Letting of 1/25/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 055-07-0073
Parish: IBERIA
Routes: LA 14 9 td>
Description: END OF CONCRETE SECTION - LA 182
Type Const: cold planing asphaltic pavement, superpave asphaltic concrete pavement, pavement
patching, and related work.
 
RankLicenseBidderAmount
104089 H & S CONSTRUCTION CO., INC. $674,380.11
 
Item Number Item Description Quantity Unit of Measure - 1 -
H & S CONSTRUCTION CO., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 212      SQYD 20.00 4,240.00            
202-02-E removal of concrete curbs 635.0    LNFT 20.00 12,700.00            
502-01 superpave asphaltic concrete 4,217.7    TON 66.00 278,368.20            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
96.8    TON 130.00 12,584.00            
509-01 cold planing asphaltic pavement 39,224      SQYD 2.00 78,448.00            
509-02 contractor retained reclaimed asphaltic pavement - 1,090      CUYD 0.01 - 10.90            
706-01-C concrete walk (6" thick) 212.0    SQYD 65.00 13,780.00            
707-01 concrete curb 635.0    LNFT 50.00 31,750.00            
713-01 temporary signs & barricades lump      LUMP 70,000.00 70,000.00            
713-03-A temporary pavement markings (4" width) 936      LNFT 0.20 187.20            
713-03-C temporary pavement markings (8" width) 78      LNFT 0.45 35.10            
713-03-E temporary pavement markings (24" width) 332      LNFT 1.04 345.28            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
10.197  MILE 320.00 3,263.04            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
3.288  MILE 375.00 1,233.00            
713-05-A temporary pavement markings (solid line)(4" width) 9.334  MILE 740.00 6,907.16            
713-06-A temporary pavement legends and symbols (arrow) 8      EACH 62.00 496.00            
713-06-C temporary pavement legends and symbols (only) 4      EACH 62.00 248.00            
713-06-E temporary pavement legends and symbols (school
crossing)
4      EACH 414.00 1,656.00            
724-01-D pavement patching (15" minimum thickness) 337      SQYD 100.00 33,700.00            
727-01 mobilization lump      LUMP 80,000.00 80,000.00            
731-02 reflectorized raised pavement markers 435      EACH 6.00 2,610.00            
732-01-A plastic pavement striping (4" width) 468      LNFT 0.51 238.68            
732-01-C plastic pavement striping (8" width) 39      LNFT 1.04 40.56            
732-01-E plastic pavement striping (24" width) 166      LNFT 3.22 534.52            
732-02-A plastic pavement striping (solid line) (4" width) 4.667  MILE 2,460.00 11,480.82            
732-03-A plastic pavement striping (broken line)(4" width) 1.644  MILE 1,024.00 1,683.45            
732-04-A plastic pavement legends & symbols (arrow) 4      EACH 180.00 720.00            
732-04-C plastic pavement legends & symbols (only) 2      EACH 190.00 380.00            
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 531.00 1,062.00            
740-01 construction layout lump      LUMP 10,000.00 10,000.00            
744-01 traffic control management lump      LUMP 15,700.00 15,700.00            
                       
 CONTRACTOR TOTAL       674,380.11            