| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F. J. BURNELL, INC. |
- 2 - BEST-YET BUILDERS, LLC |
- 3 - QUALITY DESIGN & CONSTRUCTION, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
2,800.00 |
2,800.00 |
|
|
| 202-02-D |
removal of concrete walks and drives
|
120   |
SQYD |
8.00 |
960.00 |
6.00 |
720.00 |
21.00 |
2,520.00 |
|
|
| 202-02-I |
removal of portland concrete cement pavement and
curbing |
325   |
LNFT |
10.00 |
3,250.00 |
25.00 |
8,125.00 |
30.00 |
9,750.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
300   |
CUYD |
2.00 |
600.00 |
12.00 |
3,600.00 |
23.00 |
6,900.00 |
|
|
| 302-02-E |
class ii base course (8" thick)
|
407.3 |
SQYD |
16.00 |
6,516.80 |
25.00 |
10,182.50 |
33.00 |
13,440.90 |
|
|
| 601-01-I |
portland cement concrete pavement (9" thick)
|
370.9 |
SQYD |
60.00 |
22,254.00 |
80.00 |
29,672.00 |
59.00 |
21,883.10 |
|
|
| 701-03-I |
storm drain pipe (24" rcp)
|
63   |
LNFT |
100.00 |
6,300.00 |
70.00 |
4,410.00 |
62.00 |
3,906.00 |
|
|
| 702-03-A |
catch basin (cb-01)
|
1   |
EACH |
3,500.00 |
3,500.00 |
3,000.00 |
3,000.00 |
3,050.00 |
3,050.00 |
|
|
| 702-03-C |
catch basin (cb-06)
|
2   |
EACH |
4,500.00 |
9,000.00 |
4,000.00 |
8,000.00 |
3,169.00 |
6,338.00 |
|
|
| 702-04-B |
adjusting catch basin
|
4   |
EACH |
1,500.00 |
6,000.00 |
1,000.00 |
4,000.00 |
1,885.00 |
7,540.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
55.7 |
SQYD |
60.00 |
3,342.00 |
50.00 |
2,785.00 |
40.00 |
2,228.00 |
|
|
| 707-01 |
concrete curb
|
352.2 |
LNFT |
7.00 |
2,465.40 |
8.00 |
2,817.60 |
20.00 |
7,044.00 |
|
|
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
7,860.00 |
7,860.00 |
|
|
| 716-01-B |
mulch (fiber)
|
1.00 |
ACRE |
600.00 |
600.00 |
3,000.00 |
3,000.00 |
1,575.00 |
1,575.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
6,250.00 |
6,250.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
14   |
EACH |
20.00 |
280.00 |
6.00 |
84.00 |
7.00 |
98.00 |
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
358   |
LNFT |
1.25 |
447.50 |
0.75 |
268.50 |
0.50 |
179.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
81   |
LNFT |
3.50 |
283.50 |
2.00 |
162.00 |
0.90 |
72.90 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
30   |
LNFT |
20.00 |
600.00 |
5.00 |
150.00 |
3.00 |
90.00 |
|
|
| 732-04-A |
plastic pavement legends and symbols (arrow)
|
1   |
EACH |
200.00 |
200.00 |
150.00 |
150.00 |
95.00 |
95.00 |
|
|
| 732-04-C |
plastic pavement legends and symbols (only)
|
1   |
EACH |
210.00 |
210.00 |
175.00 |
175.00 |
125.00 |
125.00 |
|
|
| 732-05 |
removal of existing markings
|
0.069 |
MILE |
7,000.00 |
483.00 |
4,000.00 |
276.00 |
1,848.00 |
127.51 |
|
|
| 736-09 |
loop detector
|
140   |
LNFT |
20.00 |
2,800.00 |
14.29 |
2,000.60 |
20.00 |
2,800.00 |
|
|
| 739-01 |
hydro-seeding
|
1.00 |
ACRE |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
1,000.00 |
1,000.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
2,780.00 |
2,780.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
14,500.00 |
14,500.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
98,592.20 |
|
116,578.20 |
|
124,952.41 |
|
|
|