| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - BARBER BROS. CONTRACTING CO., L.L.C |
- 4 - COASTAL BRIDGE CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
50,000.00 |
50,000.00 |
70,000.00 |
70,000.00 |
65,000.00 |
65,000.00 |
50,000.00 |
50,000.00 |
| 203-08 |
borrow (vehicular measurement)
|
129   |
CUYD |
25.00 |
3,225.00 |
21.00 |
2,709.00 |
30.00 |
3,870.00 |
20.00 |
2,580.00 |
| 502-01 |
superpave asphaltic concrete
|
3,655.5 |
TON |
50.00 |
182,775.00 |
69.00 |
252,229.50 |
55.00 |
201,052.50 |
70.00 |
255,885.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
412.4 |
TON |
100.00 |
41,240.00 |
6.60 |
2,721.84 |
80.00 |
32,992.00 |
125.00 |
51,550.00 |
| 509-01 |
cold planing asphaltic pavement
|
15,488   |
SQYD |
2.00 |
30,976.00 |
5.50 |
85,184.00 |
2.50 |
38,720.00 |
2.00 |
30,976.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 645   |
CUYD |
0.01 |
- 6.45 |
5.00 |
- 3,225.00 |
FREE |
FREE |
1.00 |
- 645.00 |
| 702-04-A |
adjusting manholes
|
2   |
EACH |
1,200.00 |
2,400.00 |
900.00 |
1,800.00 |
2,500.00 |
5,000.00 |
500.00 |
1,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
17,500.00 |
17,500.00 |
42,000.00 |
42,000.00 |
20,000.00 |
20,000.00 |
7,500.00 |
7,500.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
20   |
LNFT |
0.70 |
14.00 |
2.00 |
40.00 |
3.50 |
70.00 |
20.00 |
400.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
2.640 |
MILE |
500.00 |
1,320.00 |
150.00 |
396.00 |
500.00 |
1,320.00 |
300.00 |
792.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.400 |
MILE |
100.00 |
140.00 |
400.00 |
560.00 |
420.00 |
588.00 |
370.00 |
518.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
8.700 |
MILE |
10.00 |
87.00 |
600.00 |
5,220.00 |
650.00 |
5,655.00 |
575.00 |
5,002.50 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
50   |
SQYD |
75.00 |
3,750.00 |
87.00 |
4,350.00 |
120.00 |
6,000.00 |
45.00 |
2,250.00 |
| 724-02 |
pavement widening
|
3,485.0 |
SQYD |
35.00 |
121,975.00 |
4.40 |
15,334.00 |
38.00 |
132,430.00 |
48.00 |
167,280.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
57,000.00 |
57,000.00 |
35,000.00 |
35,000.00 |
55,000.00 |
55,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
6   |
EACH |
85.00 |
510.00 |
80.00 |
480.00 |
85.00 |
510.00 |
75.00 |
450.00 |
| 731-02 |
reflectorized raised pavement markers
|
174   |
EACH |
6.00 |
1,044.00 |
7.00 |
1,218.00 |
6.00 |
1,044.00 |
5.00 |
870.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
10   |
LNFT |
3.50 |
35.00 |
8.00 |
80.00 |
3.50 |
35.00 |
3.00 |
30.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.350 |
MILE |
2,200.00 |
9,570.00 |
2,400.00 |
10,440.00 |
2,500.00 |
10,875.00 |
2,000.00 |
8,700.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.700 |
MILE |
750.00 |
525.00 |
800.00 |
560.00 |
800.00 |
560.00 |
700.00 |
490.00 |
| 735-01 |
mailboxes
|
37   |
EACH |
6.00 |
222.00 |
10.00 |
370.00 |
6.00 |
222.00 |
1.00 |
37.00 |
| 735-02 |
mailbox supports (single)
|
37   |
EACH |
150.00 |
5,550.00 |
170.00 |
6,290.00 |
150.00 |
5,550.00 |
120.00 |
4,440.00 |
| 739-01 |
hydro-seeding
|
0.96 |
ACRE |
1,500.00 |
1,440.00 |
2,000.00 |
1,920.00 |
2,500.00 |
2,400.00 |
1,600.00 |
1,536.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
9,000.00 |
9,000.00 |
8,000.00 |
8,000.00 |
7,500.00 |
7,500.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
10,000.00 |
10,000.00 |
| S-001 |
cleaning existing ditches
|
300   |
LNFT |
10.00 |
3,000.00 |
10.00 |
3,000.00 |
35.00 |
10,500.00 |
15.00 |
4,500.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
542,291.55 |
|
579,677.34 |
|
599,393.50 |
|
668,641.50 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
78,000.00 |
78,000.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
129   |
CUYD |
36.00 |
4,644.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
3,655.5 |
TON |
68.00 |
248,574.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
412.4 |
TON |
142.00 |
58,560.80 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
15,488   |
SQYD |
2.25 |
34,848.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 645   |
CUYD |
0.10 |
- 64.50 |
|
|
|
|
|
|
| 702-04-A |
adjusting manholes
|
2   |
EACH |
1,800.00 |
3,600.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
78,000.00 |
78,000.00 |
|
|
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
20   |
LNFT |
0.70 |
14.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
2.640 |
MILE |
165.00 |
435.60 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.400 |
MILE |
300.00 |
420.00 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
8.700 |
MILE |
600.00 |
5,220.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
50   |
SQYD |
260.00 |
13,000.00 |
|
|
|
|
|
|
| 724-02 |
pavement widening
|
3,485.0 |
SQYD |
25.00 |
87,125.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
78,000.00 |
78,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
6   |
EACH |
120.00 |
720.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
174   |
EACH |
6.00 |
1,044.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
10   |
LNFT |
3.00 |
30.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.350 |
MILE |
2,400.00 |
10,440.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.700 |
MILE |
1,200.00 |
840.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
37   |
EACH |
14.00 |
518.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
37   |
EACH |
206.00 |
7,622.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
0.96 |
ACRE |
1,540.00 |
1,478.40 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
39,000.00 |
39,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| S-001 |
cleaning existing ditches
|
300   |
LNFT |
17.00 |
5,100.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
782,169.30 |
|
|
|
|
|
|
|