| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
750.00 |
750.00 |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
36   |
CUYD |
50.00 |
1,800.00 |
24.00 |
864.00 |
25.00 |
900.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
8,507.3 |
TON |
64.00 |
544,467.20 |
69.25 |
589,130.52 |
75.00 |
638,047.50 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
77,339   |
SQYD |
0.50 |
38,669.50 |
1.50 |
116,008.50 |
1.50 |
116,008.50 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,149   |
CUYD |
1.00 |
- 2,149.00 |
0.10 |
- 214.90 |
1.00 |
- 2,149.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
8   |
LNFT |
150.00 |
1,200.00 |
215.00 |
1,720.00 |
300.00 |
2,400.00 |
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
750.00 |
750.00 |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
39,500.00 |
39,500.00 |
8,000.00 |
8,000.00 |
15,000.00 |
15,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
9.944 |
MILE |
325.00 |
3,231.80 |
157.00 |
1,561.20 |
500.00 |
4,972.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.169 |
MILE |
1.00 |
7.16 |
238.00 |
1,706.22 |
350.00 |
2,509.15 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
30.045 |
MILE |
1.00 |
30.04 |
1.00 |
30.04 |
1.00 |
30.04 |
|
|
| 717-01 |
seeding
|
1   |
LB |
50.00 |
50.00 |
120.00 |
120.00 |
100.00 |
100.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
15   |
SQYD |
20.00 |
300.00 |
25.00 |
375.00 |
100.00 |
1,500.00 |
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
250   |
SQYD |
40.00 |
10,000.00 |
90.00 |
22,500.00 |
75.00 |
18,750.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
500   |
SQYD |
65.00 |
32,500.00 |
95.00 |
47,500.00 |
100.00 |
50,000.00 |
|
|
| 726-01 |
bedding material
|
2.6 |
CUYD |
100.00 |
260.00 |
77.00 |
200.20 |
100.00 |
260.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
39,500.00 |
39,500.00 |
94,000.00 |
94,000.00 |
100,000.00 |
100,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
1   |
EACH |
100.00 |
100.00 |
120.00 |
120.00 |
100.00 |
100.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
657   |
EACH |
4.00 |
2,628.00 |
5.00 |
3,285.00 |
5.50 |
3,613.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
15.023 |
MILE |
1,850.00 |
27,792.55 |
2,200.00 |
33,050.60 |
2,200.00 |
33,050.60 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.584 |
MILE |
700.00 |
2,508.80 |
832.00 |
2,981.88 |
1,000.00 |
3,584.00 |
|
|
| 735-01 |
mailboxes
|
23   |
EACH |
1.00 |
23.00 |
20.00 |
460.00 |
10.00 |
230.00 |
|
|
| 735-02 |
mailbox supports (single)
|
15   |
EACH |
125.00 |
1,875.00 |
200.00 |
3,000.00 |
150.00 |
2,250.00 |
|
|
| 735-03 |
mailbox supports (double)
|
5   |
EACH |
175.00 |
875.00 |
300.00 |
1,500.00 |
250.00 |
1,250.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
325.00 |
325.00 |
500.00 |
500.00 |
350.00 |
350.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
25,000.00 |
25,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
766,994.05 |
|
950,398.26 |
|
1,079,756.29 |
|
|
|