Error processing SSI file
Error processing SSI file
Bid Tabs Error processing SSI file
Bid Tabulations Error processing SSI file
February 06, 2014 Error processing SSI file

Letting of 12/14/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 260-05-0023
Parish: LIVINGSTON
Routes: LA 22
Description: JCT.LA 444 - JCT. LA 42
Type Const: grading, drainage structures, cold planing asphaltic concrete, superpave asphaltic
concrete, pavement patching, pavement widening and related work.
 
RankLicenseBidderAmount
112487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,575,223.46
206276 BARRIERE CONSTRUCTION CO., LLC. $1,596,943.14
300849 F.G. SULLIVAN, JR. CONTRACTOR LLC $1,918,415.10
400046 BARBER BROS. CONTRACTING CO., L.L.C $1,935,398.90
500481 COASTAL BRIDGE CO., L.L.C. $2,052,157.96
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.
- 3 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
- 4 -
BARBER BROS. CONTRACTING CO., L.L.C
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-I removal of drainage structure 1      EACH 6,000.00 6,000.00 5,000.00 5,000.00 6,000.00 6,000.00 10,000.00 10,000.00
203-08 borrow (vehicular measurement) 100      CUYD 36.00 3,600.00 14.00 1,400.00 20.00 2,000.00 35.00 3,500.00
204-02 temporary hay or straw bales 36      EACH 13.00 468.00 9.00 324.00 10.00 360.00 10.00 360.00
204-06 temporary silt fencing 360      LNFT 4.00 1,440.00 2.00 720.00 5.00 1,800.00 5.00 1,800.00
401-02 aggregate surface course (adjusted vehicular
measurement)
814      CUYD 25.00 20,350.00 54.00 43,956.00 40.00 32,560.00 36.00 29,304.00
502-01 superpave asphaltic concrete 12,771.3    TON 47.00 600,251.10 55.00 702,421.50 50.00 638,565.00 60.00 766,278.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
809.5    TON 115.00 93,092.50 55.00 44,522.50 115.00 93,092.50 75.00 60,712.50
509-01 cold planing asphaltic pavement 5,245      SQYD 2.64 13,846.80 3.00 15,735.00 3.00 15,735.00 5.00 26,225.00
509-02 contractor retained reclaimed asphaltic pavement - 146      CUYD 0.10 - 14.60 5.00 - 730.00 0.10 - 14.60 FREE FREE
701-02-D/D cross drain pipe arch (24" equiv. rcpa or 24" equiv.
cmpa)
40      LNFT 82.00 3,280.00 80.00 3,200.00 200.00 8,000.00 200.00 8,000.00
701-03-I storm drain pipe (24" rcp/pcp) 8      LNFT 92.00 736.00 60.00 480.00 150.00 1,200.00 200.00 1,600.00
702-03-A catch basins (cb-01) 1      EACH 4,000.00 4,000.00 3,000.00 3,000.00 4,000.00 4,000.00 4,000.00 4,000.00
702-03-B catch basins (cb-02) 1      EACH 4,000.00 4,000.00 3,500.00 3,500.00 4,000.00 4,000.00 4,000.00 4,000.00
702-07-C cross drain safety end (type 3) 17      EACH 7,000.00 119,000.00 5,500.00 93,500.00 4,500.00 76,500.00 4,700.00 79,900.00
713-01 temporary signs & barricades lump      LUMP 11,000.00 11,000.00 20,000.00 20,000.00 100,000.00 100,000.00 50,000.00 50,000.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
13.694  MILE 140.00 1,917.16 150.00 2,054.10 500.00 6,847.00 300.00 4,108.20
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
2.110  MILE 270.00 569.70 400.00 844.00 100.00 211.00 420.00 886.20
713-05-A temporary pavement markings (solid line)(4" width) 26.300  MILE 540.00 14,202.00 800.00 21,040.00 100.00 2,630.00 850.00 22,355.00
724-01-B pavement patching (12" minimum thickness) 850      SQYD 77.00 65,450.00 50.00 42,500.00 100.00 85,000.00 60.00 51,000.00
724-02 pavement widening 12,514.8    SQYD 29.00 362,929.20 29.50 369,186.60 37.00 463,047.60 35.00 438,018.00
726-01 bedding material 27.4    CUYD 49.00 1,342.60 70.00 1,918.00 60.00 1,644.00 60.00 1,644.00
727-01 mobilization lump      LUMP 50,000.00 50,000.00 145,000.00 145,000.00 103,000.00 103,000.00 100,000.00 100,000.00
729-16-C object marker assembly (type 3) 36      EACH 80.00 2,880.00 75.00 2,700.00 80.00 2,880.00 85.00 3,060.00
731-01 non-reflectorized raised pavement markers 50      EACH 11.00 550.00 13.00 650.00 15.00 750.00 15.00 750.00
731-02 reflectorized raised pavement markers 605      EACH 5.00 3,025.00 6.00 3,630.00 6.00 3,630.00 6.00 3,630.00
732-01-C plastic pavement striping (8" width) 264      LNFT 1.00 264.00 1.00 264.00 1.00 264.00 1.50 396.00
732-01-E plastic pavement striping (24" width) 11      LNFT 3.00 33.00 5.00 55.00 4.00 44.00 3.50 38.50
732-02-A plastic pavement striping (solid line) (4" width) 56.620  MILE 2,100.00 118,902.00 22.00 1,245.64 2,300.00 130,226.00 2,500.00 141,550.00
732-03-A plastic pavement striping (broken line)(4" width) 2.642  MILE 750.00 1,981.50 650.00 1,717.30 800.00 2,113.60 750.00 1,981.50
732-04-A plastic pavement legends & symbols (arrow) 4      EACH 160.00 640.00 150.00 600.00 200.00 800.00 200.00 800.00
732-04-B plastic pavement legends & symbols (only) 4      EACH 160.00 640.00 160.00 640.00 200.00 800.00 200.00 800.00
732-05 removal of existing markings 1.935  MILE 4,500.00 8,707.50 4,500.00 8,707.50 4,000.00 7,740.00 5,000.00 9,675.00
735-01 mailboxes 67      EACH 5.00 335.00 6.00 402.00 5.00 335.00 6.00 402.00
735-02 mailbox supports (single) 67      EACH 140.00 9,380.00 130.00 8,710.00 135.00 9,045.00 150.00 10,050.00
739-01 hydro-seeding 5.45   ACRE 900.00 4,905.00 1,000.00 5,450.00 1,000.00 5,450.00 1,500.00 8,175.00
740-01 construction layout lump      LUMP 21,500.00 21,500.00 16,000.00 16,000.00 50,000.00 50,000.00 30,000.00 30,000.00
744-01 traffic control management lump      LUMP 17,000.00 17,000.00 20,000.00 20,000.00 50,000.00 50,000.00 50,000.00 50,000.00
S-001 u-channel post installation 112      EACH 60.00 6,720.00 50.00 5,600.00 55.00 6,160.00 75.00 8,400.00
S-002 cleaning existing ditches 100      LNFT 3.00 300.00 10.00 1,000.00 20.00 2,000.00 20.00 2,000.00
                       
 CONTRACTOR TOTAL       1,575,223.46   1,596,943.14   1,918,415.10   1,935,398.90
 
Item Number Item Description Quantity Unit of Measure - 5 -
COASTAL BRIDGE CO., L.L.C.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-I removal of drainage structure 1      EACH 5,000.00 5,000.00            
203-08 borrow (vehicular measurement) 100      CUYD 15.00 1,500.00            
204-02 temporary hay or straw bales 36      EACH 10.00 360.00            
204-06 temporary silt fencing 360      LNFT 2.00 720.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
814      CUYD 70.00 56,980.00            
502-01 superpave asphaltic concrete 12,771.3    TON 65.00 830,134.50            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
809.5    TON 85.00 68,807.50            
509-01 cold planing asphaltic pavement 5,245      SQYD 3.00 15,735.00            
509-02 contractor retained reclaimed asphaltic pavement - 146      CUYD 1.00 - 146.00            
701-02-D/D cross drain pipe arch (24" equiv. rcpa or 24" equiv.
cmpa)
40      LNFT 75.00 3,000.00            
701-03-I storm drain pipe (24" rcp/pcp) 8      LNFT 60.00 480.00            
702-03-A catch basins (cb-01) 1      EACH 2,500.00 2,500.00            
702-03-B catch basins (cb-02) 1      EACH 3,000.00 3,000.00            
702-07-C cross drain safety end (type 3) 17      EACH 4,500.00 76,500.00            
713-01 temporary signs & barricades lump      LUMP 25,000.00 25,000.00            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
13.694  MILE 300.00 4,108.20            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
2.110  MILE 370.00 780.70            
713-05-A temporary pavement markings (solid line)(4" width) 26.300  MILE 1.00 26.30            
724-01-B pavement patching (12" minimum thickness) 850      SQYD 65.00 55,250.00            
724-02 pavement widening 12,514.8    SQYD 43.50 544,393.80            
726-01 bedding material 27.4    CUYD 100.00 2,740.00            
727-01 mobilization lump      LUMP 150,000.00 150,000.00            
729-16-C object marker assembly (type 3) 36      EACH 75.00 2,700.00            
731-01 non-reflectorized raised pavement markers 50      EACH 12.00 600.00            
731-02 reflectorized raised pavement markers 605      EACH 5.20 3,146.00            
732-01-C plastic pavement striping (8" width) 264      LNFT 0.90 237.60            
732-01-E plastic pavement striping (24" width) 11      LNFT 2.70 29.70            
732-02-A plastic pavement striping (solid line) (4" width) 56.620  MILE 1.00 56.62            
732-03-A plastic pavement striping (broken line)(4" width) 2.642  MILE 620.00 1,638.04            
732-04-A plastic pavement legends & symbols (arrow) 4      EACH 135.00 540.00            
732-04-B plastic pavement legends & symbols (only) 4      EACH 150.00 600.00            
732-05 removal of existing markings 1.935  MILE 4,000.00 7,740.00            
735-01 mailboxes 67      EACH 5.00 335.00            
735-02 mailbox supports (single) 67      EACH 135.00 9,045.00            
739-01 hydro-seeding 5.45   ACRE 1,600.00 8,720.00            
740-01 construction layout lump      LUMP 80,000.00 80,000.00            
744-01 traffic control management lump      LUMP 80,000.00 80,000.00            
S-001 u-channel post installation 112      EACH 75.00 8,400.00            
S-002 cleaning existing ditches 100      LNFT 15.00 1,500.00            
                       
 CONTRACTOR TOTAL       2,052,157.96            