| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - LOUISIANA BRIDGE, INC. |
- 2 - BEN ALLEN, INC. |
- 3 - SHILOH CONTRACTORS, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
16,000.00 |
16,000.00 |
20,000.00 |
20,000.00 |
3,000.00 |
3,000.00 |
|
|
| 202-02-A-01 |
removal of bridge(sta. 15+77.00; 24.87'wide x
152.80'long, 9 span timber bridge with asphalt overlay) |
1   |
EACH |
13,700.00 |
13,700.00 |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
18,000.00 |
18,000.00 |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
12   |
EACH |
7.00 |
84.00 |
FREE |
FREE |
1.00 |
12.00 |
|
|
| 204-03 |
temporary slope drains
|
200   |
LNFT |
1.00 |
200.00 |
FREE |
FREE |
1.00 |
200.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
3   |
EACH |
85.00 |
255.00 |
FREE |
FREE |
1.00 |
3.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,000   |
LNFT |
1.70 |
1,700.00 |
FREE |
FREE |
3.50 |
3,500.00 |
|
|
| 302-01 |
class ii base course
|
218.9 |
CUYD |
65.00 |
14,228.50 |
100.00 |
21,890.00 |
85.00 |
18,606.50 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
35   |
CUYD |
65.00 |
2,275.00 |
100.00 |
3,500.00 |
90.00 |
3,150.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
176.5 |
TON |
140.00 |
24,710.00 |
140.00 |
24,710.00 |
200.00 |
35,300.00 |
|
|
| 701-05-M-01 |
side drain pipe (36")(erosion)
|
200   |
LNFT |
65.60 |
13,120.00 |
70.00 |
14,000.00 |
56.00 |
11,200.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
62.50 |
6,250.00 |
55.00 |
5,500.00 |
60.00 |
6,000.00 |
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
40.00 |
4,000.00 |
35.00 |
3,500.00 |
27.00 |
2,700.00 |
|
|
| 711-01-C |
riprap (30 lb,14" thick)
|
560   |
SQYD |
45.00 |
25,200.00 |
62.00 |
34,720.00 |
60.00 |
33,600.00 |
|
|
| 711-04 |
geotextile fabric
|
560   |
SQYD |
3.00 |
1,680.00 |
3.00 |
1,680.00 |
3.50 |
1,960.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
3,000.00 |
3,000.00 |
2,000.00 |
2,000.00 |
3,500.00 |
3,500.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
24,000.00 |
24,000.00 |
27,000.00 |
27,000.00 |
65,000.00 |
65,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
80.00 |
640.00 |
70.00 |
560.00 |
90.00 |
720.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
4,000.00 |
4,000.00 |
3,500.00 |
3,500.00 |
3,500.00 |
3,500.00 |
|
|
| 804-01-B |
precast concrete piles (14")
|
1,944   |
LNFT |
45.00 |
87,480.00 |
43.00 |
83,592.00 |
46.00 |
89,424.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
FREE |
FREE |
FREE |
FREE |
|
|
| 805-10-A |
bridge superstructure & substructure(24 ft. clear
roadway,60 degree crossing) |
8   |
SPAN |
17,000.00 |
136,000.00 |
20,000.00 |
160,000.00 |
21,000.00 |
168,000.00 |
|
|
| S-101 |
concrete approach slab(24 ft. clear roadway,60 degree
crossing)(w/out asphalt) |
2   |
EACH |
6,500.00 |
13,000.00 |
7,000.00 |
14,000.00 |
7,500.00 |
15,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
409,523.50 |
|
465,152.00 |
|
494,375.50 |
|
|
|