| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BEN ALLEN, INC. |
- 2 - GUINN BROTHERS, LLC. |
- 3 - SHILOH CONTRACTORS, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
28,000.00 |
28,000.00 |
5,000.00 |
5,000.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-A-01 |
removal of bridge(sta. 10+00; 18.00 ft wide x
46.00 ft.long)(timber bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
40,000.00 |
40,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
14   |
EACH |
FREE |
FREE |
10.00 |
140.00 |
1.00 |
14.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
FREE |
FREE |
100.00 |
400.00 |
1.00 |
4.00 |
|
|
| 204-06 |
temporary silt fencing
|
847   |
LNFT |
FREE |
FREE |
3.00 |
2,541.00 |
3.50 |
2,964.50 |
|
|
| 502-01 |
superpave asphaltic concrete
|
572.1 |
TON |
135.00 |
77,233.50 |
225.00 |
128,722.50 |
185.00 |
105,838.50 |
|
|
| 701-05-G-01 |
side drain pipe (18")(erosion)
|
125   |
LNFT |
40.00 |
5,000.00 |
70.00 |
8,750.00 |
36.00 |
4,500.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
62.00 |
6,200.00 |
55.00 |
5,500.00 |
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
35.00 |
3,500.00 |
32.00 |
3,200.00 |
35.00 |
3,500.00 |
|
|
| 711-01-C |
riprap (30 lb,14" thick)
|
288   |
SQYD |
62.00 |
17,856.00 |
50.00 |
14,400.00 |
55.00 |
15,840.00 |
|
|
| 711-04 |
geotextile fabric
|
288   |
SQYD |
3.00 |
864.00 |
5.00 |
1,440.00 |
3.00 |
864.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
500.00 |
500.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
28,500.00 |
28,500.00 |
25,000.00 |
25,000.00 |
85,000.00 |
85,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
70.00 |
560.00 |
75.00 |
600.00 |
70.00 |
560.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,000.00 |
3,000.00 |
4,500.00 |
4,500.00 |
3,500.00 |
3,500.00 |
|
|
| 804-01-B |
precast concrete piles (14")
|
1,420   |
LNFT |
44.00 |
62,480.00 |
40.00 |
56,800.00 |
46.00 |
65,320.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
FREE |
FREE |
1.00 |
1.00 |
FREE |
FREE |
|
|
| 805-10-A |
bridge superstructure & substructure(28 ft. clear
roadway,60 degree crossing) |
4   |
SPAN |
22,000.00 |
88,000.00 |
21,500.00 |
86,000.00 |
22,000.00 |
88,000.00 |
|
|
| S-101 |
concrete approach slab(28 ft.clear roadway,60 degree
crossing)(w/out asphalt) |
2   |
EACH |
7,500.00 |
15,000.00 |
8,000.00 |
16,000.00 |
8,500.00 |
17,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
365,993.50 |
|
394,694.50 |
|
473,405.00 |
|
|
|