Bid Tabulations
Letting of
04/14/2010
LA DOTD Headquarters
| Lead Project: 059-01-0027 | |
| Parish: St. Tammany | |
| Routes: LA 21 | |
| Description: INTERCHANGE IMPROVEMENTS (I-12 @ LA 21) | |
| Type Const: GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC PAVEMENT, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PAVEMENT PATCHING, AND RELATED WORK | |
| Estimated Construction Cost: $7,057,007.12 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $4,995,995.97 |
| 2 | 12198 | Byron E. Talbot Contractor, Inc. | $5,304,874.12 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $5,347,875.89 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $5,477,256.45 |
| 5 | 52550 | Gibbs & Register Inc | $5,536,776.89 |
| 6 | 14807 | Richard Price Contracting Co, Llc | $6,002,114.86 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Byron E. Talbot Contractor, Inc. |
- 3 - Diamond B Construction Co., L.L.C. |
- 4 - Boh Bros. Construction Co., LLC. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 12,000.00 | 12,000.00 | 100,000.00 | 100,000.00 | 75,000.00 | 75,000.00 | 10,000.00 | 10,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 50.00 | 50.00 | 7,100.00 | 7,100.00 | 16,000.00 | 16,000.00 | 20,000.00 | 20,000.00 |
| 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 10 | EACH | 500.00 | 5,000.00 | 215.00 | 2,150.00 | 1,100.00 | 11,000.00 | 500.00 | 5,000.00 |
| 0004 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 5,879 | LNFT | 5.50 | 32,334.50 | 6.75 | 39,683.25 | 8.00 | 47,032.00 | 10.00 | 58,790.00 |
| 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 252 | SQYD | 20.00 | 5,040.00 | 5.00 | 1,260.00 | 15.00 | 3,780.00 | 8.00 | 2,016.00 |
| 0006 | 202-02-14500 | Removal of Guard Rail | 487.5 | LNFT | 2.50 | 1,218.75 | 7.50 | 3,656.25 | 2.00 | 975.00 | 7.50 | 3,656.25 |
| 0007 | 202-02-26000 | Removal of Manholes | 1 | EACH | 500.00 | 500.00 | 180.00 | 180.00 | 1,000.00 | 1,000.00 | 450.00 | 450.00 |
| 0008 | 202-02-26300 | Removal of Median / Island | 6,969 | SQYD | 10.00 | 69,690.00 | 9.35 | 65,160.15 | 14.00 | 97,566.00 | 7.00 | 48,783.00 |
| 0009 | 202-02-32000 | Removal of Paved Ditches | 660 | SQYD | 10.00 | 6,600.00 | 9.35 | 6,171.00 | 16.00 | 10,560.00 | 11.00 | 7,260.00 |
| 0010 | 202-02-38220 | Removal of Sign Supports | 5 | EACH | 260.00 | 1,300.00 | 265.00 | 1,325.00 | 275.00 | 1,375.00 | 260.00 | 1,300.00 |
| 0011 | 202-02-38360 | Removal of Sign Faces | 22 | EACH | 26.00 | 572.00 | 106.00 | 2,332.00 | 27.00 | 594.00 | 105.00 | 2,310.00 |
| 0012 | 202-02-38500 | Removal of Surfacing and Stablized Base | 8,410.5 | SQYD | 1.00 | 8,410.50 | 12.10 | 101,767.05 | 8.75 | 73,591.88 | 7.00 | 58,873.50 |
| 0013 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 5,800.00 | 5,800.00 | 5,300.00 | 5,300.00 | 6,100.00 | 6,100.00 | 5,900.00 | 5,900.00 |
| 0014 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 790.00 | 790.00 | 530.00 | 530.00 | 800.00 | 800.00 | 785.00 | 785.00 |
| 0015 | 202-03-00010 | Relocation RELOCATION OF SIGN AND SUPPORTS (SPECIFIC SERVICE SIGNS) | 8 | EACH | 260.00 | 2,080.00 | 585.00 | 4,680.00 | 275.00 | 2,200.00 | 1,050.00 | 8,400.00 |
| 0017 | 204-02-00100 | Temporary Hay or Straw Bales | 149 | EACH | 12.00 | 1,788.00 | 7.70 | 1,147.30 | 50.00 | 7,450.00 | 12.50 | 1,862.50 |
| 0018 | 204-06-00100 | Temporary Silt Fencing | 14,166 | LNFT | 1.60 | 22,665.60 | 1.95 | 27,623.70 | 3.25 | 46,039.50 | 1.50 | 21,249.00 |
| 0019 | 302-02-06000 | Class II Base Course (12" Thick) | 25,624 | SQYD | 30.00 | 768,720.00 | 28.40 | 727,721.60 | 27.50 | 704,660.00 | 24.00 | 614,976.00 |
| 0020 | 305-01-04000 | Subgrade Layer (12" Thick) | 27,456 | SQYD | 13.00 | 356,928.00 | 12.10 | 332,217.60 | 9.10 | 249,849.60 | 7.00 | 192,192.00 |
| 0021 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,100 | CUYD | 0.01 | 11.00 | 40.00 | 44,000.00 | 78.00 | 85,800.00 | 62.00 | 68,200.00 |
| 0022 | 502-01-00100 | Superpave Asphaltic Concrete | 14,496.1 | TON | 77.00 | 1,116,199.70 | 82.00 | 1,188,680.20 | 86.00 | 1,246,664.60 | 90.00 | 1,304,649.00 |
| 0023 | 509-01-00100 | Cold Planing Asphaltic Pavement | 11,075.4 | SQYD | 2.00 | 22,150.80 | 2.15 | 23,812.11 | 2.50 | 27,688.50 | 2.50 | 27,688.50 |
| 0024 | 509-01-00100 | Cold Planing Asphaltic Pavement 2" THICK | 13,214.6 | SQYD | 2.00 | 26,429.20 | 2.15 | 28,411.39 | 3.75 | 49,554.75 | 2.50 | 33,036.50 |
| 0025 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 2,000 | SQYD | 50.00 | 100,000.00 | 55.00 | 110,000.00 | 78.00 | 156,000.00 | 80.00 | 160,000.00 |
| 0026 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 94 | LNFT | 110.00 | 10,340.00 | 120.00 | 11,280.00 | 240.00 | 22,560.00 | 230.00 | 21,620.00 |
| 0027 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 42 | LNFT | 80.00 | 3,360.00 | 60.00 | 2,520.00 | 75.00 | 3,150.00 | 95.00 | 3,990.00 |
| 0028 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 150 | LNFT | 85.00 | 12,750.00 | 75.00 | 11,250.00 | 95.00 | 14,250.00 | 100.00 | 15,000.00 |
| 0029 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 488 | LNFT | 90.00 | 43,920.00 | 76.00 | 37,088.00 | 106.00 | 51,728.00 | 110.00 | 53,680.00 |
| 0030 | 701-15-00100 | Concrete Collar | 7 | EACH | 750.00 | 5,250.00 | 775.00 | 5,425.00 | 550.00 | 3,850.00 | 2,200.00 | 15,400.00 |
| 0031 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 3,300.00 | 3,300.00 | 2,145.00 | 2,145.00 | 4,300.00 | 4,300.00 | 5,200.00 | 5,200.00 |
| 0032 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 3,000.00 | 9,000.00 | 1,950.00 | 5,850.00 | 3,500.00 | 10,500.00 | 3,000.00 | 9,000.00 |
| 0033 | 702-03-00300 | Catch Basins (CB-04) | 4 | EACH | 2,800.00 | 11,200.00 | 1,200.00 | 4,800.00 | 3,000.00 | 12,000.00 | 1,300.00 | 5,200.00 |
| 0034 | 702-03-00500 | Catch Basins (CB-06) | 5 | EACH | 4,000.00 | 20,000.00 | 3,000.00 | 15,000.00 | 4,800.00 | 24,000.00 | 5,600.00 | 28,000.00 |
| 0035 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 120.00 | 240.00 | 650.00 | 1,300.00 | 1,500.00 | 3,000.00 | 1,200.00 | 2,400.00 |
| 0036 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 2,000.00 | 2,000.00 | 1,100.00 | 1,100.00 | 2,200.00 | 2,200.00 | 2,500.00 | 2,500.00 |
| 0037 | 702-07-00100 | Cross Drain Safety End (Type 1) | 7 | EACH | 2,000.00 | 14,000.00 | 2,125.00 | 14,875.00 | 3,000.00 | 21,000.00 | 1,800.00 | 12,600.00 |
| 0038 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 825 | LNFT | 47.00 | 38,775.00 | 44.55 | 36,753.75 | 50.00 | 41,250.00 | 44.00 | 36,300.00 |
| 0039 | 704-03-00100 | Blocked Out Guard Rail | 425 | LNFT | 12.50 | 5,312.50 | 19.10 | 8,117.50 | 13.00 | 5,525.00 | 18.50 | 7,862.50 |
| 0040 | 704-06-00100 | Guard Rail Anchor Sections (Trailing End) | 37.5 | LNFT | 110.00 | 4,125.00 | 85.00 | 3,187.50 | 110.00 | 4,125.00 | 82.00 | 3,075.00 |
| 0041 | 704-11-00100 | Guard Rail End Treatment (Flared) | 6 | EACH | 1,500.00 | 9,000.00 | 2,350.00 | 14,100.00 | 1,500.00 | 9,000.00 | 2,310.00 | 13,860.00 |
| 0042 | 704-11-00300 | Guard Rail End Treatment (Bi-Directional) | 2 | EACH | 5,000.00 | 10,000.00 | 5,300.00 | 10,600.00 | 5,300.00 | 10,600.00 | 5,125.00 | 10,250.00 |
| 0043 | 706-02-00300 | Concrete Drive (8" Thick) | 252 | SQYD | 40.00 | 10,080.00 | 65.95 | 16,619.40 | 26.00 | 6,552.00 | 85.00 | 21,420.00 |
| 0044 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 6,189 | SQYD | 38.00 | 235,182.00 | 38.15 | 236,110.35 | 14.00 | 86,646.00 | 49.00 | 303,261.00 |
| 0045 | 707-03-00100 | Combination Concrete Curb and Gutter | 5,813 | LNFT | 12.00 | 69,756.00 | 13.00 | 75,569.00 | 13.00 | 75,569.00 | 17.00 | 98,821.00 |
| 0046 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 100,000.00 | 100,000.00 | 162,000.00 | 162,000.00 | 40,000.00 | 40,000.00 |
| 0047 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 1.221 | MILE | 200.00 | 244.20 | 220.00 | 268.62 | 1,200.00 | 1,465.20 | 500.00 | 610.50 |
| 0048 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 4.962 | MILE | 1,200.00 | 5,954.40 | 6,625.00 | 32,873.25 | 6,500.00 | 32,253.00 | 500.00 | 2,481.00 |
| 0049 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 2 | EACH | 55.00 | 110.00 | 53.00 | 106.00 | 55.00 | 110.00 | 50.00 | 100.00 |
| 0050 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 2 | EACH | 55.00 | 110.00 | 53.00 | 106.00 | 55.00 | 110.00 | 50.00 | 100.00 |
| 0051 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 10,000.00 | 10,000.00 | 11,000.00 | 11,000.00 | 17,250.00 | 17,250.00 | 10,000.00 | 10,000.00 |
| 0052 | 725-01-00100 | Temporary Detour Roads | 3,500 | SQYD | 1.00 | 3,500.00 | 47.85 | 167,475.00 | 46.30 | 162,050.00 | 31.00 | 108,500.00 |
| 0053 | 726-01-00100 | Bedding Material | 92.3 | CUYD | 60.00 | 5,538.00 | 50.00 | 4,615.00 | 75.00 | 6,922.50 | 90.00 | 8,307.00 |
| 0054 | 727-01-00100 | Mobilization | 1 | LUMP | 490,000.00 | 490,000.00 | 175,000.00 | 175,000.00 | 152,000.00 | 152,000.00 | 508,000.00 | 508,000.00 |
| 0055 | 729-01-00100 | Sign (Type A) | 199.6 | SQFT | 21.00 | 4,191.60 | 23.35 | 4,660.66 | 22.00 | 4,391.20 | 23.00 | 4,590.80 |
| 0056 | 729-02-00100 | Sign (Type B) | 124.3 | SQFT | 21.00 | 2,610.30 | 26.50 | 3,293.95 | 22.00 | 2,734.60 | 26.00 | 3,231.80 |
| 0057 | 729-04-00100 | Sign (Type D) | 94.5 | SQFT | 25.00 | 2,362.50 | 26.50 | 2,504.25 | 26.00 | 2,457.00 | 26.00 | 2,457.00 |
| 0058 | 729-06-00100 | Sign (Overhead Mounted) | 480 | SQFT | 29.00 | 13,920.00 | 26.50 | 12,720.00 | 31.00 | 14,880.00 | 26.00 | 12,480.00 |
| 0059 | 729-08-00100 | Mounting (2 1/2" Size Post) | 2 | EACH | 850.00 | 1,700.00 | 745.00 | 1,490.00 | 850.00 | 1,700.00 | 735.00 | 1,470.00 |
| 0060 | 729-08-00200 | Mounting (3 1/2" Size Post) | 18 | EACH | 1,000.00 | 18,000.00 | 850.00 | 15,300.00 | 1,000.00 | 18,000.00 | 820.00 | 14,760.00 |
| 0061 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 4 | EACH | 1,550.00 | 6,200.00 | 1,275.00 | 5,100.00 | 1,600.00 | 6,400.00 | 1,260.00 | 5,040.00 |
| 0062 | 729-09-00200 | Mounting (Overhead Truss) (Ground Mounted) (66' Span) | 2 | EACH | 84,000.00 | 168,000.00 | 84,500.00 | 169,000.00 | 84,000.00 | 168,000.00 | 81,000.00 | 162,000.00 |
| 0063 | 729-13-00100 | Mounting (Bridge Fascia Mounted) | 2 | EACH | 8,700.00 | 17,400.00 | 7,000.00 | 14,000.00 | 9,000.00 | 18,000.00 | 6,825.00 | 13,650.00 |
| 0064 | 729-20-00700 | Footings for Overhead Mountings (Truss) | 4 | EACH | 17,500.00 | 70,000.00 | 16,000.00 | 64,000.00 | 18,000.00 | 72,000.00 | 15,750.00 | 63,000.00 |
| 0065 | 729-21-00100 | U-Channel Post | 10 | EACH | 105.00 | 1,050.00 | 58.50 | 585.00 | 80.00 | 800.00 | 57.00 | 570.00 |
| 0066 | 731-02-00100 | Reflectorized Raised Pavement Markers (CLASS IV) | 522 | EACH | 6.00 | 3,132.00 | 5.60 | 2,923.20 | 5.00 | 2,610.00 | 5.25 | 2,740.50 |
| 0067 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,510.08 | LNFT | 4.00 | 6,040.32 | 5.30 | 8,003.42 | 3.25 | 4,907.76 | 5.00 | 7,550.40 |
| 0068 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.82 | MILE | 2,500.00 | 9,550.00 | 2,650.00 | 10,123.00 | 2,500.00 | 9,550.00 | 2,500.00 | 9,550.00 |
| 0069 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.889 | MILE | 5,500.00 | 4,889.50 | 6,900.00 | 6,134.10 | 5,000.00 | 4,445.00 | 6,500.00 | 5,778.50 |
| 0070 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.769 | MILE | 700.00 | 1,238.30 | 900.00 | 1,592.10 | 700.00 | 1,238.30 | 850.00 | 1,503.65 |
| 0071 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 1.011 | MILE | 4,500.00 | 4,549.50 | 3,200.00 | 3,235.20 | 4,000.00 | 4,044.00 | 3,000.00 | 3,033.00 |
| 0072 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 6 | EACH | 190.00 | 1,140.00 | 280.00 | 1,680.00 | 200.00 | 1,200.00 | 265.00 | 1,590.00 |
| 0073 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 24 | EACH | 180.00 | 4,320.00 | 228.00 | 5,472.00 | 175.00 | 4,200.00 | 215.00 | 5,160.00 |
| 0074 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 10 | EACH | 180.00 | 1,800.00 | 228.00 | 2,280.00 | 175.00 | 1,750.00 | 215.00 | 2,150.00 |
| 0075 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 36 | EACH | 190.00 | 6,840.00 | 240.00 | 8,640.00 | 175.00 | 6,300.00 | 225.00 | 8,100.00 |
| 0076 | 732-04-19040 | Plastic Pavement Legends and Symbols (Shield - Interstate) (Preformed Heat Applied Retroreflective Thermoplastic) | 1 | EACH | 750.00 | 750.00 | 1,590.00 | 1,590.00 | 800.00 | 800.00 | 1,500.00 | 1,500.00 |
| 0077 | 732-05-00100 | Removal of Existing Markings | 2.57 | MILE | 5,000.00 | 12,850.00 | 4,240.00 | 10,896.80 | 4,500.00 | 11,565.00 | 4,000.00 | 10,280.00 |
| 0078 | 732-06-00100 | Removal of Existing Raised Pavement Markers | 108 | EACH | 1.25 | 135.00 | 1.05 | 113.40 | 1.00 | 108.00 | 1.00 | 108.00 |
| 0079 | 736-01-00100 | Trenching and Backfilling | 5,128 | LNFT | 2.00 | 10,256.00 | 3.70 | 18,973.60 | 3.75 | 19,230.00 | 2.00 | 10,256.00 |
| 0080 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 1,565 | LNFT | 8.50 | 13,302.50 | 12.75 | 19,953.75 | 13.00 | 20,345.00 | 8.50 | 13,302.50 |
| 0081 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 845 | LNFT | 12.00 | 10,140.00 | 14.85 | 12,548.25 | 15.00 | 12,675.00 | 12.50 | 10,562.50 |
| 0082 | 736-04-02000 | Signal Support (Pedestal Pole) | 4 | EACH | 1,200.00 | 4,800.00 | 1,350.00 | 5,400.00 | 1,300.00 | 5,200.00 | 1,200.00 | 4,800.00 |
| 0083 | 736-04-04140 | Signal Support (40' Single Mast Arm) | 1 | EACH | 9,400.00 | 9,400.00 | 10,300.00 | 10,300.00 | 8,500.00 | 8,500.00 | 8,860.00 | 8,860.00 |
| 0084 | 736-04-04160 | Signal Support (45' Single Mast Arm) | 3 | EACH | 9,500.00 | 28,500.00 | 9,800.00 | 29,400.00 | 9,000.00 | 27,000.00 | 9,200.00 | 27,600.00 |
| 0085 | 736-04-04200 | Signal Support (55' Single Mast Arm) | 1 | EACH | 10,500.00 | 10,500.00 | 11,500.00 | 11,500.00 | 10,000.00 | 10,000.00 | 10,500.00 | 10,500.00 |
| 0086 | 736-04-04220 | Signal Support (60' Single Mast Arm) | 2 | EACH | 19,000.00 | 38,000.00 | 12,500.00 | 25,000.00 | 19,000.00 | 38,000.00 | 19,500.00 | 39,000.00 |
| 0087 | 736-04-05120 | Signal Support (Clamp on 35' Arm) | 1 | EACH | 3,900.00 | 3,900.00 | 2,550.00 | 2,550.00 | 3,300.00 | 3,300.00 | 3,200.00 | 3,200.00 |
| 0088 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 18 | EACH | 900.00 | 16,200.00 | 800.00 | 14,400.00 | 900.00 | 16,200.00 | 900.00 | 16,200.00 |
| 0089 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT, Y, LT. G) | 18 | EACH | 830.00 | 14,940.00 | 755.00 | 13,590.00 | 850.00 | 15,300.00 | 850.00 | 15,300.00 |
| 0090 | 736-05-03000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 2 | EACH | 1,250.00 | 2,500.00 | 1,200.00 | 2,400.00 | 1,200.00 | 2,400.00 | 1,250.00 | 2,500.00 |
| 0091 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 3 | EACH | 1,600.00 | 4,800.00 | 1,275.00 | 3,825.00 | 1,300.00 | 3,900.00 | 1,600.00 | 4,800.00 |
| 0092 | 736-06-00200 | Signal Service (Pedestal Required) | 3 | EACH | 1,500.00 | 4,500.00 | 1,550.00 | 4,650.00 | 1,500.00 | 4,500.00 | 1,450.00 | 4,350.00 |
| 0093 | 736-08-02020 | Signal Controller (TS-2, Type 2; Type 6 Cabinet) | 3 | EACH | 22,500.00 | 67,500.00 | 20,750.00 | 62,250.00 | 23,000.00 | 69,000.00 | 23,000.00 | 69,000.00 |
| 0094 | 736-09-00100 | Loop Detector | 360 | LNFT | 11.00 | 3,960.00 | 11.00 | 3,960.00 | 10.00 | 3,600.00 | 10.50 | 3,780.00 |
| 0095 | 736-10-00200 | Underground Junction Box (Type E) | 11 | EACH | 420.00 | 4,620.00 | 410.00 | 4,510.00 | 425.00 | 4,675.00 | 385.00 | 4,235.00 |
| 0096 | 736-10-00300 | Underground Junction Box (Type F) | 7 | EACH | 450.00 | 3,150.00 | 450.00 | 3,150.00 | 450.00 | 3,150.00 | 450.00 | 3,150.00 |
| 0097 | 736-10-00500 | Underground Junction Box (Type H) | 3 | EACH | 850.00 | 2,550.00 | 875.00 | 2,625.00 | 900.00 | 2,700.00 | 840.00 | 2,520.00 |
| 0098 | 736-10-00700 | Underground Junction Box (Type J) | 6 | EACH | 1,000.00 | 6,000.00 | 995.00 | 5,970.00 | 1,000.00 | 6,000.00 | 1,050.00 | 6,300.00 |
| 0099 | 736-11-00100 | Conduit (1/2" HDPE, Schedule 80) | 93 | LNFT | 0.75 | 69.75 | 5.95 | 553.35 | 6.00 | 558.00 | 0.70 | 65.10 |
| 0100 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 4,013 | LNFT | 1.50 | 6,019.50 | 6.55 | 26,285.15 | 6.25 | 25,081.25 | 1.50 | 6,019.50 |
| 0101 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 995 | LNFT | 2.60 | 2,587.00 | 9.55 | 9,502.25 | 10.00 | 9,950.00 | 2.65 | 2,636.75 |
| 0102 | 736-12-01000 | Conductor (2c, Loop Lead in, imsa 50-2, #19 awg, Twisted Pair) | 3,512 | LNFT | 1.20 | 4,214.40 | 3.85 | 13,521.20 | 4.00 | 14,048.00 | 1.00 | 3,512.00 |
| 0103 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 113 | LNFT | 3.20 | 361.60 | 5.85 | 661.05 | 6.00 | 678.00 | 3.00 | 339.00 |
| 0104 | 736-12-06000 | Conductor (10c, #14 awg) | 4,409 | LNFT | 2.00 | 8,818.00 | 1.85 | 8,156.65 | 1.75 | 7,715.75 | 1.85 | 8,156.65 |
| 0105 | 739-01-00100 | Hydro-Seeding | 11.88 | ACRE | 1,060.00 | 12,592.80 | 2,000.00 | 23,760.00 | 1,000.00 | 11,880.00 | 2,200.00 | 26,136.00 |
| 0106 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | 75,000.00 | 75,000.00 | 50,000.00 | 50,000.00 |
| 0107 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 0.00 | 0.00 | 1.00 | 1.00 | 31,000.00 | 31,000.00 | 1,000.00 | 1,000.00 |
| 0108 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 115,503 | INLF | 0.45 | 51,976.35 | 1.05 | 121,278.15 | 1.00 | 115,503.00 | 0.75 | 86,627.25 |
| 0109 | NS-700-00600 | Lane Separator System (Furnish and Install) | 271 | LNFT | 84.00 | 22,764.00 | 80.00 | 21,680.00 | 100.00 | 27,100.00 | 77.00 | 20,867.00 |
| 0110 | NS-700-00610 | Lane Separator System(Relocate) | 498 | LNFT | 15.00 | 7,470.00 | 15.00 | 7,470.00 | 21.00 | 10,458.00 | 14.50 | 7,221.00 |
| 0111 | NS-713-00001 | Dynamic Message Sign Unit | 4 | EACH | 7,500.00 | 30,000.00 | 13,000.00 | 52,000.00 | 8,000.00 | 32,000.00 | 6,000.00 | 24,000.00 |
| 0112 | NS-736-00020 | Video Detector (MVP) Device | 12 | EACH | 5,500.00 | 66,000.00 | 6,150.00 | 73,800.00 | 5,800.00 | 69,600.00 | 5,500.00 | 66,000.00 |
| 0113 | NS-736-00040 | Video Detection (MVP) System | 3 | EACH | 3,500.00 | 10,500.00 | 3,950.00 | 11,850.00 | 3,500.00 | 10,500.00 | 3,510.00 | 10,530.00 |
| 0114 | NS-ITS-04020 | Fiber Optic Cable, SM, Furnish & Install, 13-48 Fibers | 4,041 | LNFT | 1.80 | 7,273.80 | 4.00 | 16,164.00 | 2.00 | 8,082.00 | 1.80 | 7,273.80 |
| 0115 | 203-01-00100 | General Excavation | 22,683.7 | CUYD | 13.00 | 294,888.10 | 13.55 | 307,364.14 | 10.00 | 226,837.00 | 10.00 | 226,837.00 |
| 0116 | 203-03-00100 | Embankment | 9,037.5 | CUYD | 20.00 | 180,750.00 | 13.95 | 126,073.13 | 18.00 | 162,675.00 | 35.00 | 316,312.50 |
| 0117 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 366.5 | SQYD | 20.00 | 7,330.00 | 5.00 | 1,832.50 | 10.00 | 3,665.00 | 16.00 | 5,864.00 |
| 0118 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 434 | INLF | 2.00 | 868.00 | 1.35 | 585.90 | 1.25 | 542.50 | 1.00 | 434.00 |
| CONTRACTOR TOTAL | 4,995,995.97 | 5,304,874.12 | 5,347,875.89 | 5,477,256.45 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Gibbs & Register Inc |
- 6 - Richard Price Contracting Co, Llc |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 25,000.00 | 25,000.00 | 80,000.00 | 80,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 8,200.00 | 8,200.00 | 80,000.00 | 80,000.00 |
| 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 10 | EACH | 549.00 | 5,490.00 | 850.00 | 8,500.00 |
| 0004 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 5,879 | LNFT | 8.00 | 47,032.00 | 9.75 | 57,320.25 |
| 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 252 | SQYD | 7.50 | 1,890.00 | 15.00 | 3,780.00 |
| 0006 | 202-02-14500 | Removal of Guard Rail | 487.5 | LNFT | 8.00 | 3,900.00 | 15.00 | 7,312.50 |
| 0007 | 202-02-26000 | Removal of Manholes | 1 | EACH | 550.00 | 550.00 | 1,500.00 | 1,500.00 |
| 0008 | 202-02-26300 | Removal of Median / Island | 6,969 | SQYD | 9.00 | 62,721.00 | 8.00 | 55,752.00 |
| 0009 | 202-02-32000 | Removal of Paved Ditches | 660 | SQYD | 9.00 | 5,940.00 | 12.00 | 7,920.00 |
| 0010 | 202-02-38220 | Removal of Sign Supports | 5 | EACH | 250.00 | 1,250.00 | 230.00 | 1,150.00 |
| 0011 | 202-02-38360 | Removal of Sign Faces | 22 | EACH | 100.00 | 2,200.00 | 97.50 | 2,145.00 |
| 0012 | 202-02-38500 | Removal of Surfacing and Stablized Base | 8,410.5 | SQYD | 6.00 | 50,463.00 | 5.00 | 42,052.50 |
| 0013 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 6,000.00 | 6,000.00 | 5,750.00 | 5,750.00 |
| 0014 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 775.00 | 775.00 | 575.00 | 575.00 |
| 0015 | 202-03-00010 | Relocation RELOCATION OF SIGN AND SUPPORTS (SPECIFIC SERVICE SIGNS) | 8 | EACH | 550.00 | 4,400.00 | 288.00 | 2,304.00 |
| 0017 | 204-02-00100 | Temporary Hay or Straw Bales | 149 | EACH | 1.15 | 171.35 | 45.00 | 6,705.00 |
| 0018 | 204-06-00100 | Temporary Silt Fencing | 14,166 | LNFT | 1.15 | 16,290.90 | 3.00 | 42,498.00 |
| 0019 | 302-02-06000 | Class II Base Course (12" Thick) | 25,624 | SQYD | 32.00 | 819,968.00 | 26.25 | 672,630.00 |
| 0020 | 305-01-04000 | Subgrade Layer (12" Thick) | 27,456 | SQYD | 13.00 | 356,928.00 | 13.75 | 377,520.00 |
| 0021 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,100 | CUYD | 52.00 | 57,200.00 | 50.00 | 55,000.00 |
| 0022 | 502-01-00100 | Superpave Asphaltic Concrete | 14,496.1 | TON | 97.00 | 1,406,121.70 | 88.50 | 1,282,904.85 |
| 0023 | 509-01-00100 | Cold Planing Asphaltic Pavement | 11,075.4 | SQYD | 2.75 | 30,457.35 | 2.30 | 25,473.42 |
| 0024 | 509-01-00100 | Cold Planing Asphaltic Pavement 2" THICK | 13,214.6 | SQYD | 3.75 | 49,554.75 | 2.30 | 30,393.58 |
| 0025 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 2,000 | SQYD | 35.00 | 70,000.00 | 61.00 | 122,000.00 |
| 0026 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 94 | LNFT | 115.00 | 10,810.00 | 118.00 | 11,092.00 |
| 0027 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 42 | LNFT | 65.00 | 2,730.00 | 80.00 | 3,360.00 |
| 0028 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 150 | LNFT | 76.00 | 11,400.00 | 90.00 | 13,500.00 |
| 0029 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 488 | LNFT | 85.00 | 41,480.00 | 100.00 | 48,800.00 |
| 0030 | 701-15-00100 | Concrete Collar | 7 | EACH | 1,200.00 | 8,400.00 | 1,000.00 | 7,000.00 |
| 0031 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 4,000.00 | 4,000.00 | 2,700.00 | 2,700.00 |
| 0032 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 3,000.00 | 9,000.00 | 2,500.00 | 7,500.00 |
| 0033 | 702-03-00300 | Catch Basins (CB-04) | 4 | EACH | 2,000.00 | 8,000.00 | 2,200.00 | 8,800.00 |
| 0034 | 702-03-00500 | Catch Basins (CB-06) | 5 | EACH | 3,400.00 | 17,000.00 | 3,500.00 | 17,500.00 |
| 0035 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 1,200.00 | 2,400.00 | 300.00 | 600.00 |
| 0036 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 1,200.00 | 1,200.00 | 1,200.00 | 1,200.00 |
| 0037 | 702-07-00100 | Cross Drain Safety End (Type 1) | 7 | EACH | 2,500.00 | 17,500.00 | 3,500.00 | 24,500.00 |
| 0038 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 825 | LNFT | 48.00 | 39,600.00 | 51.75 | 42,693.75 |
| 0039 | 704-03-00100 | Blocked Out Guard Rail | 425 | LNFT | 18.00 | 7,650.00 | 20.00 | 8,500.00 |
| 0040 | 704-06-00100 | Guard Rail Anchor Sections (Trailing End) | 37.5 | LNFT | 100.00 | 3,750.00 | 103.50 | 3,881.25 |
| 0041 | 704-11-00100 | Guard Rail End Treatment (Flared) | 6 | EACH | 2,200.00 | 13,200.00 | 2,300.00 | 13,800.00 |
| 0042 | 704-11-00300 | Guard Rail End Treatment (Bi-Directional) | 2 | EACH | 4,800.00 | 9,600.00 | 4,950.00 | 9,900.00 |
| 0043 | 706-02-00300 | Concrete Drive (8" Thick) | 252 | SQYD | 70.00 | 17,640.00 | 60.00 | 15,120.00 |
| 0044 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 6,189 | SQYD | 35.00 | 216,615.00 | 32.00 | 198,048.00 |
| 0045 | 707-03-00100 | Combination Concrete Curb and Gutter | 5,813 | LNFT | 20.00 | 116,260.00 | 14.25 | 82,835.25 |
| 0046 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 87,000.00 | 87,000.00 |
| 0047 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 1.221 | MILE | 1,200.00 | 1,465.20 | 11,500.00 | 14,041.50 |
| 0048 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 4.962 | MILE | 6,700.00 | 33,245.40 | 7,180.00 | 35,627.16 |
| 0049 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 2 | EACH | 55.00 | 110.00 | 57.50 | 115.00 |
| 0050 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 2 | EACH | 55.00 | 110.00 | 57.50 | 115.00 |
| 0051 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 7,500.00 | 7,500.00 | 8,000.00 | 8,000.00 |
| 0052 | 725-01-00100 | Temporary Detour Roads | 3,500 | SQYD | 50.00 | 175,000.00 | 62.00 | 217,000.00 |
| 0053 | 726-01-00100 | Bedding Material | 92.3 | CUYD | 100.00 | 9,230.00 | 75.00 | 6,922.50 |
| 0054 | 727-01-00100 | Mobilization | 1 | LUMP | 455,000.00 | 455,000.00 | 390,000.00 | 390,000.00 |
| 0055 | 729-01-00100 | Sign (Type A) | 199.6 | SQFT | 23.00 | 4,590.80 | 22.41 | 4,473.04 |
| 0056 | 729-02-00100 | Sign (Type B) | 124.3 | SQFT | 26.00 | 3,231.80 | 27.58 | 3,428.19 |
| 0057 | 729-04-00100 | Sign (Type D) | 94.5 | SQFT | 26.00 | 2,457.00 | 29.88 | 2,823.66 |
| 0058 | 729-06-00100 | Sign (Overhead Mounted) | 480 | SQFT | 26.00 | 12,480.00 | 29.88 | 14,342.40 |
| 0059 | 729-08-00100 | Mounting (2 1/2" Size Post) | 2 | EACH | 715.00 | 1,430.00 | 919.49 | 1,838.98 |
| 0060 | 729-08-00200 | Mounting (3 1/2" Size Post) | 18 | EACH | 815.00 | 14,670.00 | 1,028.68 | 18,516.24 |
| 0061 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 4 | EACH | 1,225.00 | 4,900.00 | 1,114.88 | 4,459.52 |
| 0062 | 729-09-00200 | Mounting (Overhead Truss) (Ground Mounted) (66' Span) | 2 | EACH | 80,000.00 | 160,000.00 | 89,420.01 | 178,840.02 |
| 0063 | 729-13-00100 | Mounting (Bridge Fascia Mounted) | 2 | EACH | 6,600.00 | 13,200.00 | 9,079.93 | 18,159.86 |
| 0064 | 729-20-00700 | Footings for Overhead Mountings (Truss) | 4 | EACH | 15,500.00 | 62,000.00 | 28,159.26 | 112,637.04 |
| 0065 | 729-21-00100 | U-Channel Post | 10 | EACH | 56.00 | 560.00 | 137.92 | 1,379.20 |
| 0066 | 731-02-00100 | Reflectorized Raised Pavement Markers (CLASS IV) | 522 | EACH | 5.00 | 2,610.00 | 6.03 | 3,147.66 |
| 0067 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,510.08 | LNFT | 3.25 | 4,907.76 | 5.75 | 8,682.96 |
| 0068 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.82 | MILE | 2,500.00 | 9,550.00 | 2,873.39 | 10,976.35 |
| 0069 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.889 | MILE | 5,000.00 | 4,445.00 | 7,395.20 | 6,574.33 |
| 0070 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.769 | MILE | 700.00 | 1,238.30 | 971.98 | 1,719.43 |
| 0071 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 1.011 | MILE | 3,800.00 | 3,841.80 | 3,444.67 | 3,482.56 |
| 0072 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 6 | EACH | 200.00 | 1,200.00 | 304.58 | 1,827.48 |
| 0073 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 24 | EACH | 175.00 | 4,200.00 | 247.11 | 5,930.64 |
| 0074 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 10 | EACH | 175.00 | 1,750.00 | 247.11 | 2,471.10 |
| 0075 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 36 | EACH | 200.00 | 7,200.00 | 258.61 | 9,309.96 |
| 0076 | 732-04-19040 | Plastic Pavement Legends and Symbols (Shield - Interstate) (Preformed Heat Applied Retroreflective Thermoplastic) | 1 | EACH | 800.00 | 800.00 | 1,724.03 | 1,724.03 |
| 0077 | 732-05-00100 | Removal of Existing Markings | 2.57 | MILE | 4,500.00 | 11,565.00 | 4,597.43 | 11,815.40 |
| 0078 | 732-06-00100 | Removal of Existing Raised Pavement Markers | 108 | EACH | 1.00 | 108.00 | 1.15 | 124.20 |
| 0079 | 736-01-00100 | Trenching and Backfilling | 5,128 | LNFT | 2.00 | 10,256.00 | 4.02 | 20,614.56 |
| 0080 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 1,565 | LNFT | 9.00 | 14,085.00 | 13.79 | 21,581.35 |
| 0081 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 845 | LNFT | 13.00 | 10,985.00 | 16.09 | 13,596.05 |
| 0082 | 736-04-02000 | Signal Support (Pedestal Pole) | 4 | EACH | 1,200.00 | 4,800.00 | 1,430.95 | 5,723.80 |
| 0083 | 736-04-04140 | Signal Support (40' Single Mast Arm) | 1 | EACH | 9,000.00 | 9,000.00 | 11,206.23 | 11,206.23 |
| 0084 | 736-04-04160 | Signal Support (45' Single Mast Arm) | 3 | EACH | 9,500.00 | 28,500.00 | 10,660.29 | 31,980.87 |
| 0085 | 736-04-04200 | Signal Support (55' Single Mast Arm) | 1 | EACH | 10,500.00 | 10,500.00 | 12,516.50 | 12,516.50 |
| 0086 | 736-04-04220 | Signal Support (60' Single Mast Arm) | 2 | EACH | 19,000.00 | 38,000.00 | 13,435.99 | 26,871.98 |
| 0087 | 736-04-05120 | Signal Support (Clamp on 35' Arm) | 1 | EACH | 3,200.00 | 3,200.00 | 2,752.71 | 2,752.71 |
| 0088 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 18 | EACH | 900.00 | 16,200.00 | 867.77 | 15,619.86 |
| 0089 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT, Y, LT. G) | 18 | EACH | 900.00 | 16,200.00 | 821.79 | 14,792.22 |
| 0090 | 736-05-03000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 2 | EACH | 1,300.00 | 2,600.00 | 1,304.52 | 2,609.04 |
| 0091 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 3 | EACH | 1,600.00 | 4,800.00 | 1,384.98 | 4,154.94 |
| 0092 | 736-06-00200 | Signal Service (Pedestal Required) | 3 | EACH | 1,500.00 | 4,500.00 | 1,666.57 | 4,999.71 |
| 0093 | 736-08-02020 | Signal Controller (TS-2, Type 2; Type 6 Cabinet) | 3 | EACH | 23,000.00 | 69,000.00 | 22,527.41 | 67,582.23 |
| 0094 | 736-09-00100 | Loop Detector | 360 | LNFT | 11.00 | 3,960.00 | 11.90 | 4,284.00 |
| 0095 | 736-10-00200 | Underground Junction Box (Type E) | 11 | EACH | 400.00 | 4,400.00 | 442.50 | 4,867.50 |
| 0096 | 736-10-00300 | Underground Junction Box (Type F) | 7 | EACH | 450.00 | 3,150.00 | 488.48 | 3,419.36 |
| 0097 | 736-10-00500 | Underground Junction Box (Type H) | 3 | EACH | 825.00 | 2,475.00 | 948.22 | 2,844.66 |
| 0098 | 736-10-00700 | Underground Junction Box (Type J) | 6 | EACH | 1,100.00 | 6,600.00 | 1,074.65 | 6,447.90 |
| 0099 | 736-11-00100 | Conduit (1/2" HDPE, Schedule 80) | 93 | LNFT | 0.75 | 69.75 | 6.44 | 598.92 |
| 0100 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 4,013 | LNFT | 1.50 | 6,019.50 | 6.90 | 27,689.70 |
| 0101 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 995 | LNFT | 2.75 | 2,736.25 | 10.34 | 10,288.30 |
| 0102 | 736-12-01000 | Conductor (2c, Loop Lead in, imsa 50-2, #19 awg, Twisted Pair) | 3,512 | LNFT | 1.00 | 3,512.00 | 4.14 | 14,539.68 |
| 0103 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 113 | LNFT | 3.25 | 367.25 | 6.32 | 714.16 |
| 0104 | 736-12-06000 | Conductor (10c, #14 awg) | 4,409 | LNFT | 2.00 | 8,818.00 | 2.01 | 8,862.09 |
| 0105 | 739-01-00100 | Hydro-Seeding | 11.88 | ACRE | 1,200.00 | 14,256.00 | 1,724.04 | 20,481.60 |
| 0106 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 75,000.00 | 75,000.00 |
| 0107 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 |
| 0108 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 115,503 | INLF | 1.00 | 115,503.00 | 1.15 | 132,828.45 |
| 0109 | NS-700-00600 | Lane Separator System (Furnish and Install) | 271 | LNFT | 80.00 | 21,680.00 | 74.71 | 20,246.41 |
| 0110 | NS-700-00610 | Lane Separator System(Relocate) | 498 | LNFT | 15.00 | 7,470.00 | 34.48 | 17,171.04 |
| 0111 | NS-713-00001 | Dynamic Message Sign Unit | 4 | EACH | 1,800.00 | 7,200.00 | 12,068.25 | 48,273.00 |
| 0112 | NS-736-00020 | Video Detector (MVP) Device | 12 | EACH | 6,000.00 | 72,000.00 | 6,654.78 | 79,857.36 |
| 0113 | NS-736-00040 | Video Detection (MVP) System | 3 | EACH | 3,749.11 | 11,247.33 | 4,264.12 | 12,792.36 |
| 0114 | NS-ITS-04020 | Fiber Optic Cable, SM, Furnish & Install, 13-48 Fibers | 4,041 | LNFT | 2.00 | 8,082.00 | 4.31 | 17,416.71 |
| 0115 | 203-01-00100 | General Excavation | 22,683.7 | CUYD | 6.00 | 136,102.20 | 15.50 | 351,597.35 |
| 0116 | 203-03-00100 | Embankment | 9,037.5 | CUYD | 5.00 | 45,187.50 | 21.00 | 189,787.50 |
| 0117 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 366.5 | SQYD | 20.00 | 7,330.00 | 12.00 | 4,398.00 |
| 0118 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 434 | INLF | 1.50 | 651.00 | 2.50 | 1,085.00 |
| CONTRACTOR TOTAL | 5,536,776.89 | 6,002,114.86 | ||||||