| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 4 - COASTAL BRIDGE CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks and drives
|
7   |
SQYD |
10.00 |
70.00 |
25.00 |
175.00 |
11.00 |
77.00 |
100.00 |
700.00 |
| 202-02-H |
removal of guard rail
|
472   |
LNFT |
4.00 |
1,888.00 |
4.00 |
1,888.00 |
4.00 |
1,888.00 |
10.00 |
4,720.00 |
| 203-08 |
borrow (vehicular measurement)
|
1,108   |
CUYD |
13.00 |
14,404.00 |
15.00 |
16,620.00 |
32.00 |
35,456.00 |
15.00 |
16,620.00 |
| 203-08-A |
borrow (vehicular measurement)(selected soils)
|
652   |
CUYD |
13.00 |
8,476.00 |
15.00 |
9,780.00 |
22.00 |
14,344.00 |
18.00 |
11,736.00 |
| 502-01 |
superpave asphaltic concrete
|
5,474.9 |
TON |
56.00 |
306,594.40 |
45.00 |
246,370.50 |
60.00 |
328,494.00 |
69.00 |
377,768.10 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
704.1 |
TON |
56.00 |
39,429.60 |
45.00 |
31,684.50 |
130.00 |
91,533.00 |
90.00 |
63,369.00 |
| 509-01 |
cold planing asphaltic pavement
|
22,467   |
SQYD |
2.00 |
44,934.00 |
2.00 |
44,934.00 |
1.43 |
32,127.81 |
2.25 |
50,550.75 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 624   |
CUYD |
5.00 |
- 3,120.00 |
0.01 |
- 6.24 |
0.10 |
- 62.40 |
10.00 |
- 6,240.00 |
| 701-08 |
relaying pipe
|
18   |
LNFT |
350.00 |
6,300.00 |
200.00 |
3,600.00 |
100.00 |
1,800.00 |
100.00 |
1,800.00 |
| 701-15 |
concrete collar
|
3   |
EACH |
800.00 |
2,400.00 |
900.00 |
2,700.00 |
750.00 |
2,250.00 |
1,500.00 |
4,500.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
125.0 |
LNFT |
55.00 |
6,875.00 |
52.00 |
6,500.00 |
57.00 |
7,125.00 |
70.00 |
8,750.00 |
| 704-03 |
blocked out guard rail
|
125.0 |
LNFT |
20.00 |
2,500.00 |
17.00 |
2,125.00 |
20.00 |
2,500.00 |
20.00 |
2,500.00 |
| 704-05 |
guard rail anchor sections (bct)
|
18.8 |
LNFT |
70.00 |
1,316.00 |
70.00 |
1,316.00 |
74.00 |
1,391.20 |
65.00 |
1,222.00 |
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
75.0 |
LNFT |
32.00 |
2,400.00 |
40.00 |
3,000.00 |
40.00 |
3,000.00 |
35.00 |
2,625.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
60.00 |
6,000.00 |
55.00 |
5,500.00 |
63.00 |
6,300.00 |
50.00 |
5,000.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
6   |
EACH |
2,400.00 |
14,400.00 |
2,200.00 |
13,200.00 |
2,500.00 |
15,000.00 |
2,850.00 |
17,100.00 |
| 706-01-A |
concrete walk(4" thick)
|
7.1 |
SQYD |
300.00 |
2,130.00 |
135.00 |
958.50 |
1,800.00 |
12,780.00 |
100.00 |
710.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
52,000.00 |
52,000.00 |
5,000.00 |
5,000.00 |
12,500.00 |
12,500.00 |
| 713-03-C |
temporary pavement markings (8" width)
|
510   |
LNFT |
0.50 |
255.00 |
0.20 |
102.00 |
0.25 |
127.50 |
0.45 |
229.50 |
| 713-03-E |
temporary pavement markings (24" width)
|
744   |
LNFT |
1.50 |
1,116.00 |
0.70 |
520.80 |
1.00 |
744.00 |
1.35 |
1,004.40 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
6.990 |
MILE |
32.00 |
223.68 |
500.00 |
3,495.00 |
160.00 |
1,118.40 |
300.00 |
2,097.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.210 |
MILE |
400.00 |
1,284.00 |
100.00 |
321.00 |
300.00 |
963.00 |
370.00 |
1,187.70 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
14.004 |
MILE |
800.00 |
11,203.20 |
10.00 |
140.04 |
570.00 |
7,982.28 |
740.00 |
10,362.96 |
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
6   |
EACH |
60.00 |
360.00 |
25.00 |
150.00 |
57.00 |
342.00 |
54.00 |
324.00 |
| 713-06-C |
temporary pavement legends and symbols (only)
|
6   |
EACH |
60.00 |
360.00 |
25.00 |
150.00 |
57.00 |
342.00 |
54.00 |
324.00 |
| 722-01 |
project site laboratory
|
1   |
each |
500.00 |
500.00 |
1,000.00 |
1,000.00 |
9,000.00 |
9,000.00 |
5,000.00 |
5,000.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
550   |
SQYD |
42.00 |
23,100.00 |
75.00 |
41,250.00 |
85.00 |
46,750.00 |
45.00 |
24,750.00 |
| 726-01 |
bedding material
|
4.4 |
CUYD |
60.00 |
264.00 |
120.00 |
528.00 |
63.00 |
277.20 |
150.00 |
660.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
34,000.00 |
34,000.00 |
100,000.00 |
100,000.00 |
21,000.00 |
21,000.00 |
70,000.00 |
70,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
75.00 |
600.00 |
70.00 |
560.00 |
80.00 |
640.00 |
75.00 |
600.00 |
| 731-02 |
reflectorized raised pavement markers
|
501   |
EACH |
6.00 |
3,006.00 |
6.00 |
3,006.00 |
5.00 |
2,505.00 |
5.20 |
2,605.20 |
| 732-01-C |
plastic pavement striping (8" width)
|
170   |
LNFT |
1.40 |
238.00 |
1.50 |
255.00 |
1.00 |
170.00 |
0.90 |
153.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
248   |
LNFT |
9.00 |
2,232.00 |
10.00 |
2,480.00 |
3.00 |
744.00 |
8.70 |
2,157.60 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.668 |
MILE |
2,200.00 |
10,269.60 |
2,500.00 |
11,670.00 |
2,200.00 |
10,269.60 |
2,200.00 |
10,269.60 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.070 |
MILE |
650.00 |
695.50 |
750.00 |
802.50 |
900.00 |
963.00 |
620.00 |
663.40 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
150.00 |
300.00 |
150.00 |
300.00 |
170.00 |
340.00 |
150.00 |
300.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
160.00 |
320.00 |
175.00 |
350.00 |
170.00 |
340.00 |
150.00 |
300.00 |
| 735-01 |
mailboxes
|
11   |
EACH |
6.00 |
66.00 |
1.00 |
11.00 |
13.00 |
143.00 |
5.00 |
55.00 |
| 735-02 |
mailbox supports (single)
|
11   |
EACH |
140.00 |
1,540.00 |
150.00 |
1,650.00 |
300.00 |
3,300.00 |
120.00 |
1,320.00 |
| 736-09 |
loop detector
|
300   |
LNFT |
13.00 |
3,900.00 |
10.00 |
3,000.00 |
14.00 |
4,200.00 |
12.00 |
3,600.00 |
| 736-10 |
underground junction box
|
1   |
EACH |
300.00 |
300.00 |
300.00 |
300.00 |
300.00 |
300.00 |
250.00 |
250.00 |
| 739-01 |
hydro-seeding
|
2.01 |
ACRE |
1,200.00 |
2,412.00 |
1,100.00 |
2,211.00 |
1,300.00 |
2,613.00 |
2,000.00 |
4,020.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
7,000.00 |
7,000.00 |
15,000.00 |
15,000.00 |
6,200.00 |
6,200.00 |
10,000.00 |
10,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
| S-001 |
u-channel post installation
|
37   |
each |
70.00 |
2,590.00 |
70.00 |
2,590.00 |
75.00 |
2,775.00 |
70.00 |
2,590.00 |
| S-002 |
cleaning existing ditches
|
100   |
LNFT |
12.00 |
1,200.00 |
12.00 |
1,200.00 |
4.00 |
400.00 |
15.00 |
1,500.00 |
| S-003 |
cement treated base course (12 inch depth)
|
16,556   |
SQYD |
6.40 |
105,958.40 |
6.00 |
99,336.00 |
6.30 |
104,302.80 |
5.00 |
82,780.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
692,290.38 |
|
749,723.60 |
|
799,855.39 |
|
825,034.21 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - BARBER BROS. CONTRACTING CO., L.L.C |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks and drives
|
7   |
SQYD |
100.00 |
700.00 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
472   |
LNFT |
15.00 |
7,080.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
1,108   |
CUYD |
20.00 |
22,160.00 |
|
|
|
|
|
|
| 203-08-A |
borrow (vehicular measurement)(selected soils)
|
652   |
CUYD |
18.00 |
11,736.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
5,474.9 |
TON |
55.00 |
301,119.50 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
704.1 |
TON |
75.00 |
52,807.50 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
22,467   |
SQYD |
2.50 |
56,167.50 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 624   |
CUYD |
FREE |
FREE |
|
|
|
|
|
|
| 701-08 |
relaying pipe
|
18   |
LNFT |
200.00 |
3,600.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
3   |
EACH |
1,000.00 |
3,000.00 |
|
|
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
125.0 |
LNFT |
60.00 |
7,500.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
125.0 |
LNFT |
25.00 |
3,125.00 |
|
|
|
|
|
|
| 704-05 |
guard rail anchor sections (bct)
|
18.8 |
LNFT |
75.00 |
1,410.00 |
|
|
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
75.0 |
LNFT |
40.00 |
3,000.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
65.00 |
6,500.00 |
|
|
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
6   |
EACH |
2,600.00 |
15,600.00 |
|
|
|
|
|
|
| 706-01-A |
concrete walk(4" thick)
|
7.1 |
SQYD |
200.00 |
1,420.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
510   |
LNFT |
1.00 |
510.00 |
|
|
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
744   |
LNFT |
2.00 |
1,488.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
6.990 |
MILE |
450.00 |
3,145.50 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.210 |
MILE |
420.00 |
1,348.20 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
14.004 |
MILE |
850.00 |
11,903.40 |
|
|
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
6   |
EACH |
75.00 |
450.00 |
|
|
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
6   |
EACH |
75.00 |
450.00 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
each |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
550   |
SQYD |
65.00 |
35,750.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
4.4 |
CUYD |
120.00 |
528.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
80.00 |
640.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
501   |
EACH |
6.00 |
3,006.00 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
170   |
LNFT |
2.00 |
340.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
248   |
LNFT |
10.00 |
2,480.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.668 |
MILE |
2,500.00 |
11,670.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.070 |
MILE |
1,000.00 |
1,070.00 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
200.00 |
400.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
200.00 |
400.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
11   |
EACH |
6.00 |
66.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
11   |
EACH |
150.00 |
1,650.00 |
|
|
|
|
|
|
| 736-09 |
loop detector
|
300   |
LNFT |
15.00 |
4,500.00 |
|
|
|
|
|
|
| 736-10 |
underground junction box
|
1   |
EACH |
500.00 |
500.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
2.01 |
ACRE |
1,500.00 |
3,015.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| S-001 |
u-channel post installation
|
37   |
each |
75.00 |
2,775.00 |
|
|
|
|
|
|
| S-002 |
cleaning existing ditches
|
100   |
LNFT |
15.00 |
1,500.00 |
|
|
|
|
|
|
| S-003 |
cement treated base course (12 inch depth)
|
16,556   |
SQYD |
6.50 |
107,614.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
829,124.60 |
|
|
|
|
|
|
|