| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - SHILOH CONTRACTORS, INC. |
- 2 - GUINN BROTHERS, LLC. |
- 3 - F. MILLER & SONS, LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
4,500.00 |
4,500.00 |
14,000.00 |
14,000.00 |
22,100.00 |
22,100.00 |
|
|
| 202-02-A-01 |
removal of bridge(sta. 5+49.01; 17.90' w. x 30.70' l.
timber bridge) |
1   |
EACH |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
37,900.00 |
37,900.00 |
|
|
| 202-02-A-02 |
removal of bridge( sta.4+10.33; 20.20'w x 38.68' l.
timber bridge) |
1   |
EACH |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
30,200.00 |
30,200.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
19,000.00 |
19,000.00 |
25,000.00 |
25,000.00 |
70,400.00 |
70,400.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
32   |
EACH |
1.00 |
32.00 |
10.00 |
320.00 |
10.00 |
320.00 |
|
|
| 204-03 |
temporary slope drains
|
240   |
LNFT |
1.00 |
240.00 |
1.00 |
240.00 |
9.00 |
2,160.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
16   |
EACH |
1.00 |
16.00 |
100.00 |
1,600.00 |
130.00 |
2,080.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,450   |
LNFT |
3.00 |
4,350.00 |
2.00 |
2,900.00 |
1.40 |
2,030.00 |
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
196.6 |
CUYD |
75.00 |
14,745.00 |
100.00 |
19,660.00 |
90.00 |
17,694.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
60.00 |
12,000.00 |
62.00 |
12,400.00 |
55.00 |
11,000.00 |
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
200.0 |
LNFT |
27.00 |
5,400.00 |
32.00 |
6,400.00 |
28.00 |
5,600.00 |
|
|
| 711-01-C |
riprap (30 lb,14" thick )
|
535   |
SQYD |
55.00 |
29,425.00 |
55.00 |
29,425.00 |
53.00 |
28,355.00 |
|
|
| 711-04 |
geotextile fabric
|
535   |
SQYD |
3.00 |
1,605.00 |
5.00 |
2,675.00 |
2.60 |
1,391.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
3,000.00 |
3,000.00 |
15,000.00 |
15,000.00 |
37,500.00 |
37,500.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
45,000.00 |
45,000.00 |
36,000.00 |
36,000.00 |
50,000.00 |
50,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
90.00 |
1,440.00 |
80.00 |
1,280.00 |
62.00 |
992.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,000.00 |
3,000.00 |
9,000.00 |
9,000.00 |
35,000.00 |
35,000.00 |
|
|
| 804-01-B |
precast concrete piles (14")
|
993   |
LNFT |
46.00 |
45,678.00 |
42.00 |
41,706.00 |
67.50 |
67,027.50 |
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
FREE |
FREE |
1.00 |
2.00 |
100.00 |
200.00 |
|
|
| 805-10-A |
bridge superstructure & substructure(24'clear
roadway,90 degree crossing) |
4   |
SPAN |
20,000.00 |
80,000.00 |
21,500.00 |
86,000.00 |
15,200.00 |
60,800.00 |
|
|
| 805-10-B |
bridge superstructure & substructure(24' clear
roadway,90 degree crossing; cast-in-place) |
3   |
SPAN |
21,500.00 |
64,500.00 |
22,500.00 |
67,500.00 |
24,900.00 |
74,700.00 |
|
|
| S-101 |
concrete approach slabs(24' clear roadway,90 degree
crossing){w/out asphalt } |
4   |
EACH |
5,500.00 |
22,000.00 |
7,500.00 |
30,000.00 |
7,400.00 |
29,600.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
359,931.00 |
|
411,108.00 |
|
587,049.50 |
|
|
|