| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
20,293   |
CUYD |
14.00 |
284,102.00 |
15.00 |
304,395.00 |
20.00 |
405,860.00 |
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
4,483   |
CUYD |
7.25 |
32,501.75 |
15.00 |
67,245.00 |
20.00 |
89,660.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
98,958.1 |
TON |
58.00 |
5,739,569.80 |
58.50 |
5,789,048.85 |
78.00 |
7,718,731.80 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
80,262   |
SQYD |
1.25 |
100,327.50 |
1.50 |
120,393.00 |
2.00 |
160,524.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,234   |
CUYD |
0.01 |
- 22.34 |
0.10 |
- 223.40 |
1.00 |
- 2,234.00 |
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
9,000   |
LNFT |
2.00 |
18,000.00 |
1.10 |
9,900.00 |
1.50 |
13,500.00 |
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
15,309   |
LNFT |
2.00 |
30,618.00 |
1.40 |
21,432.60 |
1.75 |
26,790.75 |
|
|
| 602-05-I-01 |
full depth patching of jointed conc pvmt (9" thick)
(16.0 sq yds & under) |
198.4 |
SQYD |
135.00 |
26,784.00 |
142.00 |
28,172.80 |
160.00 |
31,744.00 |
|
|
| 602-05-I-02 |
full depth patching of jointed conc pvmt (9" thick)
(16.1 - 48.0 sq yds) |
245.1 |
SQYD |
110.00 |
26,961.00 |
113.00 |
27,696.30 |
140.00 |
34,314.00 |
|
|
| 602-05-I-03 |
full depth patching of jointed conc pvmt (9" thick)
(48.1 sq yds & over) |
3,703.6 |
SQYD |
100.00 |
370,360.00 |
102.00 |
377,767.20 |
120.00 |
444,432.00 |
|
|
| 602-05-K-01 |
full depth patching of jointed conc pvmt (10" thick)
(16.0 sq yds & under) |
1,274.5 |
SQYD |
150.00 |
191,175.00 |
142.00 |
180,979.00 |
160.00 |
203,920.00 |
|
|
| 602-05-K-02 |
full depth patching of jointed conc pvmt (10" thick)
(16.1-48.0 sq yds) |
1,243.8 |
SQYD |
125.00 |
155,475.00 |
113.00 |
140,549.40 |
140.00 |
174,132.00 |
|
|
| 602-05-K-03 |
full depth patching of jointed conc pvmt (10" thick)
(48.1 sq yds & over) |
440.1 |
SQYD |
115.00 |
50,611.50 |
102.00 |
44,890.20 |
120.00 |
52,812.00 |
|
|
| 703-01 |
shoulder underdrain systems
|
51,391   |
LNFT |
10.00 |
513,910.00 |
9.65 |
495,923.15 |
9.00 |
462,519.00 |
|
|
| 703-02 |
shoulder outlet underdrains
|
208   |
EACH |
350.00 |
72,800.00 |
550.00 |
114,400.00 |
600.00 |
124,800.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
300,000.00 |
300,000.00 |
450,000.00 |
450,000.00 |
280,000.00 |
280,000.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
42.576 |
MILE |
850.00 |
36,189.60 |
900.00 |
38,318.40 |
1,000.00 |
42,576.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
38.72 |
ACRE |
600.00 |
23,232.00 |
329.00 |
12,738.88 |
350.00 |
13,552.00 |
|
|
| 717-01 |
seeding
|
1,742   |
LB |
7.00 |
12,194.00 |
11.00 |
19,162.00 |
12.00 |
20,904.00 |
|
|
| 718-01 |
fertilizer
|
38,720   |
LB |
0.35 |
13,552.00 |
0.57 |
22,070.40 |
0.50 |
19,360.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
300,000.00 |
300,000.00 |
425,000.00 |
425,000.00 |
1,200,000.00 |
1,200,000.00 |
|
|
| 729-17 |
milepost assembly (ground mounted)
|
10   |
EACH |
300.00 |
3,000.00 |
285.00 |
2,850.00 |
125.00 |
1,250.00 |
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
208   |
EACH |
10.00 |
2,080.00 |
11.00 |
2,288.00 |
16.00 |
3,328.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,908   |
EACH |
5.00 |
9,540.00 |
6.00 |
11,448.00 |
7.00 |
13,356.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
3,373   |
LNFT |
1.50 |
5,059.50 |
0.91 |
3,069.43 |
1.20 |
4,047.60 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
742   |
LNFT |
4.50 |
3,339.00 |
2.73 |
2,025.66 |
2.50 |
1,855.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
21.288 |
MILE |
1,900.00 |
40,447.20 |
2,700.00 |
57,477.60 |
3,000.00 |
63,864.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
10.925 |
MILE |
600.00 |
6,555.00 |
910.00 |
9,941.75 |
1,000.00 |
10,925.00 |
|
|
| 732-05 |
removal of existing markings
|
11.100 |
MILE |
650.00 |
7,215.00 |
4,000.00 |
44,400.00 |
5,000.00 |
55,500.00 |
|
|
| 734-01 |
rubblizing portland cement concrete pavement
|
133,823   |
SQYD |
2.25 |
301,101.75 |
2.82 |
377,380.86 |
3.60 |
481,762.80 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
61,000.00 |
61,000.00 |
174,000.00 |
174,000.00 |
72,000.00 |
72,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
25,000.00 |
25,000.00 |
450,000.00 |
450,000.00 |
400,000.00 |
400,000.00 |
|
|
| S-001 |
cement treated base course (12 in depth)
|
59,857   |
SQYD |
9.00 |
538,713.00 |
9.25 |
553,677.25 |
9.00 |
538,713.00 |
|
|
| S-002 |
milling existing pavement
|
10,597   |
SQYD |
5.00 |
52,985.00 |
5.00 |
52,985.00 |
6.00 |
63,582.00 |
|
|
| S-003 |
rumble strips (ground-in)
|
10.6 |
MILE |
1,500.00 |
15,900.00 |
950.00 |
10,070.00 |
1,000.00 |
10,600.00 |
|
|
| S-004 |
dynamic message sign unit
|
4   |
EACH |
4,500.00 |
18,000.00 |
20,000.00 |
80,000.00 |
20,000.00 |
80,000.00 |
|
|
| S-922 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
9,000   |
LNFT |
2.00 |
18,000.00 |
1.14 |
10,260.00 |
1.50 |
13,500.00 |
|
|
| S-923 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
15,309   |
LNFT |
2.00 |
30,618.00 |
1.43 |
21,891.87 |
1.70 |
26,025.30 |
|
|
| S-927 |
sawcuts in asphaltic concrete lifts
|
68,562   |
LNFT |
1.50 |
102,843.00 |
0.85 |
58,277.70 |
1.00 |
68,562.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
9,539,737.26 |
|
10,611,901.90 |
|
13,426,768.25 |
|
|
|