Letting of 1/25/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 127-02-0022
Parish: LASALLE
Routes: LA 127 9 td>
Description: CHICKASAW CREEK AND DRAIN BRIDGE REPLACEMENT
Type Const: grading, superpave acp, cold planing acp, temporary detour bridges, concrete slab
span bridges, and related work.
 
RankLicenseBidderAmount
109090 GUINN BROTHERS, LLC. $2,728,336.75
212312 GILCHRIST CONSTRUCTION CO. LLC $2,796,023.10
334567 JAMES CONSTRUCTION GROUP LLC $2,914,754.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
GUINN BROTHERS, LLC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
JAMES CONSTRUCTION GROUP LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 50,000.00 50,000.00 75,000.00 75,000.00 152,000.00 152,000.00    
202-02-A-01 removal of bridge - str no. 58301270209561 - 169' x
24' concrete deck girder bridge (sta. 115+92.65)
1      EACH 32,000.00 32,000.00 35,000.00 35,000.00 35,000.00 35,000.00    
202-02-A-02 removal of bridge - str no. 58301270209681 - 96' x 24'
concrete deck girder bridge (sta. 122+17.12)
1      EACH 25,000.00 25,000.00 25,000.00 25,000.00 18,000.00 18,000.00    
202-02-G removal of surfacing & stabilized base 617.2    SQYD 5.00 3,086.00 4.00 2,468.80 4.00 2,468.80    
203-01 general excavation 371      CUYD 8.00 2,968.00 10.00 3,710.00 4.00 1,484.00    
203-02 drainage excavation 4,621      CUYD 8.50 39,278.50 10.00 46,210.00 8.00 36,968.00    
203-04 embankment 5,177      CUYD 10.00 51,770.00 15.00 77,655.00 8.00 41,416.00    
204-06 temporary silt fencing 3,284      LNFT 2.25 7,389.00 2.00 6,568.00 3.00 9,852.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
33      CUYD 90.00 2,970.00 75.00 2,475.00 35.00 1,155.00    
402-01 traffic maintenance aggregate (vehicular measurement) 300.0    CUYD 25.00 7,500.00 45.00 13,500.00 40.00 12,000.00    
502-01 superpave asphaltic concrete 2,476.5    TON 112.00 277,368.00 85.00 210,502.50 110.00 272,415.00    
509-01 cold planing asphaltic pavement 2,547      SQYD 4.25 10,824.75 2.50 6,367.50 3.00 7,641.00    
509-02 contractor retained reclaimed asphaltic pavement - 71      CUYD 1.00 - 71.00 1.00 - 71.00 1.00 - 71.00    
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 158.2    LNFT 46.00 7,277.20 45.00 7,119.00 42.00 6,644.40    
704-03 blocked out guard rail 650.0    LNFT 18.50 12,025.00 17.50 11,375.00 16.00 10,400.00    
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 55.00 11,000.00 55.00 11,000.00 50.00 10,000.00    
704-11-A guard rail end treatment (flared) 12      EACH 2,100.00 25,200.00 2,000.00 24,000.00 1,775.00 21,300.00    
705-01 barbed wire fence 105      LNFT 7.00 735.00 8.00 840.00 10.00 1,050.00    
705-02 combination mesh & barbed wire fence 361      LNFT 9.00 3,249.00 8.00 2,888.00 12.50 4,512.50    
708-01 right-of-way monument 16      EACH 125.00 2,000.00 250.00 4,000.00 150.00 2,400.00    
708-02 right-of-way monument witness post 16      EACH 125.00 2,000.00 250.00 4,000.00 150.00 2,400.00    
712-04 flexible revetment 597      SQYD 65.00 38,805.00 50.00 29,850.00 75.00 44,775.00    
713-01 temporary signs & barricades lump      LUMP 32,000.00 32,000.00 25,000.00 25,000.00 10,000.00 10,000.00    
716-01-A mulch (vegetative) 2.12   ACRE 1,000.00 2,120.00 1,100.00 2,332.00 1,000.00 2,120.00    
725-01 temporary detour roads 1,218.4    LNFT 265.00 322,876.00 300.00 365,520.00 320.00 389,888.00    
725-03 temporary detour bridging 200.00   LNFT 1,100.00 220,000.00 1,750.00 350,000.00 2,800.00 560,000.00    
727-01 mobilization lump      LUMP 220,000.00 220,000.00 275,000.00 275,000.00 275,000.00 275,000.00    
729-16-C object marker assembly (type 3) 8      EACH 100.00 800.00 75.00 600.00 70.00 560.00    
731-02 reflectorized raised pavement markers 44      EACH 8.00 352.00 6.00 264.00 6.00 264.00    
732-02-A plastic pavement striping (solid line) (4" width) 0.714  MILE 3,500.00 2,499.00 2,750.00 1,963.50 2,500.00 1,785.00    
732-03-A plastic pavement striping (broken line)(4" width) 0.356  MILE 1,500.00 534.00 1,000.00 356.00 1,000.00 356.00    
732-05 removal of existing markings 0.117  MILE 7,500.00 877.50 6,000.00 702.00 3,500.00 409.50    
739-01 hydro-seeding 2.12   ACRE 1,800.00 3,816.00 1,100.00 2,332.00 2,000.00 4,240.00    
740-01 construction layout lump      LUMP 50,000.00 50,000.00 40,000.00 40,000.00 25,000.00 25,000.00    
744-01 traffic control management lump      LUMP 15,000.00 15,000.00 25,000.00 25,000.00 3,500.00 3,500.00    
804-01-C precast concrete piles (16") 1,820      LNFT 55.00 100,100.00 60.00 109,200.00 50.00 91,000.00    
804-01-F precast concrete piles (24") 2,664      LNFT 130.00 346,320.00 100.00 266,400.00 90.00 239,760.00    
804-12 loading permanent piles 2      EACH 1.00 2.00 1,000.00 2,000.00 1,000.00 2,000.00    
805-01-F class a concrete (bents) 199.80   CUYD 750.00 149,850.00 750.00 149,850.00 600.00 119,880.00    
805-03 class aa concrete 609.62   CUYD 600.00 365,772.00 550.00 335,291.00 400.00 243,848.00    
806-01 deformed reinforcing steel 138,668      LB 0.75 104,001.00 0.60 83,200.80 0.70 97,067.60    
810-01 concrete railing (barrier) 680.00   LNFT 65.00 44,200.00 50.00 34,000.00 50.00 34,000.00    
813-01 concrete approach slabs 728.88   SQYD 185.00 134,842.80 175.00 127,554.00 165.00 120,265.20    
                       
 CONTRACTOR TOTAL       2,728,336.75   2,796,023.10   2,914,754.00    