Letting of 1/25/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 005-03-0021
Parish: TERREBONNE
Routes: LA 182
Description: ASSUMPTION PARISH LINE - BAYOU BLACK BRIDGE
Type Const: grading, cold planing asphaltic concrete pavement, superpave asphaltic concrete
overlay, and other related work.
 
RankLicenseBidderAmount
106276 BARRIERE CONSTRUCTION CO., LLC $1,217,965.75
200481 COASTAL BRIDGE CO., L.L.C. $1,291,715.82
306487 HUEY STOCKSTILL, INC. $1,475,519.10
400849 F.G. SULLIVAN, JR. CONTRACTOR LLC $1,596,524.60
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
COASTAL BRIDGE CO., L.L.C.
- 3 -
HUEY STOCKSTILL, INC.
- 4 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 712      LNFT 3.00 2,136.00 6.00 4,272.00 6.00 4,272.00 6.00 4,272.00
203-08 borrow (vehicular measurement) 1,000      CUYD 10.00 10,000.00 10.00 10,000.00 20.00 20,000.00 20.00 20,000.00
401-02 aggregate surface course (adjusted vehicular
measurement)
250      CUYD 5.00 1,250.00 5.00 1,250.00 40.00 10,000.00 55.00 13,750.00
502-01 superpave asphaltic concrete 14,062.9    TON 59.00 829,711.10 58.50 822,679.65 58.00 815,648.20 55.00 773,459.50
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
500.0    TON 59.00 29,500.00 80.00 40,000.00 60.00 30,000.00 55.00 27,500.00
509-01 cold planing asphaltic pavement 50,319      SQYD 1.50 75,478.50 2.35 118,249.65 1.20 60,382.80 2.50 125,797.50
704-03 blocked out guard rail 50.0    LNFT 15.00 750.00 16.00 800.00 17.00 850.00 25.00 1,250.00
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 55.00 5,500.00 55.00 5,500.00 75.00 7,500.00 60.00 6,000.00
704-11-A guard rail end treatment (flared) 4      EACH 2,200.00 8,800.00 2,000.00 8,000.00 2,500.00 10,000.00 2,200.00 8,800.00
707-01 concrete curb 40.0    LNFT 20.00 800.00 40.00 1,600.00 6.00 240.00 45.00 1,800.00
713-01 temporary signs & barricades lump      LUMP 12,000.00 12,000.00 55,000.00 55,000.00 153,000.00 153,000.00 150,000.00 150,000.00
713-03-E temporary pavement markings (24" width) 2,176      LNFT 0.90 1,958.40 1.00 2,176.00 0.10 217.60 0.40 870.40
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
10.220  MILE 100.00 1,022.00 300.00 3,066.00 150.00 1,533.00 500.00 5,110.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
8.030  MILE 5.00 40.15 320.00 2,569.60 10.00 80.30 100.00 803.00
713-05-A temporary pavement markings (solid line)(4" width) 27.320  MILE 5.00 136.60 1.00 27.32 10.00 273.20 10.00 273.20
724-01-A pavement patching (6" minimum thickness) 250      SQYD 30.00 7,500.00 5.00 1,250.00 15.00 3,750.00 25.00 6,250.00
724-01-B pavement patching (12" minimum thickness) 1,500      SQYD 35.00 52,500.00 10.00 15,000.00 20.00 30,000.00 50.00 75,000.00
724-03 pavement joint repair 200.0    TON 50.00 10,000.00 50.00 10,000.00 50.00 10,000.00 150.00 30,000.00
727-01 mobilization lump      LUMP 120,000.00 120,000.00 115,000.00 115,000.00 146,000.00 146,000.00 175,000.00 175,000.00
729-16-B object marker assembly (type 2) 24      EACH 55.00 1,320.00 75.00 1,800.00 65.00 1,560.00 60.00 1,440.00
729-16-C object marker assembly (type 3) 4      EACH 75.00 300.00 75.00 300.00 70.00 280.00 70.00 280.00
729-19-C dead end road installations(type c) 4      EACH 500.00 2,000.00 600.00 2,400.00 500.00 2,000.00 1,150.00 4,600.00
731-02 reflectorized raised pavement markers 1,500      EACH 5.00 7,500.00 5.20 7,800.00 5.50 8,250.00 7.00 10,500.00
732-01-C plastic pavement striping (8" width) 100      LNFT 1.00 100.00 1.00 100.00 1.00 100.00 1.50 150.00
732-01-E plastic pavement striping (24" width) 1,088      LNFT 3.00 3,264.00 2.70 2,937.60 3.00 3,264.00 3.50 3,808.00
732-02-A plastic pavement striping (solid line) (4" width) 9.240  MILE 2,200.00 20,328.00 2,200.00 20,328.00 2,400.00 22,176.00 2,500.00 23,100.00
732-03-A plastic pavement striping (broken line)(4" width) 2.810  MILE 1,000.00 2,810.00 1,000.00 2,810.00 1,000.00 2,810.00 1,000.00 2,810.00
732-04-A plastic pavement legends and symbols (arrow) 2      EACH 150.00 300.00 150.00 300.00 160.00 320.00 175.00 350.00
732-04-C plastic pavement legends and symbols (only) 2      EACH 180.00 360.00 175.00 350.00 200.00 400.00 200.00 400.00
735-01 mailboxes 1      EACH 1.00 1.00 25.00 25.00 12.00 12.00 1.00 1.00
735-02 mailbox supports (single) 1      EACH 100.00 100.00 125.00 125.00 600.00 600.00 150.00 150.00
740-01 construction layout lump      LUMP 2,000.00 2,000.00 15,000.00 15,000.00 30,000.00 30,000.00 55,000.00 55,000.00
744-01 traffic control management lump      LUMP 500.00 500.00 15,000.00 15,000.00 70,000.00 70,000.00 60,000.00 60,000.00
S-001 cleaning existing culverts 400      LNFT 20.00 8,000.00 15.00 6,000.00 75.00 30,000.00 20.00 8,000.00
                       
 CONTRACTOR TOTAL       1,217,965.75   1,291,715.82   1,475,519.10   1,596,524.60