| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - COASTAL BRIDGE CO., L.L.C. |
- 3 - HUEY STOCKSTILL, INC. |
- 4 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
712   |
LNFT |
3.00 |
2,136.00 |
6.00 |
4,272.00 |
6.00 |
4,272.00 |
6.00 |
4,272.00 |
| 203-08 |
borrow (vehicular measurement)
|
1,000   |
CUYD |
10.00 |
10,000.00 |
10.00 |
10,000.00 |
20.00 |
20,000.00 |
20.00 |
20,000.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
250   |
CUYD |
5.00 |
1,250.00 |
5.00 |
1,250.00 |
40.00 |
10,000.00 |
55.00 |
13,750.00 |
| 502-01 |
superpave asphaltic concrete
|
14,062.9 |
TON |
59.00 |
829,711.10 |
58.50 |
822,679.65 |
58.00 |
815,648.20 |
55.00 |
773,459.50 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
500.0 |
TON |
59.00 |
29,500.00 |
80.00 |
40,000.00 |
60.00 |
30,000.00 |
55.00 |
27,500.00 |
| 509-01 |
cold planing asphaltic pavement
|
50,319   |
SQYD |
1.50 |
75,478.50 |
2.35 |
118,249.65 |
1.20 |
60,382.80 |
2.50 |
125,797.50 |
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
15.00 |
750.00 |
16.00 |
800.00 |
17.00 |
850.00 |
25.00 |
1,250.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
55.00 |
5,500.00 |
75.00 |
7,500.00 |
60.00 |
6,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,200.00 |
8,800.00 |
2,000.00 |
8,000.00 |
2,500.00 |
10,000.00 |
2,200.00 |
8,800.00 |
| 707-01 |
concrete curb
|
40.0 |
LNFT |
20.00 |
800.00 |
40.00 |
1,600.00 |
6.00 |
240.00 |
45.00 |
1,800.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
12,000.00 |
12,000.00 |
55,000.00 |
55,000.00 |
153,000.00 |
153,000.00 |
150,000.00 |
150,000.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
2,176   |
LNFT |
0.90 |
1,958.40 |
1.00 |
2,176.00 |
0.10 |
217.60 |
0.40 |
870.40 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
10.220 |
MILE |
100.00 |
1,022.00 |
300.00 |
3,066.00 |
150.00 |
1,533.00 |
500.00 |
5,110.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.030 |
MILE |
5.00 |
40.15 |
320.00 |
2,569.60 |
10.00 |
80.30 |
100.00 |
803.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
27.320 |
MILE |
5.00 |
136.60 |
1.00 |
27.32 |
10.00 |
273.20 |
10.00 |
273.20 |
| 724-01-A |
pavement patching (6" minimum thickness)
|
250   |
SQYD |
30.00 |
7,500.00 |
5.00 |
1,250.00 |
15.00 |
3,750.00 |
25.00 |
6,250.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,500   |
SQYD |
35.00 |
52,500.00 |
10.00 |
15,000.00 |
20.00 |
30,000.00 |
50.00 |
75,000.00 |
| 724-03 |
pavement joint repair
|
200.0 |
TON |
50.00 |
10,000.00 |
50.00 |
10,000.00 |
50.00 |
10,000.00 |
150.00 |
30,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
120,000.00 |
120,000.00 |
115,000.00 |
115,000.00 |
146,000.00 |
146,000.00 |
175,000.00 |
175,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
24   |
EACH |
55.00 |
1,320.00 |
75.00 |
1,800.00 |
65.00 |
1,560.00 |
60.00 |
1,440.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
75.00 |
300.00 |
70.00 |
280.00 |
70.00 |
280.00 |
| 729-19-C |
dead end road installations(type c)
|
4   |
EACH |
500.00 |
2,000.00 |
600.00 |
2,400.00 |
500.00 |
2,000.00 |
1,150.00 |
4,600.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,500   |
EACH |
5.00 |
7,500.00 |
5.20 |
7,800.00 |
5.50 |
8,250.00 |
7.00 |
10,500.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
100   |
LNFT |
1.00 |
100.00 |
1.00 |
100.00 |
1.00 |
100.00 |
1.50 |
150.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
1,088   |
LNFT |
3.00 |
3,264.00 |
2.70 |
2,937.60 |
3.00 |
3,264.00 |
3.50 |
3,808.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.240 |
MILE |
2,200.00 |
20,328.00 |
2,200.00 |
20,328.00 |
2,400.00 |
22,176.00 |
2,500.00 |
23,100.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.810 |
MILE |
1,000.00 |
2,810.00 |
1,000.00 |
2,810.00 |
1,000.00 |
2,810.00 |
1,000.00 |
2,810.00 |
| 732-04-A |
plastic pavement legends and symbols (arrow)
|
2   |
EACH |
150.00 |
300.00 |
150.00 |
300.00 |
160.00 |
320.00 |
175.00 |
350.00 |
| 732-04-C |
plastic pavement legends and symbols (only)
|
2   |
EACH |
180.00 |
360.00 |
175.00 |
350.00 |
200.00 |
400.00 |
200.00 |
400.00 |
| 735-01 |
mailboxes
|
1   |
EACH |
1.00 |
1.00 |
25.00 |
25.00 |
12.00 |
12.00 |
1.00 |
1.00 |
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
100.00 |
100.00 |
125.00 |
125.00 |
600.00 |
600.00 |
150.00 |
150.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
2,000.00 |
2,000.00 |
15,000.00 |
15,000.00 |
30,000.00 |
30,000.00 |
55,000.00 |
55,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
500.00 |
500.00 |
15,000.00 |
15,000.00 |
70,000.00 |
70,000.00 |
60,000.00 |
60,000.00 |
| S-001 |
cleaning existing culverts
|
400   |
LNFT |
20.00 |
8,000.00 |
15.00 |
6,000.00 |
75.00 |
30,000.00 |
20.00 |
8,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,217,965.75 |
|
1,291,715.82 |
|
1,475,519.10 |
|
1,596,524.60 |
|