| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - TRAYLOR BRO/MASSMAN CONST A JT VENT |
- 2 - FLATIRON CONST/JAMES CONST, A JT VT |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
100,000.00 |
100,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
40,000.00 |
40,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge (sta. 460+20, 36' x 2566.5')
|
1   |
EACH |
1,500,000.00 |
1,500,000.00 |
2,500,000.00 |
2,500,000.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
6,358.0 |
SQYD |
8.00 |
50,864.00 |
10.00 |
63,580.00 |
|
|
|
|
| 203-01 |
general excavation
|
1,403   |
CUYD |
13.50 |
18,940.50 |
14.00 |
19,642.00 |
|
|
|
|
| 203-04 |
embankment
|
19,735   |
CUYD |
33.00 |
651,255.00 |
36.00 |
710,460.00 |
|
|
|
|
| 203-05 |
nonplastic embankment
|
4,245   |
CUYD |
40.00 |
169,800.00 |
42.00 |
178,290.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
98   |
EACH |
10.00 |
980.00 |
10.00 |
980.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
5,131   |
LNFT |
3.50 |
17,958.50 |
3.30 |
16,932.30 |
|
|
|
|
| 302-02-C-01 |
class ii base course (10" thick) (crushed stone or
recycled pccp) |
12,700.9 |
SQYD |
34.00 |
431,830.60 |
32.00 |
406,428.80 |
|
|
|
|
| 401-01 |
aggregate surface course (net section)
|
8.7 |
CUYD |
115.00 |
1,000.50 |
110.00 |
957.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
200.0 |
CUYD |
82.00 |
16,400.00 |
82.00 |
16,400.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
11,512.5 |
TON |
85.00 |
978,562.50 |
86.00 |
990,075.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
192.3 |
TON |
140.00 |
26,922.00 |
148.00 |
28,460.40 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
439   |
SQYD |
20.00 |
8,780.00 |
22.00 |
9,658.00 |
|
|
|
|
| 703-03 |
perforated pipe underdrains
|
203   |
LNFT |
15.50 |
3,146.50 |
16.00 |
3,248.00 |
|
|
|
|
| 703-04 |
nonperforated pipe underdrains
|
77   |
LNFT |
15.00 |
1,155.00 |
15.00 |
1,155.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
275.0 |
LNFT |
18.00 |
4,950.00 |
18.00 |
4,950.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
75.0 |
LNFT |
58.00 |
4,350.00 |
56.00 |
4,200.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
3   |
EACH |
2,000.00 |
6,000.00 |
2,000.00 |
6,000.00 |
|
|
|
|
| 705-06-A |
chain link fence (4-foot height)
|
214   |
LNFT |
15.00 |
3,210.00 |
16.00 |
3,424.00 |
|
|
|
|
| 708-01 |
right-of-way monument
|
15   |
EACH |
206.00 |
3,090.00 |
252.00 |
3,780.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
15   |
EACH |
206.00 |
3,090.00 |
252.00 |
3,780.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb, 14" thick)
|
2,564   |
SQYD |
44.00 |
112,816.00 |
44.00 |
112,816.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
23,209   |
SQYD |
2.00 |
46,418.00 |
2.00 |
46,418.00 |
|
|
|
|
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
11,000.00 |
11,000.00 |
150,000.00 |
150,000.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
3.00 |
ACRE |
870.00 |
2,610.00 |
875.00 |
2,625.00 |
|
|
|
|
| 717-01 |
seeding
|
90   |
LB |
9.50 |
855.00 |
10.00 |
900.00 |
|
|
|
|
| 718-01 |
fertilizer
|
3,000   |
LB |
0.42 |
1,260.00 |
0.50 |
1,500.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
10,000.00 |
10,000.00 |
11,000.00 |
11,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
14,138,000.00 |
14,138,000.00 |
17,500,000.00 |
17,500,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
448.2 |
SQFT |
25.00 |
11,205.00 |
24.00 |
10,756.80 |
|
|
|
|
| 729-02 |
sign (type b)
|
29.7 |
SQFT |
24.00 |
712.80 |
25.00 |
742.50 |
|
|
|
|
| 729-04 |
sign (type d)
|
357.5 |
SQFT |
22.00 |
7,865.00 |
25.00 |
8,937.50 |
|
|
|
|
| 729-05 |
sign (type e)
|
56.4 |
SQFT |
28.00 |
1,579.20 |
28.00 |
1,579.20 |
|
|
|
|
| 729-06 |
sign (overhead mounted)
|
929.5 |
SQFT |
22.00 |
20,449.00 |
23.00 |
21,378.50 |
|
|
|
|
| 729-08-A |
mounting (2 1/2" post)
|
8   |
EACH |
620.00 |
4,960.00 |
610.00 |
4,880.00 |
|
|
|
|
| 729-08-B |
mounting (3 1/2" post)
|
15   |
EACH |
730.00 |
10,950.00 |
710.00 |
10,650.00 |
|
|
|
|
| 729-08-F |
mounting (w6 x 12)
|
2   |
EACH |
1,025.00 |
2,050.00 |
1,100.00 |
2,200.00 |
|
|
|
|
| 729-08-G |
mounting (w8 x 18)
|
2   |
EACH |
1,500.00 |
3,000.00 |
1,500.00 |
3,000.00 |
|
|
|
|
| 729-08-H |
mounting (w8 x 24)
|
2   |
EACH |
2,100.00 |
4,200.00 |
2,100.00 |
4,200.00 |
|
|
|
|
| 729-10 |
mounting (overhead truss)(structure mounted)
|
3   |
EACH |
62,000.00 |
186,000.00 |
6,200.00 |
18,600.00 |
|
|
|
|
| 729-12-A |
mounting (overhead butterfly)(structure mounted)
|
3   |
EACH |
17,500.00 |
52,500.00 |
18,000.00 |
54,000.00 |
|
|
|
|
| 729-13 |
mounting (bridge fascia mounted)
|
2   |
EACH |
3,900.00 |
7,800.00 |
4,000.00 |
8,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
6   |
EACH |
72.00 |
432.00 |
72.00 |
432.00 |
|
|
|
|
| 729-18 |
milepost assembly (structure mounted)
|
60   |
EACH |
115.00 |
6,900.00 |
115.00 |
6,900.00 |
|
|
|
|
| 729-19-C |
dead end road installations(type c)
|
4   |
EACH |
600.00 |
2,400.00 |
600.00 |
2,400.00 |
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
5,031   |
EACH |
14.00 |
70,434.00 |
13.00 |
65,403.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,592   |
EACH |
7.00 |
11,144.00 |
7.00 |
11,144.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
18.542 |
MILE |
2,500.00 |
46,355.00 |
2,200.00 |
40,792.40 |
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.098 |
MILE |
5,000.00 |
490.00 |
4,100.00 |
401.80 |
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line)(24" width)
|
0.109 |
MILE |
15,000.00 |
1,635.00 |
7,600.00 |
828.40 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.420 |
MILE |
1,000.00 |
420.00 |
1,250.00 |
525.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
165.00 |
330.00 |
210.00 |
420.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
200.00 |
400.00 |
260.00 |
520.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
0.178 |
MILE |
6,500.00 |
1,157.00 |
6,500.00 |
1,157.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
500,000.00 |
500,000.00 |
1,600,000.00 |
1,600,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
55,000.00 |
55,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 804-01-C |
precast concrete piles (16")
|
37,525   |
LNFT |
65.00 |
2,439,125.00 |
50.00 |
1,876,250.00 |
|
|
|
|
| 804-01-F |
precast concrete piles (24")
|
183,613   |
LNFT |
122.00 |
22,400,786.00 |
85.00 |
15,607,105.00 |
|
|
|
|
| 805-02-D |
class a(m) concrete (footings)
|
5,100.77 |
CUYD |
1,500.00 |
7,651,155.00 |
1,370.00 |
6,988,054.90 |
|
|
|
|
| 805-02-E |
class a(m) concrete (piers)
|
3,437.11 |
CUYD |
1,500.00 |
5,155,665.00 |
1,500.00 |
5,155,665.00 |
|
|
|
|
| 805-02-F |
class a(m) concrete (bents)
|
3,552.27 |
CUYD |
2,000.00 |
7,104,540.00 |
1,977.00 |
7,022,837.79 |
|
|
|
|
| 805-03 |
class aa concrete
|
28,642.79 |
CUYD |
1,100.00 |
31,507,069.00 |
1,363.00 |
39,040,122.77 |
|
|
|
|
| 805-08-C |
precast-prestressed concrete girder (type iii)
|
52,720.3 |
LNFT |
151.00 |
7,960,765.30 |
400.00 |
21,088,120.00 |
|
|
|
|
| 805-08-I |
precast-prestressed concrete girder (type bt-78)
|
38,853.4 |
LNFT |
295.00 |
11,461,753.00 |
600.00 |
23,312,040.00 |
|
|
|
|
| 805-11 |
strip seal joints
|
3,103.42 |
LNFT |
150.00 |
465,513.00 |
195.00 |
605,166.90 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
9,717,485   |
LB |
0.88 |
8,551,386.80 |
1.00 |
9,717,485.00 |
|
|
|
|
| 807-03 |
steel (astm a709, gr. 50w)
|
107,386   |
LB |
2.25 |
241,618.50 |
5.00 |
536,930.00 |
|
|
|
|
| 807-06 |
structural metalwork
|
lump |
LUMP |
300,000.00 |
300,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 810-01-A |
concrete railing (barrier)
|
39,217.17 |
LNFT |
32.50 |
1,274,558.02 |
38.00 |
1,490,252.46 |
|
|
|
|
| 810-01-B |
concrete railing (median barrier)
|
320.00 |
LNFT |
175.00 |
56,000.00 |
80.00 |
25,600.00 |
|
|
|
|
| 810-04 |
steel & concrete railing
|
235.17 |
LNFT |
275.00 |
64,671.75 |
150.00 |
35,275.50 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
494.93 |
SQYD |
140.00 |
69,290.20 |
300.00 |
148,479.00 |
|
|
|
|
| S-001 |
erosion control mat
|
6,227   |
SQYD |
21.00 |
130,767.00 |
23.00 |
143,221.00 |
|
|
|
|
| S-002 |
lightweight aggregate
|
18,824   |
CUYD |
75.00 |
1,411,800.00 |
80.00 |
1,505,920.00 |
|
|
|
|
| S-003 |
settlement cell & monitoring system
|
lump |
LUMP |
25,000.00 |
25,000.00 |
55,000.00 |
55,000.00 |
|
|
|
|
| S-004 |
prefabricated wick drains
|
63,870   |
LNFT |
1.20 |
76,644.00 |
2.00 |
127,740.00 |
|
|
|
|
| S-005 |
mounting (slab support)
|
15   |
EACH |
1,000.00 |
15,000.00 |
2,000.00 |
30,000.00 |
|
|
|
|
| S-006 |
light standard support
|
46   |
EACH |
1,300.00 |
59,800.00 |
2,000.00 |
92,000.00 |
|
|
|
|
| S-007 |
resident engineers, housing allowance
|
lump |
LUMP |
250,000.00 |
250,000.00 |
1,500,000.00 |
1,500,000.00 |
|
|
|
|
| S-101 |
class l concrete
|
98.21 |
CUYD |
1,250.00 |
122,762.50 |
1,100.00 |
108,031.00 |
|
|
|
|
| S-109 |
clearance gauges
|
4   |
EACH |
4,000.00 |
16,000.00 |
11,000.00 |
44,000.00 |
|
|
|
|
| S-110 |
construction camera system
|
lump |
LUMP |
225,000.00 |
225,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| S-111 |
impact attenuators (kinetic)
|
3   |
EACH |
24,000.00 |
72,000.00 |
28,000.00 |
84,000.00 |
|
|
|
|
| S-112 |
construction site survey
|
lump |
LUMP |
100,000.00 |
100,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| S-113 |
vibration monitoring
|
lump |
LUMP |
150,000.00 |
150,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| S-117 |
flexible post traffic delineators
|
420   |
EACH |
70.00 |
29,400.00 |
55.00 |
23,100.00 |
|
|
|
|
| S-119 |
o-cell concrete calibration pile
|
2   |
EACH |
120,000.00 |
240,000.00 |
250,000.00 |
500,000.00 |
|
|
|
|
| | SUBTOTAL GENERAL |
|
|
|
129,003,682.17 |
|
162,124,903.92 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE C |
precast concrete piles
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE C1 |
precast concrete piles (54")
|
|
|
|
|
|
|
|
|
|
|
| 804-01-I-01 |
precast concrete piles (54") (alt. c1)
|
29,800   |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 805-02-F-01 |
class a(m) concrete (bents) (alt. c1)
|
3,668.10 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 806-01-A |
deformed reinforcing steel (alt. c1)
|
802,814   |
LB |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE C2 |
precast concrete piles (30")
|
|
|
|
|
|
|
|
|
|
|
| 804-01-G-01 |
precast concrete piles (30") (alt. c2)
|
45,015   |
LNFT |
200.00 |
9,003,000.00 |
206.00 |
9,273,090.00 |
|
|
|
|
| 805-02-F-02 |
class a(m) concrete (bents) (alt. c2)
|
1,546.95 |
CUYD |
2,000.00 |
3,093,900.00 |
1,800.00 |
2,784,510.00 |
|
|
|
|
| 806-01-B |
deformed reinforcing steel (alt. c2)
|
387,010   |
LB |
0.88 |
340,568.80 |
1.00 |
387,010.00 |
|
|
|
|
| | SUBTOTAL ALT C2 |
|
|
|
12,437,468.80 |
|
12,444,610.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
141,441,150.97 |
|
174,569,513.92 |
|
|
|
|
|