| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GUINN BROTHERS, LLC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - JAMES CONSTRUCTION GROUP LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
50,000.00 |
50,000.00 |
75,000.00 |
75,000.00 |
152,000.00 |
152,000.00 |
|
|
| 202-02-A-01 |
removal of bridge - str no. 58301270209561 - 169' x
24' concrete deck girder bridge (sta. 115+92.65) |
1   |
EACH |
32,000.00 |
32,000.00 |
35,000.00 |
35,000.00 |
35,000.00 |
35,000.00 |
|
|
| 202-02-A-02 |
removal of bridge - str no. 58301270209681 - 96' x 24'
concrete deck girder bridge (sta. 122+17.12) |
1   |
EACH |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
18,000.00 |
18,000.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
617.2 |
SQYD |
5.00 |
3,086.00 |
4.00 |
2,468.80 |
4.00 |
2,468.80 |
|
|
| 203-01 |
general excavation
|
371   |
CUYD |
8.00 |
2,968.00 |
10.00 |
3,710.00 |
4.00 |
1,484.00 |
|
|
| 203-02 |
drainage excavation
|
4,621   |
CUYD |
8.50 |
39,278.50 |
10.00 |
46,210.00 |
8.00 |
36,968.00 |
|
|
| 203-04 |
embankment
|
5,177   |
CUYD |
10.00 |
51,770.00 |
15.00 |
77,655.00 |
8.00 |
41,416.00 |
|
|
| 204-06 |
temporary silt fencing
|
3,284   |
LNFT |
2.25 |
7,389.00 |
2.00 |
6,568.00 |
3.00 |
9,852.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
33   |
CUYD |
90.00 |
2,970.00 |
75.00 |
2,475.00 |
35.00 |
1,155.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
300.0 |
CUYD |
25.00 |
7,500.00 |
45.00 |
13,500.00 |
40.00 |
12,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
2,476.5 |
TON |
112.00 |
277,368.00 |
85.00 |
210,502.50 |
110.00 |
272,415.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
2,547   |
SQYD |
4.25 |
10,824.75 |
2.50 |
6,367.50 |
3.00 |
7,641.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 71   |
CUYD |
1.00 |
- 71.00 |
1.00 |
- 71.00 |
1.00 |
- 71.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
158.2 |
LNFT |
46.00 |
7,277.20 |
45.00 |
7,119.00 |
42.00 |
6,644.40 |
|
|
| 704-03 |
blocked out guard rail
|
650.0 |
LNFT |
18.50 |
12,025.00 |
17.50 |
11,375.00 |
16.00 |
10,400.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
55.00 |
11,000.00 |
55.00 |
11,000.00 |
50.00 |
10,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
12   |
EACH |
2,100.00 |
25,200.00 |
2,000.00 |
24,000.00 |
1,775.00 |
21,300.00 |
|
|
| 705-01 |
barbed wire fence
|
105   |
LNFT |
7.00 |
735.00 |
8.00 |
840.00 |
10.00 |
1,050.00 |
|
|
| 705-02 |
combination mesh & barbed wire fence
|
361   |
LNFT |
9.00 |
3,249.00 |
8.00 |
2,888.00 |
12.50 |
4,512.50 |
|
|
| 708-01 |
right-of-way monument
|
16   |
EACH |
125.00 |
2,000.00 |
250.00 |
4,000.00 |
150.00 |
2,400.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
16   |
EACH |
125.00 |
2,000.00 |
250.00 |
4,000.00 |
150.00 |
2,400.00 |
|
|
| 712-04 |
flexible revetment
|
597   |
SQYD |
65.00 |
38,805.00 |
50.00 |
29,850.00 |
75.00 |
44,775.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
32,000.00 |
32,000.00 |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
2.12 |
ACRE |
1,000.00 |
2,120.00 |
1,100.00 |
2,332.00 |
1,000.00 |
2,120.00 |
|
|
| 725-01 |
temporary detour roads
|
1,218.4 |
LNFT |
265.00 |
322,876.00 |
300.00 |
365,520.00 |
320.00 |
389,888.00 |
|
|
| 725-03 |
temporary detour bridging
|
200.00 |
LNFT |
1,100.00 |
220,000.00 |
1,750.00 |
350,000.00 |
2,800.00 |
560,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
220,000.00 |
220,000.00 |
275,000.00 |
275,000.00 |
275,000.00 |
275,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
100.00 |
800.00 |
75.00 |
600.00 |
70.00 |
560.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
44   |
EACH |
8.00 |
352.00 |
6.00 |
264.00 |
6.00 |
264.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.714 |
MILE |
3,500.00 |
2,499.00 |
2,750.00 |
1,963.50 |
2,500.00 |
1,785.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.356 |
MILE |
1,500.00 |
534.00 |
1,000.00 |
356.00 |
1,000.00 |
356.00 |
|
|
| 732-05 |
removal of existing markings
|
0.117 |
MILE |
7,500.00 |
877.50 |
6,000.00 |
702.00 |
3,500.00 |
409.50 |
|
|
| 739-01 |
hydro-seeding
|
2.12 |
ACRE |
1,800.00 |
3,816.00 |
1,100.00 |
2,332.00 |
2,000.00 |
4,240.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
50,000.00 |
50,000.00 |
40,000.00 |
40,000.00 |
25,000.00 |
25,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
3,500.00 |
3,500.00 |
|
|
| 804-01-C |
precast concrete piles (16")
|
1,820   |
LNFT |
55.00 |
100,100.00 |
60.00 |
109,200.00 |
50.00 |
91,000.00 |
|
|
| 804-01-F |
precast concrete piles (24")
|
2,664   |
LNFT |
130.00 |
346,320.00 |
100.00 |
266,400.00 |
90.00 |
239,760.00 |
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
1.00 |
2.00 |
1,000.00 |
2,000.00 |
1,000.00 |
2,000.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
199.80 |
CUYD |
750.00 |
149,850.00 |
750.00 |
149,850.00 |
600.00 |
119,880.00 |
|
|
| 805-03 |
class aa concrete
|
609.62 |
CUYD |
600.00 |
365,772.00 |
550.00 |
335,291.00 |
400.00 |
243,848.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
138,668   |
LB |
0.75 |
104,001.00 |
0.60 |
83,200.80 |
0.70 |
97,067.60 |
|
|
| 810-01 |
concrete railing (barrier)
|
680.00 |
LNFT |
65.00 |
44,200.00 |
50.00 |
34,000.00 |
50.00 |
34,000.00 |
|
|
| 813-01 |
concrete approach slabs
|
728.88 |
SQYD |
185.00 |
134,842.80 |
175.00 |
127,554.00 |
165.00 |
120,265.20 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,728,336.75 |
|
2,796,023.10 |
|
2,914,754.00 |
|
|
|