Bid Tabulations
Letting of
03/31/2010
LA DOTD Headquarters
| Lead Project: 059-01-0029 | |
| Parish: St. Tammany | |
| Routes: LA 21 | |
| Description: LA 21 @ BREWSTER ROAD INTERSECTION IMPROVEMENTS | |
| Type Const: GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCETE, BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, TRAFFIC SIGNALIZATION AND RELATED WORK. | |
| Estimated Construction Cost: $2,353,427.89 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., Llc | $1,483,955.55 |
| 2 | 12198 | Byron E. Talbot Contractor, Inc. | $1,635,416.24 |
| 3 | 48896 | Command Construction Industries LLC | $1,688,600.55 |
| 4 | 14807 | Richard Price Contracting Co, Llc | $1,995,977.88 |
| 5 | 02179 | Boh Bros. Construction Co., LLC. | $2,005,474.48 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., Llc |
- 2 - Byron E. Talbot Contractor, Inc. |
- 3 - Command Construction Industries LLC |
- 4 - Richard Price Contracting Co, Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 5,200.00 | 5,200.00 | 16,500.00 | 16,500.00 | 100,000.00 | 100,000.00 | 30,000.00 | 30,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 50.00 | 50.00 | 35,000.00 | 35,000.00 | 1,000.00 | 1,000.00 | 40,000.00 | 40,000.00 |
| 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 2,409.3 | LNFT | 9.00 | 21,683.70 | 7.00 | 16,865.10 | 15.00 | 36,139.50 | 8.00 | 19,274.40 |
| 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 210 | LNFT | 9.00 | 1,890.00 | 4.95 | 1,039.50 | 1.00 | 210.00 | 20.00 | 4,200.00 |
| 0005 | 202-02-26300 | Removal of Median / Island | 32 | SQYD | 30.00 | 960.00 | 4.75 | 152.00 | 10.00 | 320.00 | 80.00 | 2,560.00 |
| 0006 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 818 | SQYD | 10.00 | 8,180.00 | 8.00 | 6,544.00 | 20.00 | 16,360.00 | 10.00 | 8,180.00 |
| 0007 | 202-02-38200 | Removal of Signs | 7 | EACH | 33.00 | 231.00 | 48.00 | 336.00 | 30.00 | 210.00 | 250.00 | 1,750.00 |
| 0008 | 202-02-38500 | Removal of Surfacing and Stablized Base | 408.7 | SQYD | 7.00 | 2,860.90 | 10.00 | 4,087.00 | 20.00 | 8,174.00 | 8.00 | 3,269.60 |
| 0009 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 5,100.00 | 5,100.00 | 5,500.00 | 5,500.00 | 500.00 | 500.00 | 5,750.00 | 5,750.00 |
| 0010 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 510.00 | 510.00 | 530.00 | 530.00 | 500.00 | 500.00 | 575.00 | 575.00 |
| 0011 | 202-03-38000 | Relocation of Sign (Various Locations) | 15 | EACH | 53.00 | 795.00 | 105.00 | 1,575.00 | 50.00 | 750.00 | 350.00 | 5,250.00 |
| 0012 | 203-01-00100 | General Excavation | 6,295 | CUYD | 15.00 | 94,425.00 | 13.00 | 81,835.00 | 10.00 | 62,950.00 | 12.50 | 78,687.50 |
| 0013 | 203-03-00100 | Embankment | 655 | CUYD | 30.00 | 19,650.00 | 15.00 | 9,825.00 | 10.00 | 6,550.00 | 25.00 | 16,375.00 |
| 0014 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 8 | EACH | 140.00 | 1,120.00 | 275.00 | 2,200.00 | 750.00 | 6,000.00 | 750.00 | 6,000.00 |
| 0015 | 302-02-06000 | Class II Base Course (12" Thick) | 5,450.1 | SQYD | 30.00 | 163,503.00 | 26.50 | 144,427.65 | 23.00 | 125,352.30 | 26.25 | 143,065.13 |
| 0016 | 305-01-04000 | Subgrade Layer (12" Thick) | 5,450.1 | SQYD | 13.00 | 70,851.30 | 13.00 | 70,851.30 | 5.00 | 27,250.50 | 16.50 | 89,926.65 |
| 0017 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 400 | CUYD | 0.01 | 4.00 | 43.00 | 17,200.00 | 25.00 | 10,000.00 | 56.00 | 22,400.00 |
| 0018 | 502-01-00100 | Superpave Asphaltic Concrete | 3,845.9 | TON | 85.00 | 326,901.50 | 90.50 | 348,053.95 | 85.00 | 326,901.50 | 97.75 | 375,936.73 |
| 0019 | 509-01-00100 | Cold Planing Asphaltic Pavement | 14,937 | SQYD | 2.50 | 37,342.50 | 2.65 | 39,583.05 | 2.00 | 29,874.00 | 3.00 | 44,811.00 |
| 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,186 | CUYD | 15.00 | -17,790.00 | 15.00 | -17,790.00 | 15.00 | -17,790.00 | 17.25 | -20,458.50 |
| 0021 | 601-02-00300 | Portland Cement Concrete Pavement (6" Thick) (Crossovers & Turnouts) | 693 | SQYD | 55.00 | 38,115.00 | 44.00 | 30,492.00 | 50.00 | 34,650.00 | 60.00 | 41,580.00 |
| 0022 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 29 | LNFT | 160.00 | 4,640.00 | 100.00 | 2,900.00 | 90.00 | 2,610.00 | 135.50 | 3,929.50 |
| 0023 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 10 | LNFT | 180.00 | 1,800.00 | 100.00 | 1,000.00 | 100.00 | 1,000.00 | 139.00 | 1,390.00 |
| 0024 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 22 | LNFT | 200.00 | 4,400.00 | 100.00 | 2,200.00 | 120.00 | 2,640.00 | 161.50 | 3,553.00 |
| 0025 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 327 | LNFT | 70.00 | 22,890.00 | 55.00 | 17,985.00 | 130.00 | 42,510.00 | 104.00 | 34,008.00 |
| 0026 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 22 | LNFT | 130.00 | 2,860.00 | 120.00 | 2,640.00 | 150.00 | 3,300.00 | 166.00 | 3,652.00 |
| 0027 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 412 | LNFT | 100.00 | 41,200.00 | 75.25 | 31,003.00 | 150.00 | 61,800.00 | 138.00 | 56,856.00 |
| 0028 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 769 | LNFT | 115.00 | 88,435.00 | 110.00 | 84,590.00 | 200.00 | 153,800.00 | 158.00 | 121,502.00 |
| 0029 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 29 | LNFT | 200.00 | 5,800.00 | 250.00 | 7,250.00 | 200.00 | 5,800.00 | 258.00 | 7,482.00 |
| 0030 | 702-02-00200 | Manholes (R-CB-11) | 2 | EACH | 2,500.00 | 5,000.00 | 1,700.00 | 3,400.00 | 2,000.00 | 4,000.00 | 3,800.00 | 7,600.00 |
| 0031 | 702-03-00100 | Catch Basins (CB-01) | 15 | EACH | 2,500.00 | 37,500.00 | 2,100.00 | 31,500.00 | 2,000.00 | 30,000.00 | 2,650.00 | 39,750.00 |
| 0032 | 702-03-00500 | Catch Basins (CB-06) | 4 | EACH | 3,900.00 | 15,600.00 | 2,650.00 | 10,600.00 | 3,000.00 | 12,000.00 | 3,600.00 | 14,400.00 |
| 0033 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 6 | EACH | 120.00 | 720.00 | 400.00 | 2,400.00 | 150.00 | 900.00 | 138.00 | 828.00 |
| 0034 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 2,000.00 | 2,000.00 | 1,100.00 | 1,100.00 | 1,000.00 | 1,000.00 | 1,500.00 | 1,500.00 |
| 0035 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 203.9 | SQYD | 56.00 | 11,418.40 | 38.50 | 7,850.15 | 40.00 | 8,156.00 | 60.00 | 12,234.00 |
| 0036 | 707-01-00200 | Concrete Curb (Barrier) | 458.9 | LNFT | 9.00 | 4,130.10 | 7.25 | 3,327.03 | 10.00 | 4,589.00 | 9.50 | 4,359.55 |
| 0037 | 707-03-00100 | Combination Concrete Curb and Gutter (MOUNTABLE) | 2,831.3 | LNFT | 15.00 | 42,469.50 | 14.00 | 39,638.20 | 20.00 | 56,626.00 | 16.50 | 46,716.45 |
| 0038 | 707-03-00100 | Combination Concrete Curb and Gutter (BARRIER) | 2,133.4 | LNFT | 14.00 | 29,867.60 | 12.00 | 25,600.80 | 20.00 | 42,668.00 | 15.00 | 32,001.00 |
| 0039 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 75,000.00 | 75,000.00 | 1,000.00 | 1,000.00 | 75,000.00 | 75,000.00 |
| 0040 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 663 | LNFT | 1.00 | 663.00 | 0.30 | 198.90 | 0.25 | 165.75 | 0.29 | 192.27 |
| 0041 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 40 | LNFT | 3.00 | 120.00 | 1.10 | 44.00 | 1.00 | 40.00 | 1.15 | 46.00 |
| 0042 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.064 | MILE | 1,000.00 | 64.00 | 505.00 | 32.32 | 450.00 | 28.80 | 431.00 | 27.58 |
| 0043 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.619 | MILE | 850.00 | 526.15 | 583.00 | 360.88 | 250.00 | 154.75 | 547.00 | 338.59 |
| 0044 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.495 | MILE | 1,200.00 | 594.00 | 583.00 | 288.59 | 600.00 | 297.00 | 639.00 | 316.31 |
| 0045 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 12 | EACH | 75.00 | 900.00 | 53.00 | 636.00 | 50.00 | 600.00 | 57.50 | 690.00 |
| 0046 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 3 | EACH | 75.00 | 225.00 | 69.00 | 207.00 | 75.00 | 225.00 | 74.75 | 224.25 |
| 0047 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 6 | EACH | 75.00 | 450.00 | 53.00 | 318.00 | 50.00 | 300.00 | 57.50 | 345.00 |
| 0048 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 3,000.00 | 3,000.00 | 10,500.00 | 10,500.00 | 1,000.00 | 1,000.00 | 6,000.00 | 6,000.00 |
| 0049 | 727-01-00100 | Mobilization | 1 | LUMP | 48,000.00 | 48,000.00 | 100,000.00 | 100,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 |
| 0050 | 729-01-00100 | Sign (Type A) | 147.8 | SQFT | 23.00 | 3,399.40 | 41.00 | 6,059.80 | 22.00 | 3,251.60 | 43.50 | 6,429.30 |
| 0051 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 70.00 | 280.00 | 85.00 | 340.00 | 65.00 | 260.00 | 169.50 | 678.00 |
| 0052 | 729-21-00100 | U-Channel Post | 14 | EACH | 105.00 | 1,470.00 | 60.00 | 840.00 | 100.00 | 1,400.00 | 117.25 | 1,641.50 |
| 0053 | 730-01-00100 | Trenching and Backfilling | 250 | LNFT | 3.60 | 900.00 | 3.75 | 937.50 | 4.00 | 1,000.00 | 4.00 | 1,000.00 |
| 0054 | 731-02-00100 | Reflectorized Raised Pavement Markers | 378 | EACH | 6.00 | 2,268.00 | 5.75 | 2,173.50 | 6.00 | 2,268.00 | 9.65 | 3,647.70 |
| 0055 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 2,181 | LNFT | 1.00 | 2,181.00 | 1.45 | 3,162.45 | 1.00 | 2,181.00 | 1.55 | 3,380.55 |
| 0056 | 732-01-04080 | Plastic Pavement Striping (24" Width) (Preformed Retroreflective Thermoplastic) (Heat Applied) (125 mil) | 992 | LNFT | 3.30 | 3,273.60 | 12.75 | 12,648.00 | 12.00 | 11,904.00 | 13.80 | 13,689.60 |
| 0057 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.584 | MILE | 2,500.00 | 3,960.00 | 2,650.00 | 4,197.60 | 2,500.00 | 3,960.00 | 2,867.00 | 4,541.33 |
| 0058 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.81 | MILE | 5,000.00 | 4,050.00 | 6,900.00 | 5,589.00 | 5,500.00 | 4,455.00 | 7,473.00 | 6,053.13 |
| 0059 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.867 | MILE | 700.00 | 606.90 | 1,000.00 | 867.00 | 750.00 | 650.25 | 970.00 | 840.99 |
| 0060 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 10 | EACH | 170.00 | 1,700.00 | 228.00 | 2,280.00 | 200.00 | 2,000.00 | 247.00 | 2,470.00 |
| 0061 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 5 | EACH | 190.00 | 950.00 | 280.00 | 1,400.00 | 200.00 | 1,000.00 | 305.00 | 1,525.00 |
| 0062 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 16 | EACH | 170.00 | 2,720.00 | 230.00 | 3,680.00 | 200.00 | 3,200.00 | 247.00 | 3,952.00 |
| 0063 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 8 | EACH | 170.00 | 1,360.00 | 230.00 | 1,840.00 | 200.00 | 1,600.00 | 247.00 | 1,976.00 |
| 0064 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 5 | EACH | 200.00 | 1,000.00 | 265.00 | 1,325.00 | 250.00 | 1,250.00 | 288.00 | 1,440.00 |
| 0065 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 28 | EACH | 180.00 | 5,040.00 | 240.00 | 6,720.00 | 200.00 | 5,600.00 | 258.50 | 7,238.00 |
| 0066 | 732-04-25020 | Plastic Pavement Legends and Symbols (Yield Line) | 5 | EACH | 170.00 | 850.00 | 160.00 | 800.00 | 200.00 | 1,000.00 | 172.50 | 862.50 |
| 0067 | 732-05-00100 | Removal of Existing Markings | 0.507 | MILE | 4,200.00 | 2,129.40 | 5,500.00 | 2,788.50 | 4,000.00 | 2,028.00 | 5,669.00 | 2,874.18 |
| 0068 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 125 | LNFT | 12.50 | 1,562.50 | 12.75 | 1,593.75 | 15.00 | 1,875.00 | 13.80 | 1,725.00 |
| 0069 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 600 | LNFT | 14.50 | 8,700.00 | 14.85 | 8,910.00 | 15.00 | 9,000.00 | 16.00 | 9,600.00 |
| 0070 | 736-04-04120 | Signal Support (35' Single Mast Arm) | 1 | EACH | 6,000.00 | 6,000.00 | 6,240.00 | 6,240.00 | 7,000.00 | 7,000.00 | 6,766.00 | 6,766.00 |
| 0071 | 736-04-04140 | Signal Support (40' Single Mast Arm) | 1 | EACH | 6,700.00 | 6,700.00 | 7,025.00 | 7,025.00 | 7,500.00 | 7,500.00 | 7,620.00 | 7,620.00 |
| 0072 | 736-04-04160 | Signal Support (45' Single Mast Arm) | 1 | EACH | 7,300.00 | 7,300.00 | 7,700.00 | 7,700.00 | 8,000.00 | 8,000.00 | 8,318.00 | 8,318.00 |
| 0073 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 1 | EACH | 8,300.00 | 8,300.00 | 8,700.00 | 8,700.00 | 9,000.00 | 9,000.00 | 9,438.00 | 9,438.00 |
| 0074 | 736-04-04200 | Signal Support (55' Single Mast Arm) | 1 | EACH | 8,900.00 | 8,900.00 | 9,400.00 | 9,400.00 | 9,000.00 | 9,000.00 | 10,200.00 | 10,200.00 |
| 0075 | 736-04-04220 | Signal Support (60' Single Mast Arm) | 1 | EACH | 11,000.00 | 11,000.00 | 11,300.00 | 11,300.00 | 12,000.00 | 12,000.00 | 12,244.00 | 12,244.00 |
| 0076 | 736-04-04240 | Signal Support (65' Single Mast Arm) | 1 | EACH | 11,500.00 | 11,500.00 | 11,660.00 | 11,660.00 | 12,000.00 | 12,000.00 | 12,647.00 | 12,647.00 |
| 0077 | 736-04-05200 | Signal Support (Clamp on 55' Arm) | 1 | EACH | 4,500.00 | 4,500.00 | 4,650.00 | 4,650.00 | 5,000.00 | 5,000.00 | 5,025.00 | 5,025.00 |
| 0078 | 736-04-10000 | Signal Support (Foundation Only) | 7 | EACH | 2,100.00 | 14,700.00 | 2,175.00 | 15,225.00 | 3,000.00 | 21,000.00 | 2,357.00 | 16,499.00 |
| 0079 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 14 | EACH | 770.00 | 10,780.00 | 800.00 | 11,200.00 | 800.00 | 11,200.00 | 868.00 | 12,152.00 |
| 0080 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT, Y, LT. G) | 9 | EACH | 750.00 | 6,750.00 | 760.00 | 6,840.00 | 800.00 | 7,200.00 | 822.00 | 7,398.00 |
| 0081 | 736-05-03000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 2 | EACH | 1,150.00 | 2,300.00 | 1,200.00 | 2,400.00 | 1,200.00 | 2,400.00 | 1,305.00 | 2,610.00 |
| 0082 | 736-06-00100 | Signal Service | 2 | EACH | 800.00 | 1,600.00 | 840.00 | 1,680.00 | 800.00 | 1,600.00 | 908.00 | 1,816.00 |
| 0083 | 736-06-00200 | Signal Service (Pedestal Required) | 2 | EACH | 1,480.00 | 2,960.00 | 1,550.00 | 3,100.00 | 1,500.00 | 3,000.00 | 1,667.00 | 3,334.00 |
| 0084 | 736-08-02020 | Signal Controller (TS-2, Type 2; Type 6 Cabinet) | 2 | EACH | 20,000.00 | 40,000.00 | 20,800.00 | 41,600.00 | 20,000.00 | 40,000.00 | 22,533.00 | 45,066.00 |
| 0085 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 390.00 | 390.00 | 410.00 | 410.00 | 400.00 | 400.00 | 443.00 | 443.00 |
| 0086 | 736-10-00300 | Underground Junction Box (Type F) | 8 | EACH | 430.00 | 3,440.00 | 450.00 | 3,600.00 | 400.00 | 3,200.00 | 489.00 | 3,912.00 |
| 0087 | 736-10-00400 | Underground Junction Box (Type G) | 2 | EACH | 820.00 | 1,640.00 | 860.00 | 1,720.00 | 900.00 | 1,800.00 | 931.00 | 1,862.00 |
| 0088 | 736-10-00500 | Underground Junction Box (Type H) | 2 | EACH | 830.00 | 1,660.00 | 875.00 | 1,750.00 | 900.00 | 1,800.00 | 949.00 | 1,898.00 |
| 0089 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 560 | LNFT | 9.00 | 5,040.00 | 6.50 | 3,640.00 | 6.00 | 3,360.00 | 6.90 | 3,864.00 |
| 0090 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 680 | LNFT | 13.00 | 8,840.00 | 9.55 | 6,494.00 | 9.00 | 6,120.00 | 10.35 | 7,038.00 |
| 0091 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 40 | LNFT | 9.00 | 360.00 | 5.85 | 234.00 | 6.00 | 240.00 | 6.32 | 252.80 |
| 0092 | 736-12-04000 | Conductor (6c, #14 awg) | 1,050 | LNFT | 1.55 | 1,627.50 | 1.60 | 1,680.00 | 1.50 | 1,575.00 | 1.72 | 1,806.00 |
| 0093 | 736-12-06000 | Conductor (10c, #14 awg) | 3,620 | LNFT | 1.80 | 6,516.00 | 1.85 | 6,697.00 | 2.00 | 7,240.00 | 2.01 | 7,276.20 |
| 0094 | 736-12-08000 | Conductor (Video Surevillance) | 1,800 | LNFT | 1.30 | 2,340.00 | 1.35 | 2,430.00 | 1.00 | 1,800.00 | 1.44 | 2,592.00 |
| 0095 | 739-01-00100 | Hydro-Seeding | 2.39 | ACRE | 1,050.00 | 2,509.50 | 1,200.00 | 2,868.00 | 1,000.00 | 2,390.00 | 1,300.00 | 3,107.00 |
| 0096 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | 1,000.00 | 1,000.00 | 52,300.00 | 52,300.00 |
| 0097 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 0.00 | 0.00 | 4,000.00 | 4,000.00 | 1,000.00 | 1,000.00 | 30,000.00 | 30,000.00 |
| 0098 | 741-06-00100 | Relocating Fire Hydrant | 2 | EACH | 1,500.00 | 3,000.00 | 2,700.00 | 5,400.00 | 3,000.00 | 6,000.00 | 1,500.00 | 3,000.00 |
| 0099 | 741-11-00100 | Adjusting Water Valve | 6 | EACH | 250.00 | 1,500.00 | 475.00 | 2,850.00 | 200.00 | 1,200.00 | 350.00 | 2,100.00 |
| 0100 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement NOTE 1 | 5,762.2 | INLF | 1.50 | 8,643.30 | 1.10 | 6,338.42 | 3.00 | 17,286.60 | 1.15 | 6,626.53 |
| 0101 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 786.4 | INLF | 2.00 | 1,572.80 | 1.35 | 1,061.64 | 3.00 | 2,359.20 | 1.15 | 904.36 |
| 0102 | NS-700-00600 | Lane Separator System (Furnish and Install) | 402.8 | LNFT | 75.00 | 30,210.00 | 78.45 | 31,599.66 | 66.00 | 26,584.80 | 126.50 | 50,954.20 |
| 0103 | NS-713-00001 | Dynamic Message Sign Unit | 3 | EACH | 3,100.00 | 9,300.00 | 5,500.00 | 16,500.00 | 5,000.00 | 15,000.00 | 4,600.00 | 13,800.00 |
| 0104 | NS-736-00060 | Video Detection Device - Installation Only | 9 | EACH | 520.00 | 4,680.00 | 530.00 | 4,770.00 | 250.00 | 2,250.00 | 575.00 | 5,175.00 |
| 0105 | NS-736-00080 | Video Detection System - Installation Only | 2 | EACH | 270.00 | 540.00 | 275.00 | 550.00 | 250.00 | 500.00 | 287.50 | 575.00 |
| 0106 | NS-ITS-04020 | Fiber Optic Cable, SM, Furnish & Install, 13-48 Fibers | 400 | LNFT | 4.00 | 1,600.00 | 4.00 | 1,600.00 | 4.00 | 1,600.00 | 4.30 | 1,720.00 |
| 0107 | NS-MSC-00120 | Drainage Structure (CONVERSION OF CATCH BASIN TO MANHOLE) | 5 | EACH | 2,000.00 | 10,000.00 | 1,995.00 | 9,975.00 | 1,000.00 | 5,000.00 | 2,800.00 | 14,000.00 |
| CONTRACTOR TOTAL | 1,483,955.55 | 1,635,416.24 | 1,688,600.55 | 1,995,977.88 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Boh Bros. Construction Co., LLC. |
|
| Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 30,000.00 | 30,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 |
| 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 2,409.3 | LNFT | 17.50 | 42,162.75 |
| 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 210 | LNFT | 11.00 | 2,310.00 |
| 0005 | 202-02-26300 | Removal of Median / Island | 32 | SQYD | 46.00 | 1,472.00 |
| 0006 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 818 | SQYD | 8.50 | 6,953.00 |
| 0007 | 202-02-38200 | Removal of Signs | 7 | EACH | 47.50 | 332.50 |
| 0008 | 202-02-38500 | Removal of Surfacing and Stablized Base | 408.7 | SQYD | 8.75 | 3,576.13 |
| 0009 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 3,900.00 | 3,900.00 |
| 0010 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 475.00 | 475.00 |
| 0011 | 202-03-38000 | Relocation of Sign (Various Locations) | 15 | EACH | 100.00 | 1,500.00 |
| 0012 | 203-01-00100 | General Excavation | 6,295 | CUYD | 17.00 | 107,015.00 |
| 0013 | 203-03-00100 | Embankment | 655 | CUYD | 19.00 | 12,445.00 |
| 0014 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 8 | EACH | 200.00 | 1,600.00 |
| 0015 | 302-02-06000 | Class II Base Course (12" Thick) | 5,450.1 | SQYD | 27.00 | 147,152.70 |
| 0016 | 305-01-04000 | Subgrade Layer (12" Thick) | 5,450.1 | SQYD | 10.00 | 54,501.00 |
| 0017 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 400 | CUYD | 62.00 | 24,800.00 |
| 0018 | 502-01-00100 | Superpave Asphaltic Concrete | 3,845.9 | TON | 95.00 | 365,360.50 |
| 0019 | 509-01-00100 | Cold Planing Asphaltic Pavement | 14,937 | SQYD | 3.00 | 44,811.00 |
| 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,186 | CUYD | 1.00 | -1,186.00 |
| 0021 | 601-02-00300 | Portland Cement Concrete Pavement (6" Thick) (Crossovers & Turnouts) | 693 | SQYD | 63.00 | 43,659.00 |
| 0022 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 29 | LNFT | 90.00 | 2,610.00 |
| 0023 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 10 | LNFT | 100.00 | 1,000.00 |
| 0024 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 22 | LNFT | 120.00 | 2,640.00 |
| 0025 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 327 | LNFT | 100.00 | 32,700.00 |
| 0026 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 22 | LNFT | 130.00 | 2,860.00 |
| 0027 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 412 | LNFT | 140.00 | 57,680.00 |
| 0028 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 769 | LNFT | 160.00 | 123,040.00 |
| 0029 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 29 | LNFT | 200.00 | 5,800.00 |
| 0030 | 702-02-00200 | Manholes (R-CB-11) | 2 | EACH | 5,000.00 | 10,000.00 |
| 0031 | 702-03-00100 | Catch Basins (CB-01) | 15 | EACH | 3,000.00 | 45,000.00 |
| 0032 | 702-03-00500 | Catch Basins (CB-06) | 4 | EACH | 6,000.00 | 24,000.00 |
| 0033 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 6 | EACH | 750.00 | 4,500.00 |
| 0034 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 3,000.00 | 3,000.00 |
| 0035 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 203.9 | SQYD | 53.00 | 10,806.70 |
| 0036 | 707-01-00200 | Concrete Curb (Barrier) | 458.9 | LNFT | 17.50 | 8,030.75 |
| 0037 | 707-03-00100 | Combination Concrete Curb and Gutter (MOUNTABLE) | 2,831.3 | LNFT | 22.00 | 62,288.60 |
| 0038 | 707-03-00100 | Combination Concrete Curb and Gutter (BARRIER) | 2,133.4 | LNFT | 23.00 | 49,068.20 |
| 0039 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 |
| 0040 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 663 | LNFT | 0.20 | 132.60 |
| 0041 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 40 | LNFT | 1.00 | 40.00 |
| 0042 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.064 | MILE | 250.00 | 16.00 |
| 0043 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.619 | MILE | 250.00 | 154.75 |
| 0044 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.495 | MILE | 600.00 | 297.00 |
| 0045 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 12 | EACH | 50.00 | 600.00 |
| 0046 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 3 | EACH | 50.00 | 150.00 |
| 0047 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 6 | EACH | 50.00 | 300.00 |
| 0048 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 10,000.00 | 10,000.00 |
| 0049 | 727-01-00100 | Mobilization | 1 | LUMP | 197,000.00 | 197,000.00 |
| 0050 | 729-01-00100 | Sign (Type A) | 147.8 | SQFT | 21.00 | 3,103.80 |
| 0051 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 84.00 | 336.00 |
| 0052 | 729-21-00100 | U-Channel Post | 14 | EACH | 57.50 | 805.00 |
| 0053 | 730-01-00100 | Trenching and Backfilling | 250 | LNFT | 2.00 | 500.00 |
| 0054 | 731-02-00100 | Reflectorized Raised Pavement Markers | 378 | EACH | 5.00 | 1,890.00 |
| 0055 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 2,181 | LNFT | 1.00 | 2,181.00 |
| 0056 | 732-01-04080 | Plastic Pavement Striping (24" Width) (Preformed Retroreflective Thermoplastic) (Heat Applied) (125 mil) | 992 | LNFT | 3.50 | 3,472.00 |
| 0057 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.584 | MILE | 2,375.00 | 3,762.00 |
| 0058 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.81 | MILE | 4,750.00 | 3,847.50 |
| 0059 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.867 | MILE | 650.00 | 563.55 |
| 0060 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 10 | EACH | 160.00 | 1,600.00 |
| 0061 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 5 | EACH | 185.00 | 925.00 |
| 0062 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 16 | EACH | 160.00 | 2,560.00 |
| 0063 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 8 | EACH | 160.00 | 1,280.00 |
| 0064 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 5 | EACH | 200.00 | 1,000.00 |
| 0065 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 28 | EACH | 170.00 | 4,760.00 |
| 0066 | 732-04-25020 | Plastic Pavement Legends and Symbols (Yield Line) | 5 | EACH | 165.00 | 825.00 |
| 0067 | 732-05-00100 | Removal of Existing Markings | 0.507 | MILE | 4,000.00 | 2,028.00 |
| 0068 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 125 | LNFT | 8.75 | 1,093.75 |
| 0069 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 600 | LNFT | 12.00 | 7,200.00 |
| 0070 | 736-04-04120 | Signal Support (35' Single Mast Arm) | 1 | EACH | 6,600.00 | 6,600.00 |
| 0071 | 736-04-04140 | Signal Support (40' Single Mast Arm) | 1 | EACH | 7,500.00 | 7,500.00 |
| 0072 | 736-04-04160 | Signal Support (45' Single Mast Arm) | 1 | EACH | 7,900.00 | 7,900.00 |
| 0073 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 1 | EACH | 9,000.00 | 9,000.00 |
| 0074 | 736-04-04200 | Signal Support (55' Single Mast Arm) | 1 | EACH | 9,100.00 | 9,100.00 |
| 0075 | 736-04-04220 | Signal Support (60' Single Mast Arm) | 1 | EACH | 14,500.00 | 14,500.00 |
| 0076 | 736-04-04240 | Signal Support (65' Single Mast Arm) | 1 | EACH | 15,800.00 | 15,800.00 |
| 0077 | 736-04-05200 | Signal Support (Clamp on 55' Arm) | 1 | EACH | 4,850.00 | 4,850.00 |
| 0078 | 736-04-10000 | Signal Support (Foundation Only) | 7 | EACH | 2,800.00 | 19,600.00 |
| 0079 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 14 | EACH | 938.00 | 13,132.00 |
| 0080 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT, Y, LT. G) | 9 | EACH | 882.00 | 7,938.00 |
| 0081 | 736-05-03000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 2 | EACH | 1,280.00 | 2,560.00 |
| 0082 | 736-06-00100 | Signal Service | 2 | EACH | 1,266.00 | 2,532.00 |
| 0083 | 736-06-00200 | Signal Service (Pedestal Required) | 2 | EACH | 1,488.00 | 2,976.00 |
| 0084 | 736-08-02020 | Signal Controller (TS-2, Type 2; Type 6 Cabinet) | 2 | EACH | 23,500.00 | 47,000.00 |
| 0085 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 378.00 | 378.00 |
| 0086 | 736-10-00300 | Underground Junction Box (Type F) | 8 | EACH | 436.00 | 3,488.00 |
| 0087 | 736-10-00400 | Underground Junction Box (Type G) | 2 | EACH | 680.00 | 1,360.00 |
| 0088 | 736-10-00500 | Underground Junction Box (Type H) | 2 | EACH | 835.00 | 1,670.00 |
| 0089 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 560 | LNFT | 1.35 | 756.00 |
| 0090 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 680 | LNFT | 2.00 | 1,360.00 |
| 0091 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 40 | LNFT | 3.00 | 120.00 |
| 0092 | 736-12-04000 | Conductor (6c, #14 awg) | 1,050 | LNFT | 1.50 | 1,575.00 |
| 0093 | 736-12-06000 | Conductor (10c, #14 awg) | 3,620 | LNFT | 2.00 | 7,240.00 |
| 0094 | 736-12-08000 | Conductor (Video Surevillance) | 1,800 | LNFT | 1.25 | 2,250.00 |
| 0095 | 739-01-00100 | Hydro-Seeding | 2.39 | ACRE | 2,250.00 | 5,377.50 |
| 0096 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 |
| 0097 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 1,000.00 | 1,000.00 |
| 0098 | 741-06-00100 | Relocating Fire Hydrant | 2 | EACH | 3,675.00 | 7,350.00 |
| 0099 | 741-11-00100 | Adjusting Water Valve | 6 | EACH | 300.00 | 1,800.00 |
| 0100 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement NOTE 1 | 5,762.2 | INLF | 1.00 | 5,762.20 |
| 0101 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 786.4 | INLF | 1.25 | 983.00 |
| 0102 | NS-700-00600 | Lane Separator System (Furnish and Install) | 402.8 | LNFT | 100.00 | 40,280.00 |
| 0103 | NS-713-00001 | Dynamic Message Sign Unit | 3 | EACH | 7,140.00 | 21,420.00 |
| 0104 | NS-736-00060 | Video Detection Device - Installation Only | 9 | EACH | 280.00 | 2,520.00 |
| 0105 | NS-736-00080 | Video Detection System - Installation Only | 2 | EACH | 280.00 | 560.00 |
| 0106 | NS-ITS-04020 | Fiber Optic Cable, SM, Furnish & Install, 13-48 Fibers | 400 | LNFT | 1.75 | 700.00 |
| 0107 | NS-MSC-00120 | Drainage Structure (CONVERSION OF CATCH BASIN TO MANHOLE) | 5 | EACH | 5,250.00 | 26,250.00 |
| CONTRACTOR TOTAL | 2,005,474.48 | |||||