 1,256.3    LNFT 20.00 25,126.00 17.50 21,985.25 17.50 21,985.25    
704-11-B guard rail end treatment (tangent) 20      EACH 3,000.00 60,000.00 2,100.00 42,000.00 2,200.00 44,000.00    
713-01 temporary signs & barricades lump      LUMP 38,000.00 38,000.00 115,000.00 115,000.00 15,000.00 15,000.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
19.455  MILE 155.00 3,015.52 165.00 3,210.07 550.00 10,700.25    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
15.669  MILE 245.00 3,838.90 355.00 5,562.49 220.00 3,447.18    
713-05-A temporary pavement markings (solid line)(4" width) 57.618  MILE 1.00 57.61 1.00 57.61 450.00 25,928.10    
713-07-A temporary reflectorized raised pavement markers (tabs) 1,714      EACH 0.50 857.00 0.10 171.40 1.50 2,571.00    
716-01-A mulch (vegetative) 6.29   ACRE 850.00 5,346.50 725.00 4,560.25 750.00 4,717.50    
717-01 seeding 283      LB 5.00 1,415.00 7.00 1,981.00 4.50 1,273.50    
718-01 fertilizer 6,290      LB 0.50 3,145.00 0.50 3,145.00 0.45 2,830.50    
724-01-C pavement patching (15" minimum thickness) 300      SQYD 95.00 28,500.00 120.00 36,000.00 150.00 45,000.00    
726-01 bedding material 146.8    CUYD 91.00 13,358.80 80.00 11,744.00 100.00 14,680.00    
727-01 mobilization lump      LUMP 180,000.00 180,000.00 175,000.00 175,000.00 250,000.00 250,000.00    
729-16-C object marker assembly (type 3) 20      EACH 85.00 1,700.00 75.00 1,500.00 75.00 1,500.00    
731-02 reflectorized raised pavement markers 857      EACH 5.00 4,285.00 8.00 6,856.00 4.50 3,856.50    
732-02-A plastic pavement striping (solid line) (4" width) 19.206  MILE 2,300.00 44,173.80 2,950.00 56,657.70 2,000.00 38,412.00    
732-03-A plastic pavement striping (broken line)(4" width) 5.223  MILE 850.00 4,439.55 1,500.00 7,834.50 750.00 3,917.25    
735-01 mailboxes 25      EACH 20.00 500.00 10.00 250.00 10.00 250.00    
735-02 mailbox supports (single) 12      EACH 150.00 1,800.00 135.00 1,620.00 150.00 1,800.00    
735-03 mailbox supports (double) 5      EACH 250.00 1,250.00 275.00 1,375.00 200.00 1,000.00    
735-04 mailbox supports (multiple) 1      EACH 350.00 350.00 375.00 375.00 300.00 300.00    
740-01 construction layout lump      LUMP 10,000.00 10,000.00 15,000.00 15,000.00 20,000.00 20,000.00    
744-01 traffic control management lump      LUMP 10,000.00 10,000.00 45,000.00 45,000.00 40,000.00 40,000.00    
805-01-B class a concrete (box culvert headwalls) 68.07   CUYD 1,000.00 68,070.00 900.00 61,263.00 1,300.00 88,491.00    
805-12-M reinforced concrete box culverts (6'x 6') 34.0    LNFT 950.00 32,300.00 815.00 27,710.00 1,000.00 34,000.00    
805-12-S reinforced concrete box culverts (8'x 8') 160.0    LNFT 1,000.00 160,000.00 1,000.00 160,000.00 1,300.00 208,000.00    
806-01 deformed reinforcing steel 4,938      LB 2.00 9,876.00 2.25 11,110.50 2.25 11,110.50    
S-001 cleaning existing ditches 300      LNFT 12.00 3,600.00 12.00 3,600.00 15.00 4,500.00    
                       
 CONTRACTOR TOTAL       1,892,708.48   2,078,905.34   2,561,148.03    