| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - SHILOH CONTRACTORS, INC. |
- 2 - GUINN BROTHERS, LLC. |
- 3 - F. J. BURNELL, INC. |
- 4 - BEST-YET BUILDERS, LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
1,200.00 |
1,200.00 |
5,000.00 |
5,000.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
| 202-02-A-01 |
removal of bridge (24.2' w x 105.6' l timber bridge)
|
1   |
EACH |
3,500.00 |
3,500.00 |
12,000.00 |
12,000.00 |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
264.0 |
SQYD |
6.50 |
1,716.00 |
5.00 |
1,320.00 |
5.00 |
1,320.00 |
5.00 |
1,320.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
10,000.00 |
10,000.00 |
13,000.00 |
13,000.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
| 204-02 |
temporary hay or straw bales
|
12   |
EACH |
1.00 |
12.00 |
10.00 |
120.00 |
15.00 |
180.00 |
10.00 |
120.00 |
| 204-03 |
temporary slope drains
|
590   |
LNFT |
1.00 |
590.00 |
1.00 |
590.00 |
10.00 |
5,900.00 |
1.00 |
590.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
6   |
EACH |
1.00 |
6.00 |
100.00 |
600.00 |
100.00 |
600.00 |
500.00 |
3,000.00 |
| 204-06 |
temporary silt fencing
|
700   |
LNFT |
3.00 |
2,100.00 |
3.00 |
2,100.00 |
1.50 |
1,050.00 |
2.50 |
1,750.00 |
| 302-01 |
class ii base course
|
137.0 |
CUYD |
85.00 |
11,645.00 |
100.00 |
13,700.00 |
65.00 |
8,905.00 |
50.00 |
6,850.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
23   |
CUYD |
85.00 |
1,955.00 |
100.00 |
2,300.00 |
75.00 |
1,725.00 |
50.00 |
1,150.00 |
| 502-01 |
superpave asphaltic concrete
|
107.7 |
TON |
165.00 |
17,770.50 |
200.00 |
21,540.00 |
150.00 |
16,155.00 |
125.00 |
13,462.50 |
| 701-05-I |
side drain pipe (24")
|
24   |
LNFT |
42.00 |
1,008.00 |
125.00 |
3,000.00 |
50.00 |
1,200.00 |
70.00 |
1,680.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
50.0 |
LNFT |
60.00 |
3,000.00 |
56.00 |
2,800.00 |
55.00 |
2,750.00 |
75.00 |
3,750.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
50.0 |
LNFT |
27.00 |
1,350.00 |
30.00 |
1,500.00 |
28.00 |
1,400.00 |
60.00 |
3,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,100.00 |
4,200.00 |
2,200.00 |
4,400.00 |
2,000.00 |
4,000.00 |
2,400.00 |
4,800.00 |
| 705-01 |
barbed wire fence
|
104   |
LNFT |
12.00 |
1,248.00 |
17.50 |
1,820.00 |
6.00 |
624.00 |
5.00 |
520.00 |
| 707-04 |
asphaltic curb
|
40.0 |
LNFT |
8.00 |
320.00 |
25.00 |
1,000.00 |
30.00 |
1,200.00 |
8.00 |
320.00 |
| 711-01-C |
riprap (30 lb,14" thick)
|
530   |
SQYD |
60.00 |
31,800.00 |
55.00 |
29,150.00 |
50.00 |
26,500.00 |
50.00 |
26,500.00 |
| 711-04 |
geotextile fabric
|
530   |
SQYD |
3.00 |
1,590.00 |
5.00 |
2,650.00 |
2.00 |
1,060.00 |
2.00 |
1,060.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
2,500.00 |
2,500.00 |
10,000.00 |
10,000.00 |
7,000.00 |
7,000.00 |
10,000.00 |
10,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
34,500.00 |
34,500.00 |
25,000.00 |
25,000.00 |
13,000.00 |
13,000.00 |
25,000.00 |
25,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
6   |
EACH |
90.00 |
540.00 |
85.00 |
510.00 |
75.00 |
450.00 |
75.00 |
450.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
2,250.00 |
2,250.00 |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
| 804-01-B |
precast concrete piles (14")
|
1,365   |
LNFT |
42.00 |
57,330.00 |
42.00 |
57,330.00 |
46.00 |
62,790.00 |
40.00 |
54,600.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
FREE |
FREE |
1.00 |
1.00 |
500.00 |
500.00 |
FREE |
FREE |
| 805-10-A |
bridge superstructure & substructure (24' rdwy.,
90 degree crossing) |
6   |
SPAN |
20,000.00 |
120,000.00 |
19,250.00 |
115,500.00 |
23,500.00 |
141,000.00 |
25,000.00 |
150,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
312,130.50 |
|
332,931.00 |
|
344,309.00 |
|
369,922.50 |
|