Letting of 12/14/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 272-02-0012
Parish: LIVINGSTON
Routes: LA 63
Description: SOUTH END I-12 O'PASS - E. JCT. U.S. 190
Type Const: grading, cold planing acp, cement treated bc, superpave acp ovly, pvmt patch, and
related work.
 
RankLicenseBidderAmount
106276 BARRIERE CONSTRUCTION CO., LLC. $692,290.38
200849 F.G. SULLIVAN, JR. CONTRACTOR LLC $749,723.60
312487 DIAMOND B CONSTRUCTION CO., L.L.C. $799,855.39
400481 COASTAL BRIDGE CO., L.L.C. $825,034.21
500046 BARBER BROS. CONTRACTING CO., L.L.C $829,124.60
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC.
- 2 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 4 -
COASTAL BRIDGE CO., L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks and drives 7      SQYD 10.00 70.00 25.00 175.00 11.00 77.00 100.00 700.00
202-02-H removal of guard rail 472      LNFT 4.00 1,888.00 4.00 1,888.00 4.00 1,888.00 10.00 4,720.00
203-08 borrow (vehicular measurement) 1,108      CUYD 13.00 14,404.00 15.00 16,620.00 32.00 35,456.00 15.00 16,620.00
203-08-A borrow (vehicular measurement)(selected soils) 652      CUYD 13.00 8,476.00 15.00 9,780.00 22.00 14,344.00 18.00 11,736.00
502-01 superpave asphaltic concrete 5,474.9    TON 56.00 306,594.40 45.00 246,370.50 60.00 328,494.00 69.00 377,768.10
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
704.1    TON 56.00 39,429.60 45.00 31,684.50 130.00 91,533.00 90.00 63,369.00
509-01 cold planing asphaltic pavement 22,467      SQYD 2.00 44,934.00 2.00 44,934.00 1.43 32,127.81 2.25 50,550.75
509-02 contractor retained reclaimed asphaltic pavement - 624      CUYD 5.00 - 3,120.00 0.01 - 6.24 0.10 - 62.40 10.00 - 6,240.00
701-08 relaying pipe 18      LNFT 350.00 6,300.00 200.00 3,600.00 100.00 1,800.00 100.00 1,800.00
701-15 concrete collar 3      EACH 800.00 2,400.00 900.00 2,700.00 750.00 2,250.00 1,500.00 4,500.00
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 125.0    LNFT 55.00 6,875.00 52.00 6,500.00 57.00 7,125.00 70.00 8,750.00
704-03 blocked out guard rail 125.0    LNFT 20.00 2,500.00 17.00 2,125.00 20.00 2,500.00 20.00 2,500.00
704-05 guard rail anchor sections (bct) 18.8    LNFT 70.00 1,316.00 70.00 1,316.00 74.00 1,391.20 65.00 1,222.00
704-07-A guard rail bridge attachments (single thrie beam) 75.0    LNFT 32.00 2,400.00 40.00 3,000.00 40.00 3,000.00 35.00 2,625.00
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 60.00 6,000.00 55.00 5,500.00 63.00 6,300.00 50.00 5,000.00
704-11-B guard rail end treatment (tangent) 6      EACH 2,400.00 14,400.00 2,200.00 13,200.00 2,500.00 15,000.00 2,850.00 17,100.00
706-01-A concrete walk(4" thick) 7.1    SQYD 300.00 2,130.00 135.00 958.50 1,800.00 12,780.00 100.00 710.00
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 52,000.00 52,000.00 5,000.00 5,000.00 12,500.00 12,500.00
713-03-C temporary pavement markings (8" width) 510      LNFT 0.50 255.00 0.20 102.00 0.25 127.50 0.45 229.50
713-03-E temporary pavement markings (24" width) 744      LNFT 1.50 1,116.00 0.70 520.80 1.00 744.00 1.35 1,004.40
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
6.990  MILE 32.00 223.68 500.00 3,495.00 160.00 1,118.40 300.00 2,097.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
3.210  MILE 400.00 1,284.00 100.00 321.00 300.00 963.00 370.00 1,187.70
713-05-A temporary pavement markings (solid line)(4" width) 14.004  MILE 800.00 11,203.20 10.00 140.04 570.00 7,982.28 740.00 10,362.96
713-06-A temporary pavement legends and symbols (arrow) 6      EACH 60.00 360.00 25.00 150.00 57.00 342.00 54.00 324.00
713-06-C temporary pavement legends and symbols (only) 6      EACH 60.00 360.00 25.00 150.00 57.00 342.00 54.00 324.00
722-01 project site laboratory 1      each 500.00 500.00 1,000.00 1,000.00 9,000.00 9,000.00 5,000.00 5,000.00
724-01-B pavement patching (12" minimum thickness) 550      SQYD 42.00 23,100.00 75.00 41,250.00 85.00 46,750.00 45.00 24,750.00
726-01 bedding material 4.4    CUYD 60.00 264.00 120.00 528.00 63.00 277.20 150.00 660.00
727-01 mobilization lump      LUMP 34,000.00 34,000.00 100,000.00 100,000.00 21,000.00 21,000.00 70,000.00 70,000.00
729-16-C object marker assembly (type 3) 8      EACH 75.00 600.00 70.00 560.00 80.00 640.00 75.00 600.00
731-02 reflectorized raised pavement markers 501      EACH 6.00 3,006.00 6.00 3,006.00 5.00 2,505.00 5.20 2,605.20
732-01-C plastic pavement striping (8" width) 170      LNFT 1.40 238.00 1.50 255.00 1.00 170.00 0.90 153.00
732-01-E plastic pavement striping (24" width) 248      LNFT 9.00 2,232.00 10.00 2,480.00 3.00 744.00 8.70 2,157.60
732-02-A plastic pavement striping (solid line) (4" width) 4.668  MILE 2,200.00 10,269.60 2,500.00 11,670.00 2,200.00 10,269.60 2,200.00 10,269.60
732-03-A plastic pavement striping (broken line)(4" width) 1.070  MILE 650.00 695.50 750.00 802.50 900.00 963.00 620.00 663.40
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 150.00 300.00 150.00 300.00 170.00 340.00 150.00 300.00
732-04-C plastic pavement legends & symbols (only) 2      EACH 160.00 320.00 175.00 350.00 170.00 340.00 150.00 300.00
735-01 mailboxes 11      EACH 6.00 66.00 1.00 11.00 13.00 143.00 5.00 55.00
735-02 mailbox supports (single) 11      EACH 140.00 1,540.00 150.00 1,650.00 300.00 3,300.00 120.00 1,320.00
736-09 loop detector 300      LNFT 13.00 3,900.00 10.00 3,000.00 14.00 4,200.00 12.00 3,600.00
736-10 underground junction box 1      EACH 300.00 300.00 300.00 300.00 300.00 300.00 250.00 250.00
739-01 hydro-seeding 2.01   ACRE 1,200.00 2,412.00 1,100.00 2,211.00 1,300.00 2,613.00 2,000.00 4,020.00
740-01 construction layout lump      LUMP 7,000.00 7,000.00 15,000.00 15,000.00 6,200.00 6,200.00 10,000.00 10,000.00
744-01 traffic control management lump      LUMP 10,000.00 10,000.00 15,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00
S-001 u-channel post installation 37      each 70.00 2,590.00 70.00 2,590.00 75.00 2,775.00 70.00 2,590.00
S-002 cleaning existing ditches 100      LNFT 12.00 1,200.00 12.00 1,200.00 4.00 400.00 15.00 1,500.00
S-003 cement treated base course (12 inch depth) 16,556      SQYD 6.40 105,958.40 6.00 99,336.00 6.30 104,302.80 5.00 82,780.00
                       
 CONTRACTOR TOTAL       692,290.38   749,723.60   799,855.39   825,034.21
 
Item Number Item Description Quantity Unit of Measure - 5 -
BARBER BROS. CONTRACTING CO., L.L.C

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks and drives 7      SQYD 100.00 700.00            
202-02-H removal of guard rail 472      LNFT 15.00 7,080.00            
203-08 borrow (vehicular measurement) 1,108      CUYD 20.00 22,160.00            
203-08-A borrow (vehicular measurement)(selected soils) 652      CUYD 18.00 11,736.00            
502-01 superpave asphaltic concrete 5,474.9    TON 55.00 301,119.50            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
704.1    TON 75.00 52,807.50            
509-01 cold planing asphaltic pavement 22,467      SQYD 2.50 56,167.50            
509-02 contractor retained reclaimed asphaltic pavement - 624      CUYD FREE FREE            
701-08 relaying pipe 18      LNFT 200.00 3,600.00            
701-15 concrete collar 3      EACH 1,000.00 3,000.00            
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 125.0    LNFT 60.00 7,500.00            
704-03 blocked out guard rail 125.0    LNFT 25.00 3,125.00            
704-05 guard rail anchor sections (bct) 18.8    LNFT 75.00 1,410.00            
704-07-A guard rail bridge attachments (single thrie beam) 75.0    LNFT 40.00 3,000.00            
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 65.00 6,500.00            
704-11-B guard rail end treatment (tangent) 6      EACH 2,600.00 15,600.00            
706-01-A concrete walk(4" thick) 7.1    SQYD 200.00 1,420.00            
713-01 temporary signs & barricades lump      LUMP 50,000.00 50,000.00            
713-03-C temporary pavement markings (8" width) 510      LNFT 1.00 510.00            
713-03-E temporary pavement markings (24" width) 744      LNFT 2.00 1,488.00            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
6.990  MILE 450.00 3,145.50            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
3.210  MILE 420.00 1,348.20            
713-05-A temporary pavement markings (solid line)(4" width) 14.004  MILE 850.00 11,903.40            
713-06-A temporary pavement legends and symbols (arrow) 6      EACH 75.00 450.00            
713-06-C temporary pavement legends and symbols (only) 6      EACH 75.00 450.00            
722-01 project site laboratory 1      each 10,000.00 10,000.00            
724-01-B pavement patching (12" minimum thickness) 550      SQYD 65.00 35,750.00            
726-01 bedding material 4.4    CUYD 120.00 528.00            
727-01 mobilization lump      LUMP 50,000.00 50,000.00            
729-16-C object marker assembly (type 3) 8      EACH 80.00 640.00            
731-02 reflectorized raised pavement markers 501      EACH 6.00 3,006.00            
732-01-C plastic pavement striping (8" width) 170      LNFT 2.00 340.00            
732-01-E plastic pavement striping (24" width) 248      LNFT 10.00 2,480.00            
732-02-A plastic pavement striping (solid line) (4" width) 4.668  MILE 2,500.00 11,670.00            
732-03-A plastic pavement striping (broken line)(4" width) 1.070  MILE 1,000.00 1,070.00            
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 200.00 400.00            
732-04-C plastic pavement legends & symbols (only) 2      EACH 200.00 400.00            
735-01 mailboxes 11      EACH 6.00 66.00            
735-02 mailbox supports (single) 11      EACH 150.00 1,650.00            
736-09 loop detector 300      LNFT 15.00 4,500.00            
736-10 underground junction box 1      EACH 500.00 500.00            
739-01 hydro-seeding 2.01   ACRE 1,500.00 3,015.00            
740-01 construction layout lump      LUMP 10,000.00 10,000.00            
744-01 traffic control management lump      LUMP 15,000.00 15,000.00            
S-001 u-channel post installation 37      each 75.00 2,775.00            
S-002 cleaning existing ditches 100      LNFT 15.00 1,500.00            
S-003 cement treated base course (12 inch depth) 16,556      SQYD 6.50 107,614.00            
                       
 CONTRACTOR TOTAL       829,124.60            