Bid Tabulations
Letting of
06/02/2010
LA DOTD Headquarters
| Lead Project: 057-01-0007 | |
| Parish: Lafayette, Acadia, Vermilion | |
| Routes: LA 13, LA 343, LA 92 | |
| Description: DISTRICT 03 EMERGENCY REPAIR PROJECT - FUNCTIONAL OVERLAYS | |
| Type Const: CLASS II BASE COURSE, IN-PLACE CEMENT STABLIZED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $4,793,987.09 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 33663 | Glenn Lege Construction Inc | $4,107,453.59 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $4,148,754.58 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Glenn Lege Construction Inc |
- 2 - Diamond B Construction Co., L.L.C. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-02000 | Removal of Asphalt Drives | 1,691 | SQYD | 5.00 | 8,455.00 | 15.00 | 25,365.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 237 | SQYD | 6.00 | 1,422.00 | 18.00 | 4,266.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 3,600 | CUYD | 11.00 | 39,600.00 | 16.00 | 57,600.00 |
| 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 22 | EACH | 200.00 | 4,400.00 | 156.00 | 3,432.00 |
| 0005 | 302-02-01060 | Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) | 53,181.3 | SQYD | 9.15 | 486,608.90 | 8.00 | 425,450.40 |
| 0006 | 303-01-00200 | In-Place Cement Stabilized Base Course (8 1/2" Thick) | 54,267 | SQYD | 4.95 | 268,621.65 | 4.75 | 257,768.25 |
| 0007 | 303-02-00100 | Removal of Existing Patches | 500 | SQYD | 12.50 | 6,250.00 | 11.00 | 5,500.00 |
| 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 5,917 | CUYD | 21.80 | 128,990.60 | 15.00 | 88,755.00 |
| 0009 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 75 | CUYD | 35.00 | 2,625.00 | 50.00 | 3,750.00 |
| 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 28,987.1 | TON | 77.50 | 2,246,500.25 | 70.00 | 2,029,097.00 |
| 0011 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,152.8 | TON | 100.00 | 115,280.00 | 150.00 | 172,920.00 |
| 0012 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 25,850 | GAL | 3.30 | 85,305.00 | 3.10 | 80,135.00 |
| 0013 | 507-02-00200 | Aggregate (S2) | 38,016 | SQYD | 1.30 | 49,420.80 | 1.20 | 45,619.20 |
| 0014 | 507-02-00300 | Aggregate (S3) | 38,016 | SQYD | 1.10 | 41,817.60 | 1.00 | 38,016.00 |
| 0015 | 509-01-00100 | Cold Planing Asphaltic Pavement | 154,188 | SQYD | 1.45 | 223,572.60 | 2.00 | 308,376.00 |
| 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -12,986 | CUYD | 1.00 | -12,986.00 | 0.10 | -1,298.60 |
| 0017 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,500 | SQYD | 85.00 | 127,500.00 | 83.00 | 124,500.00 |
| 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 27,500.00 | 27,500.00 |
| 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 26.18 | MILE | 650.00 | 17,017.00 | 149.00 | 3,900.82 |
| 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 14.465 | MILE | 330.00 | 4,773.45 | 305.00 | 4,411.83 |
| 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 36.655 | MILE | 655.00 | 24,009.03 | 610.00 | 22,359.55 |
| 0022 | 713-05-00500 | Temporary Pavement Legends & Symbols (SCHOOL CROSSING) | 1 | EACH | 220.00 | 220.00 | 205.00 | 205.00 |
| 0023 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 714 | EACH | 1.50 | 1,071.00 | 1.40 | 999.60 |
| 0024 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 |
| 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | 261,000.00 | 261,000.00 |
| 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,076 | EACH | 5.00 | 10,380.00 | 4.70 | 9,757.20 |
| 0027 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 11 | LNFT | 5.50 | 60.50 | 5.00 | 55.00 |
| 0028 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 36.655 | MILE | 2,625.00 | 96,219.38 | 2,425.00 | 88,888.38 |
| 0029 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 14.465 | MILE | 765.00 | 11,065.73 | 710.00 | 10,270.15 |
| 0030 | 732-04-19000 | Plastic Pavement Legends and Symbols (SCHOOL CROSSING) | 1 | EACH | 545.00 | 545.00 | 510.00 | 510.00 |
| 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 9,500.00 | 9,500.00 |
| 0032 | NS-500-00280 | Surface Preparation | 1 | LUMP | 17,000.00 | 17,000.00 | 23,500.00 | 23,500.00 |
| 0033 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,266 | INLF | 1.35 | 1,709.10 | 1.30 | 1,645.80 |
| CONTRACTOR TOTAL | 4,107,453.59 | 4,148,754.58 | ||||||